Roads18LE0067

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO BRGY. OGPAO VARIOUS BEACHES, SITIO LOGPOND, BRGY. SAN AGUSTIN, STA. MARIA, DAVAO OCCIDENTALSTA. 0 + 000 - STA. 1 + 260

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO BRGY. OGPAO VARIOUS BEACHES, SITIO LOGPOND, BRGY. SAN AGUSTIN, STA. MARIA, DAVAO OCCIDENTALSTA. 0 + 000 - STA. 1 + 260 is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱28,129,746.44. Status: Reported complete (DPWH). Contractor on record: MM MASULOT CONST CORP. Figures trace to dpwh.

Davao Occidental DEO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱30,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-LGRCB-18-0025292 · ₱50,900,000 · release to the district office, not itemized per project

    Possible match · score 0.76

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18LE0067 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-04-10 → 2025-09-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱22,325,196 per km= 1.1x the Region XI median (n=48)

Contract cost ₱28,129,746 ÷ 1.26 km read from the DPWH title (“STA. 0 + 000 - STA. 1 + 260”; K-post / station range length). National percentile: 39. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION /  IMPROVEMENT OF ACCESS ROADS LEADING TO BRGY. OGPAO VARIOUS BEACHES, SITIO LOGPOND, BRGY. SAN AGUSTIN, STA. MARIA, DAVAO OCCIDENTALSTA. 0 + 000 - STA. 1 + 260

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Concrete Seawall (RC Cut-off Wall) at Sitio Besang, Brgy. Lais, Malita, Davao Occidental
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-LGRCB-18-0025292

₱50,900,000.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

59 projects · ₱1.8B total · 0 flags

4. Implementation

Contract Amount

₱28,129,746.44

Progress

Reported complete (DPWH)

Start Date

April 11, 2018

Target End

September 16, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OccidentalSanta MariaSan Agustin
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideStorm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.