REPAIR/ REHABILITATION OF FLOOD CONTROL, LIPIT BRIDGE, BALER-CASIGURAN ROAD
REPAIR/REHABILITATION OF FLOOD CONTROL, LIPIT BRIDGE, BALER-CASIGURAN ROAD is a DPWH-tracked public work in Aurora DEO, Region III. Reported contract value: ₱1,525,391.77. Status: Reported complete (DPWH). Contractor on record: MORNING STEEL CONST. Figures trace to dpwh.
DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.
No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.
Total Contract Cost

