Roads18CN0015

ASSET PRESERVATION PROGRAM (PREVENTIVE MAINTENANCE OF ROAD), DINGALAN-GABALDON ROAD (SO1532LZ) K0175+870 TO K0177+892

ASSET PRESERVATION PROGRAM (PREVENTIVE MAINTENANCE OF ROAD), DINGALAN-GABALDON ROAD (SO1532LZ) K0175+870 TO K0177+892 is a DPWH-tracked public work in Aurora DEO, Region III. Reported contract value: ₱21,609,980.00. Status: Reported complete (DPWH). Contractor on record: THREE W BUILDERS INC. Figures trace to dpwh.

Aurora DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-F-18-0015044 · ₱1,514,931 · release to the district office, not itemized per project

    Possible match · score 0.81

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18CN0015 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-03-30 → 2021-04-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱10,687,428 per km= 0.4x the Region III median (n=352)

Contract cost ₱21,609,980 ÷ 2.022 km read from the DPWH title (“K0175+870 TO K0177+892”; K-post / station range length). National percentile: 14. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION PROGRAM (PREVENTIVE MAINTENANCE OF ROAD), DINGALAN-GABALDON ROAD (SO1532LZ) K0175+870 TO K0177+892

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Abitonan River Control, Brgy. Toytoyan, Dipaculao, Aurora
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-F-18-0015044

₱1,514,931.00 · FY2018

Released to Aurora DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

416 projects · ₱20.3B total · 2 flags

4. Implementation

Contract Amount

₱21,609,980.00

Progress

Reported complete (DPWH)

Start Date

April 23, 2018

Target End

July 28, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)AuroraDingalanCaragsacan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.