Roads25A00170

CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR (PACKAGE 5)

CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR (PACKAGE 5) is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱93,628,785.38. Status: Past target date (DPWH On-Going). Contractor on record: A I P CONST. Figures trace to dpwh.

Region I, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱93,628,785 · A.I.P. CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    88% reported · imagery 2023-11-16 → 2023-11-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR (PACKAGE 5)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25A00170

₱93,628,785.38 · A.I.P. CONSTRUCTION

Award / contract ref: 25A00170

Contractor

B

141 projects · ₱9.3B total · 1 flags

Other projects by this contractor

No sat.

CLUSTER: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MT. PROVINCE - CAGAYAN VIA TABUK - ENRILE R

Cordillera Administrative Region, Cordillera Administrative Region

2021₱289.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLIS

Cordillera Administrative Region, Cordillera Administrative Region

2021₱284.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A)

Cordillera Administrative Region, Cordillera Administrative Region

2020₱235.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLISTT O

Cordillera Administrative Region, Cordillera Administrative Region

2022₱193.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT. PROVINCE - ILOCOS SUR VIA TUE RD, K0387+(-081) - K0388+189, K0388+227 - K0388+867, K0388+939 - K0388+1069

Cordillera Administrative Region, Cordillera Administrative Region

2024₱193.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT. PROVINCE - N VIZCAYA RD - K0363+(-785) - K0372+1019, K0372+1041 - K0375+000BONTOC, MT. PROVINCE

Cordillera Administrative Region, Cordillera Administrative Region

2024₱193.0M
Past target date (DPWH On-Going)
View all 141 projects →

4. Implementation

Contract Amount

₱93,628,785.38

Progress

Past target date (DPWH On-Going)

Start Date

February 21, 2025

Target End

November 17, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos SurQuirinoPatiacan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.