Roads24BI0032

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS PAPAYA MALABING WANGAL BINUGAWAN TADJI RUNRUNO RD K0312 +300 K0313+535

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS PAPAYA MALABING WANGAL BINUGAWAN TADJI RUNRUNO RD K0312 +300 K0313+535 is a DPWH-tracked public work in Nueva Vizcaya DEO, Region II. Reported contract value: ₱24,500,000.00. Status: Reported complete (DPWH). Contractor on record: MONTE CONST. Figures trace to dpwh.

Nueva Vizcaya DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24BI0032 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-08-07 → 2023-08-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM  ASSET PRESERVATION       REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS  TERTIARY  ROADS  PAPAYA  MALABING  WANGAL  BINUGAWAN  TADJI  RUNRUNO RD    K0312 +300  K0313+535

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bambang Cupas CIS Canal Lining and Flood Control Structure, Bambang, Nueva Vizcaya
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Nueva Vizcaya DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

27 projects · ₱286.3M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURE WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUCT

Nueva Vizcaya DEO, Region II

2020₱33.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF JACINTO ESQUI

Nueva Vizcaya DEO, Region II

2023₱19.6M
Reported complete (DPWH)
No sat.

ORGANIZATION OUTCOME 2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WIT

Nueva Vizcaya DEO, Region II

2019₱19.6M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROAD, PAPAYA MALABING WANGAL BINUGAWAN - TADJI RUNRUNO ROAD, K0314+208, RUNRUNO, QUEZON, NUEVA VIZCAYA

Nueva Vizcaya DEO, Region II

2023₱19.3M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE TERTIARY ROAD, BAMBANG-KASIBU-QUEZON-SOLANO ROAD, K0330+650, DARUBBA, QUEZON, NUEVA VIZCAYA

Nueva Vizcaya DEO, Region II

2023₱19.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES, MADDIANGAT SECTION ALONG MAGAT RI

Nueva Vizcaya DEO, Region II

2018₱18.8M
Reported complete (DPWH)
View all 27 projects →

4. Implementation

Contract Amount

₱24,500,000.00

Progress

Reported complete (DPWH)

Start Date

February 20, 2024

Target End

July 9, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaKasibuTadji
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.