Buildings and Facilities19PK0019

CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERTED COURT), BARANGAY ABLEG, PASIL, KALINGA

CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERTED COURT), BARANGAY ABLEG, PASIL, KALINGA is a DPWH-tracked public work in Upper Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱1,976,802.39. Status: Reported complete (DPWH). Contractor on record: BLESSING BUILDERS AND CONST SUPPLY. Figures trace to dpwh.

Upper Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROIVB-19-0008731 · ₱92,803 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,976,802 · BLESSING BUILDERS AND CONSTRUCTION SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-06-08 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERTED COURT), BARANGAY ABLEG, PASIL, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-19-0008731

₱92,803.00 · FY2019

Released to Balugo National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

19PK0019

₱1,976,802.39 · BLESSING BUILDERS AND CONSTRUCTION SUPPLY

Award / contract ref: 19PK0019

Contractor

C

100 projects · ₱723.5M total · 0 flags

Other projects by this contractor

No sat.

PACKAGE 1: REHABILITATION/RECONSTRUCTION OF RD WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE NAT'L RD, MT. PROVINCE-CALANAN-PINUKPUK-ABBUT RD, A) K0524-460 - K0524+490, B) K0524+460 - K0524+510, C) K0524+520 - K0524+550, D) K0530+600 - K0530+620, E)K0531+790 - K

Lower Kalinga DEO, Cordillera Administrative Region

2018₱44.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT: PAVING OF UNPAVED ROADS - TERTIARY ROADS LUBUAGAN - BATONG BUHAY - ABRA BDRY RD K0473 + 738 - K0474 + 690

Upper Kalinga DEO, Cordillera Administrative Region

2021₱36.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ABLEG-MOLAYONG-AMDALAO RD

Upper Kalinga DEO, Cordillera Administrative Region

2024₱33.5M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, APAYAO-ILOCOS NORTE RD - K0623+020 - K0623+735

Apayao 1st DEO, Cordillera Administrative Region

2021₱28.7M
Reported complete (DPWH)
No sat.

OFF-CARRIAGE IMPROVEMENT INCLUDING DRAINAGE SECONDARY ROADS, ABBUT-CONNER ROADS, K0540+(-375) - K0540+(-255), K0540+(-225) - K0540+(-085), K0540+(-085) - K0541+240, K0541+258 - K0541+534

Apayao 1st DEO, Cordillera Administrative Region

2017₱27.1M
Reported complete (DPWH)
No sat.

REPAIR/REHABILITATION OF ROAD PROJECTS IN APAYAO DAMAGED BY TYPHOON FALCON

Apayao 1st DEO, Cordillera Administrative Region

2019₱25.6M
Reported complete (DPWH)
View all 100 projects →

4. Implementation

Contract Amount

₱1,976,802.39

Progress

Reported complete (DPWH)

Start Date

July 7, 2019

Target End

September 4, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaPasilAbleg
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.