Roads21OH0085

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AN BRIDGES-IMPROVEMENT OF LOCAL ROAD INCLUDING DRAINAGE, BRGY. 841 AND 842, PANDACAN, MANILA

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AN BRIDGES-IMPROVEMENT OF LOCAL ROAD INCLUDING DRAINAGE, BRGY. 841 AND 842, PANDACAN, MANILA is a DPWH-tracked public work in South Manila DEO, National Capital Region. Reported contract value: ₱18,808,870.63. Status: Reported complete (DPWH). Contractor on record: JMK BUILDERS CONST. Figures trace to dpwh.

South Manila DEO, National Capital Region
Region: National Capital Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21OH0085 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-30 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AN BRIDGES-IMPROVEMENT OF LOCAL ROAD INCLUDING DRAINAGE, BRGY. 841 AND 842, PANDACAN, MANILA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Improvement of Flood Mitigation Structures, Libertad Flood Control Channel, Pasay City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

South Manila DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

163 projects · ₱1.8B total · 2 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-ROXAS BLVD.-K0003+(-110)-K0005+(240), ROXAS BLVD., PASAY CITY

South Manila DEO, National Capital Region

2022₱134.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-ROXAS BLVD - K0004 + 048 - K0004 + 835

South Manila DEO, National Capital Region

2025₱95.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM/ASSET PRESERVATION PROGRAM/REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - ROXAS BLVD - K0002 + 585 - K0001 + 441

South Manila DEO, National Capital Region

2025₱95.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-ROXAS BLVD., K0000+216.50-K0002+011.50, MANIILA

South Manila DEO, National Capital Region

2022₱89.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - BANK IMPROVEMENT (STEEL SHEET PILE), ALONG ESTERO DE SAN MIGUEL, STA.

North Manila DEO, National Capital Region

2020₱48.9M
Reported complete (DPWH)
No sat.

MFO 1-NATIONAL ROAD NETWORK SERVICES-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONA

North Manila DEO, National Capital Region

2016₱45.5M
Reported complete (DPWH)
View all 163 projects →

4. Implementation

Contract Amount

₱18,808,870.63

Progress

Reported complete (DPWH)

Start Date

May 12, 2021

Target End

December 7, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaPacoBarangay 678
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.