WIDENING OF PUERTO PRINCESA SOUTH ROAD (PPSR) FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS, KO202+370.00 TO KO205+400.00; KO205+548.00 TO KO206+835.00, PALAWAN
WIDENING OF PUERTO PRINCESA SOUTH ROAD (PPSR) FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS, KO202+370.00 TO KO205+400.00; KO205+548.00 TO KO206+835.00, PALAWAN is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱169,177,978.88. Status: Reported complete (DPWH). Contractor on record: SYNDTITE CONST CORP FORMERLY: R C TAGALA CONST. Figures trace to dpwh.
Total Contract Cost

