Flood Control and Drainage17FF0070No coordinates published by DPWH

CONSTRUCTION OF FLOOD CONTROL, BARANGAY PUGAY, SAN JOSE, CAMARINES SUR

CONSTRUCTION OF FLOOD CONTROL, BARANGAY PUGAY, SAN JOSE, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 4th DEO, Region V. Reported contract value: ₱18,510,045.16. Status: Reported complete (DPWH). Contractor on record: SPRING STAR CONST AND SUPPLY. Figures trace to dpwh.

Camarines Sur 4th DEO, Region V

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱3,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0009159 · ₱86,116 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17FF0070 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-09-02 → 2025-03-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL, BARANGAY PUGAY, SAN JOSE, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱3,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Brgy. San Jose, Baao, Camarines Sur
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0009159

₱86,116.00 · FY2017

Released to Division of Camarines Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

225 projects · ₱6.8B total · 2 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BALUD NATIONAL ROAD CONNECTING BARANG

Masbate 2nd DEO, Region V

2023₱135.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - C0NSTRUCTION/IMPROVEMENT OF ACCESS OF ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - BALUD - PALANI - PANUBIGAN - PAJO -TALISAY ROAD LEADING TO PALANI BEACHES, PANUBIGA

Masbate 2nd DEO, Region V

2023₱115.8M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS, MALUBI - CABANGCALAN - DAYHAGAN - TINIGBAN - MATABA ROAD, MASBATE, STA.5+101 - STA.6+245, AROROY, MASBATE

Masbate 2nd DEO, Region V

2022₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MANDAON - DAYHAGAN ROAD, PACKAGE 1, MASBATE

Masbate 2nd DEO, Region V

2024₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MANDAON - DAYHAGAN - ROAD, STA.4+350 - STA.5+750, MANDAON, MASBATE

Masbate 2nd DEO, Region V

2022₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MALUBI - CABANGCALAN - DAYHAGAN - TINIGBAN - MATABA ROAD, MASBATE, STA. 3+892 - STA. 5+052, NET LENGTH = 2.320 LANE KM (1.160 KM), AROROY, MASBATE

Masbate 2nd DEO, Region V

2021₱96.5M
Reported complete (DPWH)
View all 225 projects →

4. Implementation

Contract Amount

₱18,510,045.16

Progress

Reported complete (DPWH)

Start Date

June 30, 2017

Target End

December 28, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurSan Jose
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.