Buildings and Facilities17PC0085No coordinates published by DPWH

PACKAGE IV. 1.) CONSTRUCTION OF MATAGUISI COMPREHENSIVE H/S MAIN 1 CL WORKSHOP BUILDING (7X18) 2. CONSTRUCTION OF MATAGUISI COMPREHENSIVE H/S MAIN 1 CL WORKSHOP BUILDING (7X18) 3. CONSTRUCTION OF MATAGUISI COMPREHENSIVE NHS, CACALAGGAN ANNEX 1 STOREY 2CL

PACKAGE IV. 1.) CONSTRUCTION OF MATAGUISI COMPREHENSIVE H/S MAIN 1 CL WORKSHOP BUILDING (7X18) 2. CONSTRUCTION OF MATAGUISI COMPREHENSIVE H/S MAIN 1 CL WORKSHOP BUILDING (7X18) 3. CONSTRUCTION OF MATAGUISI COMPREHENSIVE NHS, CACALAGGAN ANNEX 1 STOREY 2CL is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱9,196,993.97. Status: Reported complete (DPWH). Contractor on record: CMG JR BUILDERS. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Cordillera Administrative Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱35,000 (shared by many projects, not this project's own line)

    Possible match · score 0.73

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0001304 · ₱350,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17PC0085 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PACKAGE IV. 1.) CONSTRUCTION OF MATAGUISI COMPREHENSIVE H/S MAIN 1 CL WORKSHOP BUILDING (7X18) 2.  CONSTRUCTION OF MATAGUISI COMPREHENSIVE H/S MAIN 1 CL WORKSHOP BUILDING (7X18) 3. CONSTRUCTION OF MATAGUISI COMPREHENSIVE NHS, CACALAGGAN ANNEX 1 STOREY 2CL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 73%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Yawa Flood Control, Legazpi City, Albay
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0001304

₱350,000.00 · FY2017

Released to Taft National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

112 projects · ₱2.3B total · 2 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: ROAD WIDENING-PRIMARY ROADS-CAGAYAN VALLEY ROAD; K0531+000-K0533+398, GATTARAN, CAGAYAN

Region II, Region II

2020₱102.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG C

Cagayan 2nd DEO, Region II

2025₱96.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, MARUAYA-DUPITAC-CALAMBEG ESTANCIA ROAD LEADING TO LOWLAND COFFEE CONVERGENCE INITIATIVE PROJECT, BRGY. MARUAYA, PIDDIG, ILOCOS NORTE

Region I, Region I

2018₱93.2M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0677+000 - K0678+406

Apayao 2nd DEO, Cordillera Administrative Region

2025₱81.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP)- ABULUG- BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS,

Cagayan 2nd DEO, Region II

2024₱72.2M
Reported complete (DPWH)
No sat.

OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0681+473 - K0682+529

Apayao 2nd DEO, Cordillera Administrative Region

2025₱57.1M
Past target date (DPWH On-Going)
View all 112 projects →

4. Implementation

Contract Amount

₱9,196,993.97

Progress

Reported complete (DPWH)

Start Date

December 27, 2017

Target End

May 25, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Apayao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.