Roads25PG0040

PREVENTIVE MAINTENACE - SECONDARY ROADS - NUEVA VIZCAYA-IFUGAO-MT. PROVINCE ROAD - K0306+060 - K0307+000, KIANGAN, IFUGAO

PREVENTIVE MAINTENACE - SECONDARY ROADS - NUEVA VIZCAYA-IFUGAO-MT. PROVINCE ROAD - K0306+060 - K0307+000, KIANGAN, IFUGAO is a DPWH-tracked public work in Ifugao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱17,564,385.67. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: A P D CONST INC FORMERLY: APD CONST. Figures trace to dpwh.

Ifugao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25PG0040 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-08-07 → 2025-04-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PREVENTIVE MAINTENACE - SECONDARY ROADS - NUEVA VIZCAYA-IFUGAO-MT. PROVINCE ROAD - K0306+060 - K0307+000, KIANGAN, IFUGAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Poblacion Pakawit Communal Irrigation System (CIS), Tinoc, Ifugao
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Ifugao 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

355 projects · ₱12.1B total · 1 flags

Other projects by this contractor

No sat.

NETWORK DEV'T PROGRAM: CONST'N OF MISSING LINKS/NEW ROADS JCT. VICTORIA-MADDELA-ALICIA-KASIBU, NUEVA VIZCAYA ROAD, QUIRINO, STA. 0+000-STA. 4+500, AGLIPAY, QUIRINO

Region II, Region II

2018₱185.7M
Reported complete (DPWH)
No sat.

OO 1. NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROAD-JCT. ABBAG-GUINGIN BOUNDARY ROAD (BUCAO-LA CONWAP SECTION) QUIRINO, STA. 0+000-STA. 3+040 (CONCRETING, STA. 3+320-STA. 4+240 (OPENING), QUIRINO LONE DISTRICT

Region II, Region II

2018₱166.7M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - ARITAO-QUIRINO ROAD, PACKAGE 1, QUIRINO

Region II, Region II

2024₱158.9M
Reported complete (DPWH)
No sat.

MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: CONST'N OF MISSING GAPS CONNECTING NAT'L ROADS INCLUDING ROW, JCT. ABBAG-GUINGIN BDRY. ROAD (BUCAO-LA CONWAP SECTION) INCLUDING SLOPE PROTECTION, STA. 000+000-STA.001+680, STA. 002+220-STA.003+770, NAGTIP

Region II, Region II

2017₱142.0M
Reported complete (DPWH)
No sat.

MFO 3:MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-TO DECLARED TOURISM DESTINATIONS-NRJ GUNDAWAY-SUSONG DALAGA, ZAMORA SAN MARCOS-

Region II, Region II

2017₱141.7M
Reported complete (DPWH)
No sat.

MFO 1: NAT'L RD. NETWORK SERVICES: RD. UPGRADING(UNPAVED TO PAVED) BASED ON GRAVEL RD. STRATEGIES, TRAFIC BENCHMARK FOR UPGRADING TO PAVED RD. STANDARD(HDM 4-PROJ.ANALYSIS),TERTIARY RD., JCT. ABBAG-GUINGIN BDRY. RD.

Region II, Region II

2017₱133.8M
Reported complete (DPWH)
View all 355 projects →

4. Implementation

Contract Amount

₱17,564,385.67

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

March 27, 2025

Target End

September 22, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)IfugaoKianganBolog
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.