Roads22HC0020

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE- SECONDARY ROAD: LOAY INTERIOR RD K0127+000 - K0127+788, TRINIDAD, BOHOL

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE- SECONDARY ROAD: LOAY INTERIOR RD K0127+000 - K0127+788, TRINIDAD, BOHOL is a DPWH-tracked public work in Bohol 2nd DEO, Region VII. Reported contract value: ₱15,672,893.07. Status: Reported complete (DPWH). Contractor on record: CEBU 7H TECHNOCHEM INDUSTRIES INC. Figures trace to dpwh.

Bohol 2nd DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱35,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22HC0020 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-31 → 2020-03-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱19,889,458 per km= 0.6x the Region VII median (n=215)

Contract cost ₱15,672,893 ÷ 0.788 km read from the DPWH title (“K0127+000 - K0127+788”; K-post / station range length). National percentile: 35. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE- SECONDARY ROAD: LOAY INTERIOR RD K0127+000 - K0127+788, TRINIDAD, BOHOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Capayas Flood Control, Ubay, Bohol
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Bohol 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

121 projects · ₱5.5B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURE AT BARANGAY PITOGO, CARLOS P. GARCIA, BOHOL

Region VII, Region VII

2024₱197.6M
Past target date (DPWH On-Going)
No sat.

OO 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-TERTIARY ROADS, JCT. (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD, K0017+000-K0017+065, K0017+572-K0018+000, K0019+000-K0019+906, K0024+000-K0025+000,K0

Region VII, Region VII

2024₱193.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0031 + 580 - K0031 +735, K0032 + 262 - K0032 + 600, K0036 + 186 - K0036+686, K0036+692-K0036+

Region VII, Region VII

2024₱178.4M
Ongoing (DPWH-reported)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-SECONDARY ROADS, LOAY INTERIOR ROAD - K0129 + 855 - K0132 + 013 , K0137 + 000 - K0139 + 582

Region VII, Region VII

2024₱168.8M
Ongoing (DPWH-reported)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SYSTEM, BRIDGE PROGRAM REPLACEMENT OF PERMANENT WEAK BRIDGES BACONG BR. (B00005BH) ALONG TAGBILARAN JETAFE SECTION, BOHOL PROVINCE

Region VII, Region VII

2018₱159.3M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-SECONDARY ROADS, TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA)-K0125+996-K0127+007, K0135+488-K0136+000, K0136+280-K0138+000, K0149+000-K0150+000, BOHOL PROVI

Region VII, Region VII

2023₱159.2M
Reported complete (DPWH)
View all 121 projects →

4. Implementation

Contract Amount

₱15,672,893.07

Progress

Reported complete (DPWH)

Start Date

March 16, 2022

Target End

July 1, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholTrinidadHinlayagan Ilaud
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.