Roads20PC0023

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES MALUBIBIT SUR-BALASI-ATOK ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, HIGH VALUE CROPS PROCESSING AND SUPPORT TO TOURISM INDUSTRIES FLORA, APAYAO

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES MALUBIBIT SUR-BALASI-ATOK ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, HIGH VALUE CROPS PROCESSING AND SUPPORT TO TOURISM INDUSTRIES FLORA, APAYAO is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱9,449,470.77. Status: Reported complete (DPWH). Contractor on record: AMAD CONST SERVICES AND SUPPLY. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20PC0023 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-06-05 → 2025-04-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    CY2023 · other

    Confirmed (exact contract ID) · score 1.00

    COA AAR source ↗

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES MALUBIBIT SUR-BALASI-ATOK ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, HIGH VALUE CROPS PROCESSING AND SUPPORT TO TOURISM INDUSTRIES FLORA, APAYAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Cabicungan Flood Control, Sta Filomena, Calanasan, Apayao
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Apayao 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

31 projects · ₱190.4M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, PUDTOL-BAGUTONG ROAD IN SUPPORT FURNITURE HANDRICRAFTS, LOOM WEAVING, BANANA, PINEAPPLE, VEGETABLES AND ROOT CROPS, CORN AND RICE 0+000-0+366

Apayao 2nd DEO, Cordillera Administrative Region

2019₱19.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION (COMPLETION) OF DPWH OFFICE BUILDING, APAYAO SECOND DISTRICT ENGINEERING OFFICE, LUNA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2020₱15.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PUDTOL-BAGUTONG ROAD IN SUPPORT OF FURNITURE HANDICRAFTS, LOOM WEAVING, BANANA, PINEAPPLE, VEGETABLES, AND ROOT CROPS, CORN AND RICE, PUDTOL, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2020₱14.7M
Reported complete (DPWH)
No sat.

PACKAGE I: 1.) CONSTRUCTION OF LUNA NATIONAL HS 2 CL WORKSHOL BUILDING ( 7 X 18) 2.) CONSTRUCTION OF LUNA NATIONAL HS 2 CL WORKSHOL BUILDING ( 7 X 18)

Apayao 2nd DEO, Cordillera Administrative Region

2017₱14.0M
Reported complete (DPWH)
No sat.

PACKAGE III: 1.) CONSTRUCTION OF LOWER MATON E/S, 1 STOREY 2CL, 2.) CONSTRUCTION OF UPPER MATON PS, 1 STOREY 3CL 3.) CONSTRUCTION OF AGA PS, 1 STOREY 2CL 4.) CONSTRUCTION OF AURORA PS, 1 STOREY 2CL

Apayao 2nd DEO, Cordillera Administrative Region

2017₱11.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: SANTA MARIA-MALLIG ROAD IN SUPPORT OF FURNITURE, HANDICRAFT, BANANA, RICE, CORN AND TOURISM INDUSTRIES, FLORA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2020₱9.4M
Reported complete (DPWH)
View all 31 projects →

4. Implementation

Contract Amount

₱9,449,470.77

Progress

Reported complete (DPWH)

Start Date

February 24, 2020

Target End

July 22, 2020

5. Audit

Confirmed (exact contract ID) · 100%

COA observation (CY2023 audit, Par. 16 Technical defects/deficiencies in infrastructure projects). DPWH's action-plan response to this observation names Contract ID 20PC0023, p. 267. Excerpt: "provided for in the 3.20PC0023: For the warning signs contracts; otherwise, not installed and defects under Item"

CY2023 · p.267

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)ApayaoFloraMalubibit Sur
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.