Roads24BG0112

CSSP-BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY DISULAP TO SAN ISIDRO ROAD, DISULAP ROAD SECTION, BARANGAY SAN ISIDRO

CSSP-BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY DISULAP TO SAN ISIDRO ROAD, DISULAP ROAD SECTION, BARANGAY SAN ISIDRO is a DPWH-tracked public work in Isabela 3rd DEO, Region II. Reported contract value: ₱19,783,849.44. Status: Reported complete (DPWH). Contractor on record: AGE CONST. Figures trace to dpwh.

Isabela 3rd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱19,783,849 · AGE CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-06-29 → 2021-06-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP-BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY DISULAP TO SAN ISIDRO ROAD, DISULAP ROAD SECTION, BARANGAY SAN ISIDRO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Disabungan to Catalangan River Flood Control Project, Barangay Disusuan, San Mariano, Isabela
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Isabela 3rd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24BG0112-Convergence and Special Support Program -

₱19,783,849.44 · AGE CONSTRUCTION

Award / contract ref: 24BG0112

Contractor

C

7 projects · ₱57.3M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF BRGY. DISULAP TO DIBULUAN FMR, BRGY. DISULAP, SAN MARIANO, ISABELA

Isabela 3rd DEO, Region II

2024₱9.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT ALIBADABAD NATIONAL HIGH SCHOOL, BRGY. ALIBADABAD, SAN MARIANO

Isabela 3rd DEO, Region II

2024₱7.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN DICAMAY INTEGRATED SCHOOL, BARANGAY DICAMAY, SAN MARIANO, ISABELA, SCHOOL ID NO.: 500086

Isabela 3rd DEO, Region II

2024₱5.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN SAN ISIDRO INTEGRATED SCHOOL, BARANGAY DISULAP, SAN MARIANO, ISABELA, SCHOOL ID NO.: 500501

Isabela 3rd DEO, Region II

2024₱5.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DEL PILAR, SAN MARIANO, ISABELA

Isabela 3rd DEO, Region II

2024₱4.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING OF DEL PILAR INTEGRATED SCHOOL, BRGY. DEL PILAR,SAN MARIANO

Isabela 3rd DEO, Region II

2025₱4.8M
Past target date (DPWH On-Going)
View all 7 projects →

4. Implementation

Contract Amount

₱19,783,849.44

Progress

Reported complete (DPWH)

Start Date

May 23, 2024

Target End

September 16, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaSan MarianoDisulap
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.