CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG SAN ROQUE RIVER CONTROL/ DRAINAGE SYSTEM ALONG CCR LUTAO BRIDGE
CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG SAN ROQUE RIVER CONTROL/DRAINAGE SYSTEM ALONG CCR LUTAO BRIDGE is a DPWH-tracked public work in Camiguin DEO, Region X. Reported contract value: ₱18,624,042.03. Status: Reported complete (DPWH). Contractor on record: SHEEN-SHEEN CONST CORP FORMERLY: SHEEN-SHEEN CONST. Figures trace to dpwh.
Total Contract Cost

