Construction of Slope Protection Structure23DQ0084

Construction of Slope Protection Structure along San Isidro River, West Side, Barangay Iba Silang, Cavite (Phase I)

Construction of Slope Protection Structure along San Isidro River, West Side, Barangay Iba Silang, Cavite (Phase I) is a DPWH-tracked public work in SILANG (CAVITE), CAVITE, Region IV-A. Reported contract value: ₱98,999,358.76. Status: Reported complete (DPWH). Contractor on record: JTC CRUZ CONST CO INC. Figures trace to sumbong.

SILANG (CAVITE), CAVITE, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System in Barangay Binakayan (Covelandia Road and Tirona Highway), Kawit, Cavite
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Cavite 3rd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

154 projects · ₱8.5B total · 5 flags

4. Implementation

Contract Amount

₱98,999,358.76

Progress

Reported complete (DPWH)

Start Date

May 18, 2023

Target End

May 11, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.