Water Provision and Storage19GA0053

CONST./REHAB/IMPROVEMENT OF LEVEL III WATER SUPPLY SYSTEM, TANGALAN, AKLAN

CONST./REHAB/IMPROVEMENT OF LEVEL III WATER SUPPLY SYSTEM, TANGALAN, AKLAN is a DPWH-tracked public work in Aklan DEO, Region VI. Reported contract value: ₱14,397,466.54. Status: Reported complete (DPWH). Contractor on record: G F ROVERO MERCHANDISING. Figures trace to dpwh.

Aklan DEO, Region VI
Region: Region VI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROXI-19-0025623 · ₱217,500 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱14,397,695 · G.F. ROVERO MERCHANDISING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-09-06 → 2025-07-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./REHAB/IMPROVEMENT OF LEVEL III WATER SUPPLY SYSTEM, TANGALAN, AKLAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-19-0025623

₱217,500.00 · FY2019

Released to Division of Island Garden City of Sam (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction/Rehabilitation/

₱14,397,694.54 · G.F. ROVERO MERCHANDISING

Award / contract ref: 19GA0053

Contractor

B

234 projects · ₱3.4B total · 2 flags

4. Implementation

Contract Amount

₱14,397,466.54

Progress

Reported complete (DPWH)

Start Date

June 19, 2019

Target End

January 23, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONST./REHAB/IMPROVEMENT OF LEVEL III WATER SUPPLY SYSTEM, TANGALAN, AKLAN.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/e83b2538-0986-49e0-88a3-2c9e35716edc

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)AklanTangalanTondog
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.