GAA 2025 SSP25BD0115

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY IRAGA, SOLANA, CAGAYAN

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY IRAGA, SOLANA, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱2,875,087.48. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: V R D J CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25BD0115 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-03-22 → 2022-03-22

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY IRAGA, SOLANA, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Malinta Flood Control Structure along Zinundungan River, Barangay Malinta, Lasam, Cagayan
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Cagayan 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

21 projects · ₱57.5M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MATUSALEM ELEMENTARYSCHOOL, BARANGAY MATUSALEM, ROXAS, ISABELA

Isabela 2nd DEO, Region II

2024₱4.9M
Reported complete (DPWH)
No sat.

PROVISION OF TECH VOC WORKSHOP BLDGS./LABORATORIES FOR SENIOR HIGH SCHOOL/CONST'N OF TECNICAL-VOCATIONAL-LIVELIHOOD (TVL) LABORATORIES/WORKSHOP FOR SENIOR HS (2 UNITS-UNIQUE WORKSHOP (UW) @ SAN ANTONIO NAT'L HIGH SCHOOL, DELFIN ALBANO (MAGSAYSAY), ISABE

Isabela 1st DEO, Region II

2016₱4.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ONE - STOREY THREE (3) CLASSROOM SCHOOL BUILDING (1STY3CL) AT STA. CRUZ MULTIGRADE, DELFIN ALBANO (MAGSAYSAY), ISABELA

Isabela 1st DEO, Region II

2017₱3.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) SAN JUAN RUGAO E/S, CITY OF ILAGAN, ISABELA , MARANA 2ND E/S, CITYOF ILAGAN, ISABELA, STA. ISABEL SUR E/S, CITY OF ILAGAN, ISABELA, SALINDINGAN E/S, CITY OF ILAGAN, ISABELA, FUGU E/S, CITY OF ILAGAN, IS

Isabela 1st DEO, Region II

2018₱3.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) I. REINFORCED STEEL GROUND STORAGE TANK: (1) BALASIG E/S, CABAGAN, ISABELA (2) MAGASSI H/S, CABAGAN, ISABELA (3) UNION E/S, CABAGAN, ISABELA (4) PILIG ABAJO E/S, CABAGAN, ISABELA (5) ALINGUIGAN 2ND E/S,

Isabela 1st DEO, Region II

2017₱3.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TECHNICAL-VOCATIONAL-LIVELIHOOD (TVL) UNIQUE WORKSHOP AT DELFIN ALBANO NATIONAL HS, CABAGAN, ISABELA

Isabela 1st DEO, Region II

2017₱3.0M
Reported complete (DPWH)
View all 21 projects →

4. Implementation

Contract Amount

₱2,875,087.48

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

June 26, 2025

Target End

November 5, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanSolanaIraga
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.