Buildings and Facilities22FO0111

CONSTRUCTION OF EVACUATION CENTER, BARANGAY GAMOT, POLANGUI, ALBAY

CONSTRUCTION OF EVACUATION CENTER, BARANGAY GAMOT, POLANGUI, ALBAY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱4,949,983.99. Status: Reported complete (DPWH). Contractor on record: HKP CONST AND SUPPLY. Figures trace to dpwh.

Albay 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FO0111 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-02-16 → 2025-05-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF EVACUATION CENTER, BARANGAY GAMOT, POLANGUI, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project, Barangay San Ramon, Oas, Albay
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Albay 3rd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

116 projects · ₱2.6B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOM 1: ENSURE SAFE AND RELIABLE NATIONAL RAOD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINK/NEW ROADS - MALUBI - CABANGCALAN - DAYHAGAN - TINIGBAN - MATABA ROAD, PACKAGE 1, MASBATE

Masbate 2nd DEO, Region V

2024₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINK/NEW ROADS - ASID TIGBAO - BARA - MALBUG ROAD, PACKAGE 1, MASBATE

Masbate 2nd DEO, Region V

2024₱96.5M
Reported complete (DPWH)
No sat.

LOCALLY-FUNDED PROJECTS - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH MASBATE 2ND DEO BUILDING (PHASE V), MASBATE, CITY OF MASBATE, MASBATE

Masbate 2nd DEO, Region V

2025₱95.0M
Past target date (DPWH On-Going)
No sat.

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MASBATE- CATAINGAN- PLACER RD- K0084+735- K0085+799, K0088+830- K0089+000, K0073+565- K0074+220

Masbate 3rd DEO, Region V

2025₱91.7M
Past target date (DPWH On-Going)
No sat.

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MASBATE- CATAINGAN- PLACER RD- K0057+500- K0059+114

Masbate 3rd DEO, Region V

2025₱76.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG MASBATE - CATAINGAN - PLACER RD (S00005MT) K0006+060 - K0007+141, K00

Masbate 2nd DEO, Region V

2024₱73.3M
Reported complete (100% progress, DPWH status On-Going)
View all 116 projects →

4. Implementation

Contract Amount

₱4,949,983.99

Progress

Reported complete (DPWH)

Start Date

June 20, 2022

Target End

November 16, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayPolanguiGamot
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.