Roads16DF0077No coordinates published by DPWH

LOCAL INFRASTRUCTURE PROGRAM - ROADS AND BRIDGES, LOCAL ROADS, CONCRETING/REHABILITATION OF REMULLA

LOCAL INFRASTRUCTURE PROGRAM - ROADS AND BRIDGES, LOCAL ROADS, CONCRETING/REHABILITATION OF REMULLA is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱18,478,629.95. Status: Reported complete (DPWH). Contractor on record: BAQPRINCE CONST AND TRADING CORP. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-16-0027749 · ₱8,540,498 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16DF0077 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM - ROADS AND BRIDGES, LOCAL ROADS, CONCRETING/REHABILITATION OF REMULLA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Canas River, Brgys. Tapia Section, Pinagtipunan, San Juan II Section and Tejero Section, Gen. Trias, Cavite 6th LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-16-0027749

₱8,540,498.00 · FY2016

Released to Division of Sorsogon (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

185 projects · ₱6.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION (COMPLETION) OF ROSARIO GYMNASIUM, ROSARIO, CAVITE

Cavite 1st DEO, Region IV-A

2024₱147.1M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, GENERAL TRIAS, CAVITE, PHASE 3

Region IV-A, Region IV-A

2023₱99.6M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF REVETMENT ALONG IMUS RIVER,BRGY.BINAKAYAN, PHASE II

Cavite 1st DEO, Region IV-A

2023₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSMALABON GRANDE- SAN JUAN - MULAWIN DIVERSION ROAD, LAVANYA SECTION, BRGY. SAN JUAN II, GEN. TRIAS CITY, CAV

Cavite 1st DEO, Region IV-A

2023₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSMALABON GRANDE- SAN JUAN - MULAWIN DIVERSION ROAD, MULAWIN SECTION, SEGMENT 3, TANZA, CAVITE

Cavite 1st DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSMALABON GRANDE- SAN JUAN - MULAWIN DIVERSION ROAD, MULAWIN SECTION, SEGMENT 4, TANZA, CAVITE

Cavite 1st DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
View all 185 projects →

4. Implementation

Contract Amount

₱18,478,629.95

Progress

Reported complete (DPWH)

Start Date

April 4, 2016

Target End

July 2, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Cavite
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.