Roads23IM0005

PREVENTIVE MAINTENANCE - TERTIARY ROADS - LEYTE-SAMAR RD (VIA GUINTIGUI-AN) K0899+555 -K0899+992

PREVENTIVE MAINTENANCE - TERTIARY ROADS - LEYTE-SAMAR RD (VIA GUINTIGUI-AN) K0899+555 -K0899+992 is a DPWH-tracked public work in Tacloban City DEO, Region VIII. Reported contract value: ₱32,828,180.03. Status: Reported complete (DPWH). Contractor on record: R8 ASPHALT PLANT AND CONST INC FORMERLY:R8 ASPHALT PLANT AND CONST. Figures trace to dpwh.

Tacloban City DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱35,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23IM0005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-05-09 → 2025-10-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    CY2023 · other

    Confirmed (exact contract ID) · score 1.00

    COA AAR source ↗

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱75,121,693 per km= 3.4x the Region VIII median (n=297)

Contract cost ₱32,828,180 ÷ 0.437 km read from the DPWH title (“K0899+555 -K0899+992”; K-post / station range length). National percentile: 93. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PREVENTIVE MAINTENANCE - TERTIARY ROADS - LEYTE-SAMAR RD (VIA GUINTIGUI-AN) K0899+555 -K0899+992

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure along Burayan River, Brgy. 81, Marasbaras, Tacloban City
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Tacloban City DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

76 projects · ₱1.2B total · 0 flags

4. Implementation

Contract Amount

₱32,828,180.03

Progress

Reported complete (DPWH)

Start Date

July 7, 2023

Target End

September 30, 2023

5. Audit

Confirmed (exact contract ID) · 100%

COA observation (CY2023 audit, Par. 18 Delayed/Non-submission of Contracts, Purchase Orders (POs) and supporting documents). DPWH's action-plan response to this observation names Contract ID 23IM0005, p. 336. Excerpt: "23GIM0016, 23IM0005-Re-advertise, 23IM0007-Re-advertise, 23IM0010- Re-advertise, 23IM0021-Re-advertise, 23IM0023-Re-advertise, 23IM0025- Re-advertise, 23IM0027-Re-advertise,"

CY2023 · p.336

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)City of TaclobanBarangay 105
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.