Roads19EB0134

CONCRETING OF BRGY. MONTECLARO FMR, SAN JOSE, OCCIDENTAL MINDORO

CONCRETING OF BRGY. MONTECLARO FMR, SAN JOSE, OCCIDENTAL MINDORO is a DPWH-tracked public work in Mindoro Occidental DEO, Region IV-B. Reported contract value: ₱9,709,664.37. Status: Reported complete (DPWH). Contractor on record: SIXTEEN ENT-CALAPAN BRANCH. Figures trace to dpwh.

Mindoro Occidental DEO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-A-19-0000617 · ₱1,331,464,000 · release to the district office, not itemized per project

    Possible match · score 0.76

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,709,664 · SIXTEEN ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-12-18 → 2023-12-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. MONTECLARO FMR,  SAN JOSE, OCCIDENTAL MINDORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-A-19-0000617

₱1,331,464,000.00 · FY2019

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

19EB0134-R1

₱9,709,664.37 · SIXTEEN ENTERPRISES

Award / contract ref: 19EB0134-R1

Contractor

A

76 projects · ₱2.7B total · 0 flags

Other projects by this contractor

No sat.

ROAD WIDENING OF CALAPAN SOUTH ROAD, KO064+(-780)-KO064+(-320); KO064+(-200)-KO064+328; KO064+456-KO064+638; KO064+822-KO066+680; KO066+868-KO069+053; KO069+356-KO071+160; KO071+273-KO072+128; KO072+241-KO072+445; KO072+628-KO073+687; KO073+794-KO074+640,

Region IV-B, Region IV-B

2018₱204.4M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM- CONST. OF MISSING LINKS/NEW ROADS- BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), ORIENTAL MINDORO

Region IV-B, Region IV-B

2023₱135.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS/NEW ROADS BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), STA. 0+000-STA. 0+044.60; STA. 0+105.40-STA. 1+302; STA. 0+066.60-STA. 0+105.40, ORIENTAL MINDORO

Region IV-B, Region IV-B

2021₱96.5M
Reported complete (DPWH)
No sat.

ROAD WIDENING OF SECONDARY ROADS, CSR (K0094+160 - K0094+191, K0094+200 - K0096+968), BANSUD, ORIENTAL MINDORO

Southern Mindoro DEO, Region IV-B

2018₱96.4M
Reported complete (DPWH)
No sat.

WIDENING OF CALAPAN SOUTH ROAD, SECT. 1-KO085+938-KO086+336; SECT. 2-KO086+657-KO086+846; SECT. 3-KO086+887-KO087+364; SECT. 4-KO087+861-KO088+690; SECT. 5-KO089+171-KO089+764; SECT. 6-KO090+287-KO090+390; SECT. 7-KO090+803-KO091+127; SECT. 8-KO091+578-KO

Southern Mindoro DEO, Region IV-B

2017₱93.6M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG CALAPAN SOUTH ROAD, K0103+632 - K0104+224, K0124+976 - K0126+000, K0127+000 - K0127+400, K0127+560 - K0130+000), BONGABONG, ORIENTAL MINDORO

Southern Mindoro DEO, Region IV-B

2018₱92.4M
Reported complete (DPWH)
View all 76 projects →

4. Implementation

Contract Amount

₱9,709,664.37

Progress

Reported complete (DPWH)

Start Date

October 17, 2019

Target End

March 8, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOccidental MindoroSan JoseMonte Claro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.