Buildings and Facilities22LB0421

CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 12 JULLIVILLE SUBDIVISION, BARANGAY TIGATTO, DAVAO CITY

CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 12 JULLIVILLE SUBDIVISION, BARANGAY TIGATTO, DAVAO CITY is a DPWH-tracked public work in Davao City DEO, Region XI. Reported contract value: ₱4,900,000.00. Status: Reported complete (DPWH). Contractor on record: BOJUS SUN BUILDERS. Figures trace to dpwh.

Davao City DEO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱7,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22LB0421 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-09-02 → 2026-01-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 12 JULLIVILLE SUBDIVISION, BARANGAY TIGATTO, DAVAO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱7,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure at Purok 16, Block 2, Barangay Catalunan Peque±o, Davao City
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Davao City DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

23 projects · ₱303.5M total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1663+840-K1663+890, MARILOG DISTRICT, DAVAO CITY

Davao City 2nd DEO, Region XI

2023₱49.0M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1624+071-K1624+129, MARILOG DISTRICT, DAVAO CITY

Davao City 2nd DEO, Region XI

2022₱29.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE REVETMENT ALONG LIPADAS RIVER, ALAMBRE-LOBOGAN SECTION, LOBOGAN, DAVAO CITY

Davao City 2nd DEO, Region XI

2020₱29.4M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1641+100-K1641+179, MARILOG DISTRICT, DAVAO CITY

Davao City 2nd DEO, Region XI

2021₱25.5M
Reported complete (DPWH)
No sat.

CONST. OF THE FF. PROJECTS AT BRGY. CAMANSI, TORIL DIST., D.C., LGSF-BPD, ELCAC (1) CONST. OF WATER SUPPLY SYSTEM AT PUROK 3, BRGY. CAMANSI, D.C. (2) CONST. OF WATER SUPPLY SYSTEM AT PUROK 1, BRGY. CAMANSI, D.C. (3) CONST. OF WATER SUPPLY SYSTEM AT PUROK

Davao City 2nd DEO, Region XI

2021₱19.9M
Reported complete (DPWH)
No sat.

CONST. OF THE FOLLOWING PROJECTS AT BRGY. ALAMBRE, TORIL DIST., D.C., LGSF-BPD, ELCAC (1) CONST. OF WATER SUPPLY SYSTEM AT PUROK 5, BRGY. ALAMBRE, D.C. (2) CONST. OF ROAD AT BRGY. ALAMBRE, D.C. (3) INST. OF STREET LIGHTINGS AT PUROK 1 TO PUROK 7, BRGY. AL

Davao City 2nd DEO, Region XI

2021₱19.8M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱4,900,000.00

Progress

Reported complete (DPWH)

Start Date

October 3, 2022

Target End

May 25, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)City of DavaoTigatto
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.