Buildings and Facilities16HK0068

CONSTRUCTION OF TWO STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT PANIABONAN HIGH SCHOOL, MABINAY

CONSTRUCTION OF TWO STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT PANIABONAN HIGH SCHOOL, MABINAY is a DPWH-tracked public work in Negros Oriental 2nd DEO, Negros Island Region. Reported contract value: ₱11,341,498.88. Status: Reported complete (DPWH). Contractor on record: UY CONDEV CORP FORMERLY:UY CONST. Figures trace to dpwh.

Negros Oriental 2nd DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-16-0015251 · · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱11,341,499 · UY CONDEV

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-03-14 → 2015-03-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TWO STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT PANIABONAN HIGH SCHOOL, MABINAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Improvement of Flood Control and Drainage Structure along Binalbagan - Isabela Road, K0062+083 - K0073+000 B / S, Negros Occidental 5th LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-16-0015251

₱-134,095.00 · FY2016

Released to Regional Office - X (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

School Building

₱11,341,498.88 · UY CONDEV

Award / contract ref: 16HK0068

Contractor

C

178 projects · ₱8.2B total · 0 flags

Other projects by this contractor

No sat.

IMPROVEMENT/ WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH ROAD INCLUDING RROW (S00127NR), K0046+(-910) - K0048+533; K0059+781 - K0060+307.50; K0065+448 - K0071+696.60 , HINIGARAN AND BINALBAGAN, NEGROS OCCIDENTAL

Negros Occidental 2nd DEO, Negros Island Region

2017₱236.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD - BAYAWAN - KABANKALAN ROAD, INCL. RROW, NEGROS ORIENTAL, BAYAWAN, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2017₱215.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD - HIMAMAYLAN CITY - NEGROS ORIENTAL BOUNDARY - TAYASAN ROAD , NEGROS OCCIDENTAL

Region VI, Region VI

2018₱172.3M
Reported complete (DPWH)
No sat.

CSSP, SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, REHAB./RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DUMAGUETE NORTH RD (DUMAGUETE-JCT BAIS-KABANKALAN)-K0006+100-K0006+1017, K0006+1078-K0009+330, K0009+460-K0010+395,

Region VII, Region VII

2024₱154.8M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF REVETMENT STRUCTURE ALONG OCOY RIVER, BRGY. CALABNUGAN, SIBULAN, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2025₱146.3M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/ WIDENING OF KABANKALAN - BAIS ROAD (S00240NR), K0093+218 - K0098+483, KABANKALAN, NEGROS OCCIDENTAL

Negros Occidental 3rd DEO, Negros Island Region

2017₱140.9M
Reported complete (DPWH)
View all 178 projects →

4. Implementation

Contract Amount

₱11,341,498.88

Progress

Reported complete (DPWH)

Start Date

September 22, 2016

Target End

February 18, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalMabinayPaniabonan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.