Buildings and Facilities20AI0149

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DON ANTONIO VILLAGE, ROSALES, PANGASINAN

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DON ANTONIO VILLAGE, ROSALES, PANGASINAN is a DPWH-tracked public work in Pangasinan 3rd DEO, Region I. Reported contract value: ₱979,412.60. Status: Reported complete (DPWH). Contractor on record: AMP 723 CONST CORP FORMERLY: A M P CONST. Figures trace to dpwh.

Pangasinan 3rd DEO, Region I
Region: Region I

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱15,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱979,413 · AMP CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-23 → 2025-11-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DON ANTONIO VILLAGE, ROSALES, PANGASINAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Agno River, Brgy. Carmay-Rizal, Rosales, Pangasinan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Pangasinan 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Multi-Purpose Building, Brgy. Don

₱979,412.60 · AMP CONSTRUCTION

Award / contract ref: 20AI0149

Contractor

A

519 projects · ₱11.9B total · 7 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - EVACUATION CENTERS / QUARANTINE FACILITIES / PUBLIC HEALTH FACILITIES - CONSTRUCTION OF THE EVACUATION AND CONVENTION CENTER, SAN LEONARDO, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2024₱192.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, V. LUNA HOSPITAL COMPOUND, QUEZON CITY

Quezon City 2nd DEO, National Capital Region

2025₱145.5M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BENAY - BARANGAY PALABOT

Nueva Vizcaya 2nd DEO, Region II

2025₱142.6M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, BARANGAY SAPANG. JAEN, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱120.0M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGUMBAYAN FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BARANGAY BAGUMBAYAN,

Nueva Vizcaya 2nd DEO, Region II

2025₱102.1M
Past target date (DPWH On-Going)

Improvement of River Channel along Talavera River (Brgy. Cabubulaonan), Talavera, Nueva Ecija

TALAVERA (NUEVA ECIJA), NUEVA ECIJA, Region III

2023₱99.0M
Reported complete (DPWH)
View all 519 projects →

4. Implementation

Contract Amount

₱979,412.60

Progress

Reported complete (DPWH)

Start Date

October 7, 2020

Target End

December 5, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanRosalesCarmay East
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.