Buildings and Facilities15DI0209No coordinates published by DPWH

LIP - IMPROVEMENT OF COVERED COURT/ STAGE, TAGAPO, STA. ROSA CITY, LAGUNA 1ST L.D.

LIP - IMPROVEMENT OF COVERED COURT/ STAGE, TAGAPO, STA. ROSA CITY, LAGUNA 1ST L.D. is a DPWH-tracked public work in Laguna 2nd DEO, Region IV-A. Reported contract value: ₱1,921,500.00. Status: Reported complete (DPWH). Contractor on record: DMLC BUILDERS. Figures trace to dpwh.

Laguna 2nd DEO, Region IV-A

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-16-0032347 · ₱127,844 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15DI0209 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-17 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LIP - IMPROVEMENT OF COVERED COURT/ STAGE, TAGAPO, STA. ROSA CITY, LAGUNA 1ST L.D.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Flood Control Construction of Revetment at San Isidro River, Brgy. San Antonio and Brgy. San Vicente, San Pedro City, Laguna
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-16-0032347

₱127,844.00 · FY2016

Released to Heracleo Casco Memorial National High School Re (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

107 projects · ₱5.3B total · 1 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BARANGAY CALAMPINAY COASTAL ROAD (COBCOBAN SECTION), SIPOCOT, CAMARINES SUR

Camarines Sur 1st DEO, Region V

2025₱141.2M
Past target date (DPWH On-Going)

Construction of Flood Control Structure along Estero de Maypajo, Package I, Manila

CITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital Region

2024₱113.1M
Reported complete (DPWH)

CLUSTER 9: REPAIR/REHABILITATION OF FLOOD CONTROL/DRAINAGE STRUCTURES,RAGAY, CAMARINES SUR

Camarines Sur 1st DEO, Region V

2024₱112.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO NONOK, BARANGAY MONTAÑEZA - SITIO WALO

Cebu 7th DEO, Region VII

2025₱99.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONST OF REVETMENT ALONG RIO GRANDE RIVER RIVER, BARANGAY SANTIAGO, GEN. TRIAS, CAVITE

Cavite 1st DEO, Region IV-A

2024₱99.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF REVETMENT ALONG YLANG-YLANG, SAN FRANCISCO, GEN. TRIAS, CAVITE (PHASE III)

Cavite 1st DEO, Region IV-A

2024₱99.0M
Past target date (DPWH On-Going)
View all 107 projects →

4. Implementation

Contract Amount

₱1,921,500.00

Progress

Reported complete (DPWH)

Start Date

January 28, 2016

Target End

March 27, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)LagunaCity of Santa Rosa
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.