Roads25CJ0237

CONSTRUCTION OF SAN MANUEL - VILLASIS BYPASS ROAD (SEGMENT 2), SAN MANUEL, TARLAC

CONSTRUCTION OF SAN MANUEL - VILLASIS BYPASS ROAD (SEGMENT 2), SAN MANUEL, TARLAC is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱95,101,268.06. Status: Past target date (DPWH On-Going). Contractor on record: T2B3 BUILDERS AND SUPPLIES CORP. Figures trace to dpwh.

Tarlac DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱75,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25CJ0237 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    20% reported · imagery 2024-12-12 → 2025-11-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SAN MANUEL - VILLASIS BYPASS ROAD (SEGMENT 2), SAN MANUEL, TARLAC

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱75,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Pait Manok River, San Manuel, Tarlac (Segment 26)
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Tarlac DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

4. Implementation

Contract Amount

₱95,101,268.06

Progress

Past target date (DPWH On-Going)

Start Date

June 20, 2025

Target End

February 27, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)TarlacSan ManuelLanat
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.