Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22DC0052 and 24DC0120 have near-identical descriptions about 854 m apart (funding years 2022, 2024; ₱77.20M, ₱96.50M). Worth checking whether they cover the same works. The second project may simply be a continuation or next phase of the first, as indicated by 'Phase 6'.

Public record entityConstruction of Flood Mitigation Structure along San Juan River, Tanauan - Sto. Tomas, Batangas
LocationCITY OF SANTO TOMAS (BATANGAS), BATANGAS, Region IV-AContract 22DC0052
Amount₱77,199,364.24 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along San Juan River, Tanauan - Sto. Tomas, Batangas22DC0052Flood control100%January 18, 2023November 14, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 23, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22DC0052",
  "coordinates": {
    "lat": 14.084889,
    "lon": 121.15502
  },
  "municipality": "CITY OF SANTO TOMAS (BATANGAS)",
  "distanceMeters": 854.1547511752034,
  "titleSimilarity": 0.9743589743589743
}

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasCity of Sto. Tomas
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Ewiniar 2024
Hazard exposure
Active fault14.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.