Hon. Adrian E. Salceda Representative, Albay (Third District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Albay (Third District) Dear Representative Adrian E. Salceda: Good day. I live in Albay (Third District), and I would like to ask about some DPWH lines for the Albay 3rd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Urban Drainage System, Guinobatan, Albay, Section 1: Sta. 0 + 000 - Sta. 0+374, Section 2: 0 + 000 - Sta. 0+167, Section 3: 0 + 000 - Sta. 0+398, Section 4: 0 + 000 - Sta. 0+810 (Albay 3rd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 344; no matching NEP line for this office] 2. Rehabilitation of Flood Control Dike at Barangay Santa Cruz, Libon, Albay, Right Side Facing Downstream, Libon, Albay, - Sta. 0 + 000 - Sta. 0 + 200 (Albay 3rd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 344; no matching NEP line for this office] 3. Oas Poblacion Rd - K0496+(-290) - K0498+333 (Albay 3rd DEO): not in the NEP; ₱45,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 137; no matching NEP line for this office] 4. Polangui Poblacion Rd - K0491 + (-735) - K0491 + (-135) (Paving of Shoulders) (Albay 3rd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 245; no matching NEP line for this office] 5. Construction of Flood Control Dike Structure along Agos River, Barangay Agos and Sta Cruz, Polangui and Libon, Albay, Right Side Facing Downstream, Sta. 0 + 000 - Sta. 0 + 120.00 (Albay 3rd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 343; no matching NEP line for this office] 6. Construction of Road, Barangay Agol-Barangay Basicao Interior-Barangay Malapay- Barangay Nablangbulod Road including Drainage Facilities, Pio Duran, Albay. STA. 0+600-STA.1+300 (Albay 3rd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 551; no matching NEP line for this office] 7. Albay West Coast Rd - K0545 + 568 - K0546 + 677 (Albay 3rd DEO): not in the NEP; ₱18,187,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 154; no matching NEP line for this office] 8. Rehabilitation of Flood Control Structure at Centro Oriental, Polangui, Albay, Right Side, Sta. 0 + 000 - Sta. 0 + 045, Sta. 0 + 560 - Sta. 620 (Albay 3rd DEO): not in the NEP; ₱15,309,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 344; no matching NEP line for this office] 9. Construction/Rehabilitation of Gabon Flood Control Dike, Right Side, Sta. 0 + 167 - Sta. 0 + 192, Sta 0 + 823 - Sta. 0 + 852, Polangui, Albay (Albay 3rd DEO): not in the NEP; ₱10,637,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 343; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Albay 3rd DEO: 1,034 contracts (2016–2025) in public DPWH records; 639 recorded as completed and 382 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Pinanganuran River Flood Control Structure, Barangay San Jose, Libon, Albay (22FO0056): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/f349f9d6-bf34-44b3-a639-29a6c31caa59 - Construction of Pinanganuran River Flood Control Structure, Barangay Villa Petrona, Libon, Albay (22FO0056): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/495a6daf-76dd-4a49-bd5f-85800ffc2ba1 - Rehabilitation of Bacolod Flood Control Structure (Left Side Facing Downstream of Bacolod Bridge) Phase II in Libon, Albay (22FO0057): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/0441fbc3-651f-4087-a26f-ea5789a1683f - Construction of Catburawan River Flood Control Structure, Barangay Catburawan, Ligao City, Albay (22FO0055): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/394e4288-4e07-47c2-a7a2-b30f7599332c - Rehabilitation of Marocmoc Bridge Flood Control Structure (Right Side Facing Upstream and Left Side Facing Downstream of Marocmoc Bridge) in Libon, Albay (22FO0057): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/d27a0ce1-ce33-433b-a595-b404a51b7048 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/albay-3rd
Write your representative · FY2027 budget
Albay (Third District)
Representative: Adrian E. Salceda · bills and roles · official House profile
Served by: Albay 3rd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
9 of 12 lines selected.
Albay 3rd DEO
- House version (HB 10858)
- ₱591.3M
- 19 lines
- President’s NEP
- ₱330.7M
- 13 lines
- Added by the House
- 9
- ₱269.1M
- Changed / removed
- 0 / 3
- 10 lines unchanged
Lines that differ from the NEP (9)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Urban Drainage System, Guinobatan, Albay, Section 1: Sta. 0 + 000 - Sta. 0+374, Section 2: 0 + 000 - Sta. 0+167, Section 3: 0 + 000 - Sta. 0+398, Section 4: 0 + 000 - Sta. 0+810 | Added by the House | — | ₱50,000,000 | HB p. 344 |
| Rehabilitation of Flood Control Dike at Barangay Santa Cruz, Libon, Albay, Right Side Facing Downstream, Libon, Albay, - Sta. 0 + 000 - Sta. 0 + 200 | Added by the House | — | ₱50,000,000 | HB p. 344 |
| Oas Poblacion Rd - K0496+(-290) - K0498+333 | Added by the House | — | ₱45,000,000 | HB p. 137 |
| Polangui Poblacion Rd - K0491 + (-735) - K0491 + (-135) (Paving of Shoulders) | Added by the House | — | ₱30,000,000 | HB p. 245 |
| Construction of Flood Control Dike Structure along Agos River, Barangay Agos and Sta Cruz, Polangui and Libon, Albay, Right Side Facing Downstream, Sta. 0 + 000 - Sta. 0 + 120.00 | Added by the House | — | ₱30,000,000 | HB p. 343 |
| Construction of Road, Barangay Agol-Barangay Basicao Interior-Barangay Malapay- Barangay Nablangbulod Road including Drainage Facilities, Pio Duran, Albay. STA. 0+600-STA.1+300 | Added by the House | — | ₱20,000,000 | HB p. 551 |
| Albay West Coast Rd - K0545 + 568 - K0546 + 677 | Added by the House | — | ₱18,187,000 | HB p. 154 |
| Rehabilitation of Flood Control Structure at Centro Oriental, Polangui, Albay, Right Side, Sta. 0 + 000 - Sta. 0 + 045, Sta. 0 + 560 - Sta. 620 | Added by the House | — | ₱15,309,000 | HB p. 344 |
| Construction/Rehabilitation of Gabon Flood Control Dike, Right Side, Sta. 0 + 167 - Sta. 0 + 192, Sta 0 + 823 - Sta. 0 + 852, Polangui, Albay | Added by the House | — | ₱10,637,000 | HB p. 343 |
NEP lines with no match in the House version (3)
- Ligao-Pio Duran Rd - K0513 + 900 - K0513 + 997 · ₱3,263,000 · NEP PDF p. 271
- Ligao-Pio Duran Rd - K0523 + 927 - K0524 + 002 · ₱2,758,000 · NEP PDF p. 271
- Ligao-Pio Duran Rd - K0517 + 025 - K0517 + 029, K0517 + 073 - K0517 + 085, K0518 + 011 - K0518 + 070 · ₱2,524,000 · NEP PDF p. 271
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,034 contracts from 2016 to 2025 in public DPWH records (₱22.83B): 639 recorded as completed, 382 as ongoing. 927 have a satellite image check on file. Browse them.
6 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Pinanganuran River Flood Control Structure, Barangay San Jose, Libon, Albay 22FO0056 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Pinanganuran River Flood Control Structure, Barangay Villa Petrona, Libon, Albay 22FO0056 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Rehabilitation of Bacolod Flood Control Structure (Left Side Facing Downstream of Bacolod Bridge) Phase II in Libon, Albay 22FO0057 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Catburawan River Flood Control Structure, Barangay Catburawan, Ligao City, Albay 22FO0055 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Rehabilitation of Marocmoc Bridge Flood Control Structure (Right Side Facing Upstream and Left Side Facing Downstream of Marocmoc Bridge) in Libon, Albay 22FO0057 · Completed · ₱44.1MPattern Consistent with Contract Splitting
- Rehabilitation of Pangarian River Flood Mitigation Structure with Access Road, Barangay La Medalla, Pio Duran, Albay 22FO0055 · Completed · ₱44.0MPattern Consistent with Contract Splitting
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.