← All districts

Write your representative · FY2027 budget

Albay (Third District)

Representative: Adrian E. Salceda · bills and roles · official House profile

Served by: Albay 3rd DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

9 of 12 lines selected.

Hon. Adrian E. Salceda
Representative, Albay (Third District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Albay (Third District)

Dear Representative Adrian E. Salceda:

Good day. I live in Albay (Third District), and I would like to ask about some DPWH lines for the Albay 3rd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Urban Drainage System, Guinobatan, Albay, Section 1: Sta. 0 + 000 - Sta. 0+374, Section 2: 0 + 000 - Sta. 0+167, Section 3: 0 + 000 - Sta. 0+398, Section 4: 0 + 000 - Sta. 0+810 (Albay 3rd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 344; no matching NEP line for this office]
2. Rehabilitation of Flood Control Dike at Barangay Santa Cruz, Libon, Albay, Right Side Facing Downstream, Libon, Albay, - Sta. 0 + 000 - Sta. 0 + 200 (Albay 3rd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 344; no matching NEP line for this office]
3. Oas Poblacion Rd - K0496+(-290) - K0498+333 (Albay 3rd DEO): not in the NEP; ₱45,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 137; no matching NEP line for this office]
4. Polangui Poblacion Rd - K0491 + (-735) - K0491 + (-135) (Paving of Shoulders) (Albay 3rd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 245; no matching NEP line for this office]
5. Construction of Flood Control Dike Structure along Agos River, Barangay Agos and Sta Cruz, Polangui and Libon, Albay, Right Side Facing Downstream, Sta. 0 + 000 - Sta. 0 + 120.00 (Albay 3rd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 343; no matching NEP line for this office]
6. Construction of Road, Barangay Agol-Barangay Basicao Interior-Barangay Malapay- Barangay Nablangbulod Road including Drainage Facilities, Pio Duran, Albay. STA. 0+600-STA.1+300 (Albay 3rd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 551; no matching NEP line for this office]
7. Albay West Coast Rd - K0545 + 568 - K0546 + 677 (Albay 3rd DEO): not in the NEP; ₱18,187,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 154; no matching NEP line for this office]
8. Rehabilitation of Flood Control Structure at Centro Oriental, Polangui, Albay, Right Side, Sta. 0 + 000 - Sta. 0 + 045, Sta. 0 + 560 - Sta. 620 (Albay 3rd DEO): not in the NEP; ₱15,309,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 344; no matching NEP line for this office]
9. Construction/Rehabilitation of Gabon Flood Control Dike, Right Side, Sta. 0 + 167 - Sta. 0 + 192, Sta 0 + 823 - Sta. 0 + 852, Polangui, Albay (Albay 3rd DEO): not in the NEP; ₱10,637,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 343; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Albay 3rd DEO: 1,034 contracts (2016–2025) in public DPWH records; 639 recorded as completed and 382 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Pinanganuran River Flood Control Structure, Barangay San Jose, Libon, Albay (22FO0056): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/f349f9d6-bf34-44b3-a639-29a6c31caa59
- Construction of Pinanganuran River Flood Control Structure, Barangay Villa Petrona, Libon, Albay (22FO0056): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/495a6daf-76dd-4a49-bd5f-85800ffc2ba1
- Rehabilitation of Bacolod Flood Control Structure (Left Side Facing Downstream of Bacolod Bridge) Phase II in Libon, Albay (22FO0057): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/0441fbc3-651f-4087-a26f-ea5789a1683f
- Construction of Catburawan River Flood Control Structure, Barangay Catburawan, Ligao City, Albay (22FO0055): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/394e4288-4e07-47c2-a7a2-b30f7599332c
- Rehabilitation of Marocmoc Bridge Flood Control Structure (Right Side Facing Upstream and Left Side Facing Downstream of Marocmoc Bridge) in Libon, Albay (22FO0057): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/d27a0ce1-ce33-433b-a595-b404a51b7048

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/albay-3rd

Albay 3rd DEO

House version (HB 10858)
₱591.3M
19 lines
President’s NEP
₱330.7M
13 lines
Added by the House
9
₱269.1M
Changed / removed
0 / 3
10 lines unchanged
Lines that differ from the NEP (9)
LineChangeNEPHouseSources
Construction of Urban Drainage System, Guinobatan, Albay, Section 1: Sta. 0 + 000 - Sta. 0+374, Section 2: 0 + 000 - Sta. 0+167, Section 3: 0 + 000 - Sta. 0+398, Section 4: 0 + 000 - Sta. 0+810Added by the House—₱50,000,000HB p. 344
Rehabilitation of Flood Control Dike at Barangay Santa Cruz, Libon, Albay, Right Side Facing Downstream, Libon, Albay, - Sta. 0 + 000 - Sta. 0 + 200Added by the House—₱50,000,000HB p. 344
Oas Poblacion Rd - K0496+(-290) - K0498+333Added by the House—₱45,000,000HB p. 137
Polangui Poblacion Rd - K0491 + (-735) - K0491 + (-135) (Paving of Shoulders)Added by the House—₱30,000,000HB p. 245
Construction of Flood Control Dike Structure along Agos River, Barangay Agos and Sta Cruz, Polangui and Libon, Albay, Right Side Facing Downstream, Sta. 0 + 000 - Sta. 0 + 120.00Added by the House—₱30,000,000HB p. 343
Construction of Road, Barangay Agol-Barangay Basicao Interior-Barangay Malapay- Barangay Nablangbulod Road including Drainage Facilities, Pio Duran, Albay. STA. 0+600-STA.1+300Added by the House—₱20,000,000HB p. 551
Albay West Coast Rd - K0545 + 568 - K0546 + 677Added by the House—₱18,187,000HB p. 154
Rehabilitation of Flood Control Structure at Centro Oriental, Polangui, Albay, Right Side, Sta. 0 + 000 - Sta. 0 + 045, Sta. 0 + 560 - Sta. 620Added by the House—₱15,309,000HB p. 344
Construction/Rehabilitation of Gabon Flood Control Dike, Right Side, Sta. 0 + 167 - Sta. 0 + 192, Sta 0 + 823 - Sta. 0 + 852, Polangui, AlbayAdded by the House—₱10,637,000HB p. 343
NEP lines with no match in the House version (3)
  • Ligao-Pio Duran Rd - K0513 + 900 - K0513 + 997 · ₱3,263,000 · NEP PDF p. 271
  • Ligao-Pio Duran Rd - K0523 + 927 - K0524 + 002 · ₱2,758,000 · NEP PDF p. 271
  • Ligao-Pio Duran Rd - K0517 + 025 - K0517 + 029, K0517 + 073 - K0517 + 085, K0518 + 011 - K0518 + 070 · ₱2,524,000 · NEP PDF p. 271

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

1,034 contracts from 2016 to 2025 in public DPWH records (₱22.83B): 639 recorded as completed, 382 as ongoing. 927 have a satellite image check on file. Browse them.

6 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.