Hon. Antonino III B. Roman Representative, Bataan (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Bataan (First District) Dear Representative Antonino III B. Roman: Good day. I live in Bataan (First District), and I would like to ask about some DPWH lines for the Bataan 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Road connecting Curing Avanue to Antonino P. Roman Memorial Hospital, Barangay Mulawin to Barangay Dona, Orani, Bataan (Bataan 1st DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 497; no matching NEP line for this office] 2. Rehabilitation of Multi-Purpose Building, Barangay Calaylayan, Abucay, Bataan (14.769242, 120.537335) (Bataan 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 717; no matching NEP line for this office] 3. Construction of Multi-Purpose Building, Barangay Saba, Hermosa, Bataan, 14.85607828, 120.51675173 (Bataan 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 717; no matching NEP line for this office] 4. Construction of Multi-Purpose Building, Barangay Bayan, Orani, Bataan, 14.798033, 120.533475 (Bataan 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 717; no matching NEP line for this office] 5. Construction (Completion) of Multi-Purpose Building, Sitio Suha, Barangay Mabuco, Hermosa, Bataan, 14.821293, 120.514296 (Bataan 1st DEO): not in the NEP; ₱3,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 717; no matching NEP line for this office] 6. Construction (Completion) of Multi-Purpose Building, Sitio Bakawan, Barangay Wawa, Abucay, Bataan, 14.721254, 120.547477 (Bataan 1st DEO): not in the NEP; ₱3,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 717; no matching NEP line for this office] 7. Rehabilitation/Completion of Multi-Purpose Building, Barangay East Daan Bago, Samal, Bataan (14.767941, 120.543602) (Bataan 1st DEO): not in the NEP; ₱3,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 717; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Bataan 1st DEO: 862 contracts (2016–2025) in public DPWH records; 748 recorded as completed and 95 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Project along Colo River, Sacrifice Valley Section, Phase ERD-I, Hermosa, Bataan (22CA0026): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/aebbadc8-4e3f-427e-9572-19cf390b4420 - Construction of Damaged Flood Control Structure Barangay Pulo, Hermosa, Bataan (23CA0012): Awards Very Close to the Budget Ceiling; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/f6f3aea5-a37f-48c6-8be4-aa1b1c0555ae - Construction of Flood Control Structure along Barangay Pulo, Hermosa, Bataan (24CA0023): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/836e1f16-340c-4892-a43a-82c4d75fe098 - Construction of Flood Control Structure along Tuyo River (Phase II-DM), Abucay, Bataan (24CA0017): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/be9633f1-1754-47f4-af3d-91733f3041d3 - Construction of Flood Control Project along Pulo-Almacen River, Phase IV-DMC, Hermosa, Bataan (24CA0048): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/7f3146af-43a7-4e02-9d50-88f976da92f1 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/bataan-1st
Write your representative · FY2027 budget
Bataan (First District)
Representative: Antonino III B. Roman · bills and roles · official House profile
Served by: Bataan 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
7 of 7 lines selected.
Bataan 1st DEO
- House version (HB 10858)
- ₱469.8M
- 69 lines
- President’s NEP
- ₱400.8M
- 62 lines
- Added by the House
- 7
- ₱69.0M
- Changed / removed
- 0 / 0
- 62 lines unchanged
Lines that differ from the NEP (7)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Road connecting Curing Avanue to Antonino P. Roman Memorial Hospital, Barangay Mulawin to Barangay Dona, Orani, Bataan | Added by the House | — | ₱40,000,000 | HB p. 497 |
| Rehabilitation of Multi-Purpose Building, Barangay Calaylayan, Abucay, Bataan (14.769242, 120.537335) | Added by the House | — | ₱10,000,000 | HB p. 717 |
| Construction of Multi-Purpose Building, Barangay Saba, Hermosa, Bataan, 14.85607828, 120.51675173 | Added by the House | — | ₱5,000,000 | HB p. 717 |
| Construction of Multi-Purpose Building, Barangay Bayan, Orani, Bataan, 14.798033, 120.533475 | Added by the House | — | ₱5,000,000 | HB p. 717 |
| Construction (Completion) of Multi-Purpose Building, Sitio Suha, Barangay Mabuco, Hermosa, Bataan, 14.821293, 120.514296 | Added by the House | — | ₱3,000,000 | HB p. 717 |
| Construction (Completion) of Multi-Purpose Building, Sitio Bakawan, Barangay Wawa, Abucay, Bataan, 14.721254, 120.547477 | Added by the House | — | ₱3,000,000 | HB p. 717 |
| Rehabilitation/Completion of Multi-Purpose Building, Barangay East Daan Bago, Samal, Bataan (14.767941, 120.543602) | Added by the House | — | ₱3,000,000 | HB p. 717 |
Past DPWH contracts under this office
862 contracts from 2016 to 2025 in public DPWH records (₱14.86B): 748 recorded as completed, 95 as ongoing. 807 have a satellite image check on file. Browse them.
17 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Project along Colo River, Sacrifice Valley Section, Phase ERD-I, Hermosa, Bataan 22CA0026 · Completed · ₱24.5MDuplicate or Near-Duplicate Projects
- Construction of Damaged Flood Control Structure Barangay Pulo, Hermosa, Bataan 23CA0012 · Completed · ₱19.6MAwards Very Close to the Budget Ceiling; Duplicate or Near-Duplicate Projects
- Construction of Flood Control Structure along Barangay Pulo, Hermosa, Bataan 24CA0023 · Completed · ₱9.9MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure along Tuyo River (Phase II-DM), Abucay, Bataan 24CA0017 · Completed · ₱96.5MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Flood Control Project along Pulo-Almacen River, Phase IV-DMC, Hermosa, Bataan 24CA0048 · Completed · ₱96.5MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Flood Control Project along Pentor - Balsik River, Balsik Section, Phase IV-DMC, Hermosa, Bataan 24CA0047 · Completed · ₱96.5MAwards Very Close to the Budget Ceiling · satellite before / after
- Construciton of Flood Control Project Along Colo River , Maite Section , Phase IV-DMC, Hermosa, Bataan 24CA0036 · Completed · ₱96.5MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Flood Control Structure along Tapulao River (Phase II-AA), Orani, Bataan 23CA0040 · Completed · ₱49.0MAwards Very Close to the Budget Ceiling
- Construction of Flood Control Structure along San Juan River, Sitio Pugad Lawin, Barangay San Juan, Phase 1A - CDA, Samal, Bataan 22CA0046 · Completed · ₱49.0MAwards Very Close to the Budget Ceiling
- Construction of Flood Control Structure along Tuyo River, Abucay Section (Phase II-AA), Abucay, Bataan 23CA0039 · Completed · ₱49.0MAwards Very Close to the Budget Ceiling; Cross-Source Mismatch (PhilGEPS vs DPWH)
- Construction of Flood Control Structure along Capitangan River (Phase II-AA), Abucay, Bataan 23CA0028 · Completed · ₱49.0MAwards Very Close to the Budget Ceiling
- Construction of Flood Control Structure along Sapang Balsik Tributary to Almacen River (Phase II-AA), Hermosa, Bataan 23CA0029 · Completed · ₱49.0MAwards Very Close to the Budget Ceiling
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.