Hon. Josefina B. Tallado Representative, Camarines Norte (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Camarines Norte (First District) Dear Representative Josefina B. Tallado: Good day. I live in Camarines Norte (First District), and I would like to ask about some DPWH lines for the Camarines Norte DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Multi-Purpose Building ,Barangay Kagtalaba, Santa Elena, Camarines Norte, 14.11930975556, 122.38028735556 (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 788; no matching NEP line for this office] 2. Construction of Multi-purpose Building, Barangay Kabuluan, Santa Elena, Camarines Norte (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] 3. Construction of Multi-purpose Building, Barangay Maulawin, Santa Elena, Camarines Norte, 14.10856671389, 122.33353330556 (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] 4. Construction of Multi-purpose Building, Barangay San Roque, Capalonga, Camarines Norte, 14.32914, 122.55206 (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] 5. Construction of Multi-purpose Building, Barangay Tawig, Paracale, Camarines Norte, 14.25514313056, 122.75687700556 (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] 6. Construction of Multi-purpose Building, Barangay Dancalan, Paracale, Camarines Norte, 14.23050221111, 122.85425062778 (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] 7. Construction of Multi-purpose Building, Barangay Tabas, Paracale, Camarines Norte, 14.25586612778, 122.83727723889 (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] 8. Construction of Multi-purpose Building, Barangay Pinagbirayan Malaki, Paracale, Camarines Norte, 14.24236254167, 122.78997684444 (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] 9. Construction of Multi-purpose Building, Barangay Catioan, Capalonga, Camarines Norte, 14.32158529722, 122.49988901389 (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] 10. Construction of Multi-Purpose Building, Purok 7, Barangay Talobatib, Labo, Camarines Norte (Camarines Norte DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 789; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Camarines Norte DEO: 1,747 contracts (2016–2025) in public DPWH records; 1,546 recorded as completed and 164 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Structure at Labo River, Mabilo II, Labo, Camarines Norte (23FC0039): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/0c9a195b-2500-44a3-9b84-35f4cd06a5b6 - Construction of Flood Control, Calabasa (Phase IV), Labo, Camarines Norte (23FC0041): Cross-Source Mismatch (PhilGEPS vs DPWH). https://lovethephilippines.com/projects/fe6ab39f-21ce-40cb-92f8-f140ac77f884 - Construction of Flood Control, Barangay Matanlang (Phase II), Labo, Camarines Norte (22FC0169): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/5ce4bbef-e64d-4522-93ec-d2c8005d3a13 - Construction of Sula Seawall, Barangay Sula, Vinzons, Camarines Norte (22FC0142): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/772a1e5f-f87e-4830-a2d4-e95a8c6a95e4 - Construction of Labo River Control Structure (Mabilo Section), Brgy. Mabilo, Labo, Camarines Norte (22FC0051): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/9036c793-fe54-41e7-8529-9780d7c3ce75 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/camarines-norte-1st
Write your representative · FY2027 budget
Camarines Norte (First District)
Representative: Josefina B. Tallado · bills and roles · official House profile
Served by: Camarines Norte DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 14 lines selected.
Camarines Norte DEO
- House version (HB 10858)
- ₱556.6M
- 39 lines
- President’s NEP
- ₱486.6M
- 25 lines
- Added by the House
- 14
- ₱70.0M
- Changed / removed
- 0 / 0
- 25 lines unchanged
Lines that differ from the NEP (14)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Multi-Purpose Building ,Barangay Kagtalaba, Santa Elena, Camarines Norte, 14.11930975556, 122.38028735556 | Added by the House | — | ₱5,000,000 | HB p. 788 |
| Construction of Multi-purpose Building, Barangay Kabuluan, Santa Elena, Camarines Norte | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building, Barangay Maulawin, Santa Elena, Camarines Norte, 14.10856671389, 122.33353330556 | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building, Barangay San Roque, Capalonga, Camarines Norte, 14.32914, 122.55206 | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building, Barangay Tawig, Paracale, Camarines Norte, 14.25514313056, 122.75687700556 | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building, Barangay Dancalan, Paracale, Camarines Norte, 14.23050221111, 122.85425062778 | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building, Barangay Tabas, Paracale, Camarines Norte, 14.25586612778, 122.83727723889 | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building, Barangay Pinagbirayan Malaki, Paracale, Camarines Norte, 14.24236254167, 122.78997684444 | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building, Barangay Catioan, Capalonga, Camarines Norte, 14.32158529722, 122.49988901389 | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-Purpose Building, Purok 7, Barangay Talobatib, Labo, Camarines Norte | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-Purpose Building, Barangay Tigbinan, Labo, Camarines Norte | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-Purpose Building, Barangay Mabilo 2, Labo, Camarines Norte | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building , Barangay Dagang, Paracale, Camarines NorteA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱5,000,000 | HB p. 789 |
| Construction of Multi-purpose Building, Barangay Malangcao-Basud, Labo, Camarines NorteA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱5,000,000 | HB p. 790 |
Past DPWH contracts under this office
1,747 contracts from 2016 to 2025 in public DPWH records (₱30.22B): 1,546 recorded as completed, 164 as ongoing. 1,541 have a satellite image check on file. Browse them.
16 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Structure at Labo River, Mabilo II, Labo, Camarines Norte 23FC0039 · Completed · ₱95.6MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control, Calabasa (Phase IV), Labo, Camarines Norte 23FC0041 · Completed · ₱95.5MCross-Source Mismatch (PhilGEPS vs DPWH) · satellite before / after
- Construction of Flood Control, Barangay Matanlang (Phase II), Labo, Camarines Norte 22FC0169 · Completed · ₱49.5MPattern Consistent with Contract Splitting
- Construction of Sula Seawall, Barangay Sula, Vinzons, Camarines Norte 22FC0142 · Completed · ₱49.2MPattern Consistent with Contract Splitting
- Construction of Labo River Control Structure (Mabilo Section), Brgy. Mabilo, Labo, Camarines Norte 22FC0051 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure (Phase 2) at Brgy. Mabilo, Labo, Camarines Norte 23FC0062 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting
- Construction of River Control, Barangay Mabilo I - Barangay San Antonio, Labo, Camarines Norte 22FC0078 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure (Phase 4), Barangay San Antonio, Labo, Camarines Norte 23FC0045 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting
- Construction of Flood Control Structure (Phase 1) at Brgy. Mabilo, Labo, Camarines Norte 23FC0061 · Completed · ₱48.3MPattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects
- Construction of Flood Control Structure (Phase 2) at Brgy. Mabilo, Labo, Camarines Norte 22FC0079 · Completed · ₱34.3MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure (Phase 1) at Brgy. Mabilo, Labo, Camarines Norte 22FC0074 · Completed · ₱33.3MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure at Barangay Mabilo II, Labo, Camarines Norte 22FC0073 · Completed · ₱24.5MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.