Hon. Tsuyoshi Anthony "Hori" G. Horibata Representative, Camarines Sur (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Camarines Sur (First District) Dear Representative Tsuyoshi Anthony "Hori" G. Horibata: Good day. I live in Camarines Sur (First District), and I would like to ask about some DPWH lines for the Camarines Sur 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Multi-Purpose Building, Barangay Godofredo Reyes Sr., Ragay, Camarines Sur, 13.878664, 122.665854 (Camarines Sur 1st DEO): not in the NEP; ₱21,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 790; no matching NEP line for this office] 2. Construction of Multi-Purpose Building (Covered Court), Barangay Taisan, Sipocot, Camarines Sur, 13.768445, 122.940221 (Camarines Sur 1st DEO): not in the NEP; ₱12,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 790; no matching NEP line for this office] 3. Construction of Multi-Purpose Building, Barangay South Centro, Sipocot, Camarines Sur (Camarines Sur 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 790; no matching NEP line for this office] 4. Construction of Two-Storey Extension Building, Barangay South Centro, Sipocot, Camarines Sur (Camarines Sur 1st DEO): not in the NEP; ₱7,500,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 790; no matching NEP line for this office] 5. Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Pandan, Cabusao, Camarines Sur (Camarines Sur 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 790; no matching NEP line for this office] 6. Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Cabutagan, Lupi, Camarines Sur, 13.777394, 122.909790 (Camarines Sur 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 790; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Camarines Sur 1st DEO: 688 contracts (2016–2025) in public DPWH records; 545 recorded as completed and 94 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Mitigation Structure, Barangay Cotmo, Sipocot, Camarines Sur (24FD0006): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/3d28239a-53d9-4f5e-9468-101b12fe0e26 - Construction of Shore Protection Structure, Barangay Lower Omon, Ragay, Camarines Sur (24FD0035): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/b04beb08-effc-4ed7-b375-123c80757bac - Construction of Flood Mitigation Structure along Colacling River, Bulawan Jr., Lupi, Camarines Sur (24FD0037): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/8d4c2fde-415d-430c-a4b9-dbbe376c3940 - Construction of Flood Mitigation Structure along Colacling River, Colacling, Lupi, Camarines Sur (24FD0036): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/263b1621-651a-4976-9048-eb7e2a036d52 - Construction of Flood Mitigation Structure, Barangay Sooc, Lupi, Camarines Sur (24FD0039): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/cc11dea4-a3c8-4bf7-8a23-b6336f8a96c7 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/camarines-sur-1st
Write your representative · FY2027 budget
Camarines Sur (First District)
Representative: Tsuyoshi Anthony "Hori" G. Horibata · bills and roles · official House profile
Served by: Camarines Sur 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
6 of 6 lines selected.
Camarines Sur 1st DEO
- House version (HB 10858)
- ₱509.5M
- 43 lines
- President’s NEP
- ₱449.0M
- 37 lines
- Added by the House
- 6
- ₱60.5M
- Changed / removed
- 0 / 0
- 37 lines unchanged
Lines that differ from the NEP (6)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Multi-Purpose Building, Barangay Godofredo Reyes Sr., Ragay, Camarines Sur, 13.878664, 122.665854 | Added by the House | — | ₱21,000,000 | HB p. 790 |
| Construction of Multi-Purpose Building (Covered Court), Barangay Taisan, Sipocot, Camarines Sur, 13.768445, 122.940221 | Added by the House | — | ₱12,000,000 | HB p. 790 |
| Construction of Multi-Purpose Building, Barangay South Centro, Sipocot, Camarines Sur | Added by the House | — | ₱10,000,000 | HB p. 790 |
| Construction of Two-Storey Extension Building, Barangay South Centro, Sipocot, Camarines Sur | Added by the House | — | ₱7,500,000 | HB p. 790 |
| Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Pandan, Cabusao, Camarines Sur | Added by the House | — | ₱5,000,000 | HB p. 790 |
| Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Cabutagan, Lupi, Camarines Sur, 13.777394, 122.909790 | Added by the House | — | ₱5,000,000 | HB p. 790 |
Past DPWH contracts under this office
688 contracts from 2016 to 2025 in public DPWH records (₱16.73B): 545 recorded as completed, 94 as ongoing. 635 have a satellite image check on file. Browse them.
6 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Mitigation Structure, Barangay Cotmo, Sipocot, Camarines Sur 24FD0006 · Completed · ₱114.0MSchedule / Date Inconsistencies · satellite before / after
- Construction of Shore Protection Structure, Barangay Lower Omon, Ragay, Camarines Sur 24FD0035 · Completed · ₱96.5MSchedule / Date Inconsistencies · satellite before / after
- Construction of Flood Mitigation Structure along Colacling River, Bulawan Jr., Lupi, Camarines Sur 24FD0037 · Completed · ₱96.5MSchedule / Date Inconsistencies · satellite before / after
- Construction of Flood Mitigation Structure along Colacling River, Colacling, Lupi, Camarines Sur 24FD0036 · Completed · ₱96.5MSchedule / Date Inconsistencies · satellite before / after
- Construction of Flood Mitigation Structure, Barangay Sooc, Lupi, Camarines Sur 24FD0039 · Completed · ₱94.3MSchedule / Date Inconsistencies · satellite before / after
- Construction of Riverbank Protection Structure along Libmanan River, Brgy. Manangle Section, Sipocot, Camarines Sur 23FD0018 · Completed · ₱82.0MAwards Very Close to the Budget Ceiling · satellite before / after
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.