Hon. Ann Matibag Representative, Laguna (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Laguna (First District) Dear Representative Ann Matibag: Good day. I live in Laguna (First District), and I would like to ask about some DPWH lines for the Laguna 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Rehabilitation of Roads and Drainage, Southville 4, Barangay Pooc to Barangay Caingin, City of Santa Rosa, Laguna (Laguna 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 538; no matching NEP line for this office] 2. Construction of Multi-Purpose Building, Roseville Subd., Barangay Dita, City of Santa Rosa, Laguna, 14.274889, 121.113209 (Laguna 2nd DEO): not in the NEP; ₱45,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 763; no matching NEP line for this office] 3. Construction of Road and Drainage Canal Along Biñan River, Barangay Malaban, Biñan City, Laguna (Laguna 2nd DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 538; no matching NEP line for this office] 4. Construction of Multi-purpose Building, Barangay La Mesa, Calamba Cty, Laguna (Laguna 2nd DEO): not in the NEP; ₱37,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 764; no matching NEP line for this office] 5. Construction of Road and Drainage at Barangay Makiling, Calamba City, Laguna, 14.15027306, 121.14606389 (Laguna 2nd DEO): not in the NEP; ₱36,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 538; no matching NEP line for this office] 6. Rehabilitation of Bridge, Barangay Malitlit, City of Santa Rosa, Laguna, 14.26841389, 121.11262528 (Laguna 2nd DEO): not in the NEP; ₱35,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 538; no matching NEP line for this office] 7. Construction of 2 Units of Solar Water System, Barangay Dila, Santa Rosa City, Laguna (Laguna 2nd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 377; no matching NEP line for this office] 8. Construction of Multi-Purpose Building, Barangay Dela Paz, Binan City, Laguna (Laguna 2nd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 765; no matching NEP line for this office] 9. Construction of Drainage System leading to Tram Plaza, Barangay Balibago, City of Santa Rosa, Laguna (Laguna 2nd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 340; no matching NEP line for this office] 10. Construction of Drainage at Barangay Siranglupa, Calamba City, Laguna (Laguna 2nd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 340; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Laguna 2nd DEO: 1,479 contracts (2016–2025) in public DPWH records; 1,106 recorded as completed and 329 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Structure for River Protection Along Malitlit Waterways, (Near Eton Road), Sta. Rosa City, Laguna Phase II (23DI0117): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/b8da5d33-a2f9-4624-9701-f356e2a0d47e - Construction of Revetment/Riverwall at Binan River (Phase 2) (staggered) near Barangay San Vicente, Binan City, Laguna (22DI0107): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/dc990bc8-857d-4042-b628-1d7606a00cb6 - Construction of Riverwall, Biñan River near Barangay San Vicente (Staggered), Biñan City, Laguna (22DI0106): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/430c9524-b5db-40a1-ad87-a1bc9cfefe1c - Construction of River Protection of Biñan River along Barangay Casile and Barangay Malaban, Phase II, Biñan City, Laguna (22DI0127): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/f1fd5558-5844-4c2f-a405-5aaddc8f3b0d - Construction of Drainage, Barangay Bayog, Los Baños, Laguna (23DI0041): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/e17ca4b3-157c-4ebd-8830-dbdbef11a042 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/laguna-1st
Write your representative · FY2027 budget
Laguna (First District)
Representative: Ann Matibag · bills and roles · official House profile
Served by: Laguna 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 52 lines selected.
Laguna 2nd DEO
This district engineering office also serves City Of Biñan (Lone District); City Of Calamba (Lone District); City Of Sta. Rosa (Lone District); Laguna (Second District). The budget lines below belong to the office, not to one district.
- House version (HB 10858)
- ₱1.76B
- 95 lines
- President’s NEP
- ₱1.37B
- 68 lines
- Added by the House
- 39
- ₱680.5M
- Changed / removed
- 1 / 12
- 55 lines unchanged
Lines that differ from the NEP (40)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Rehabilitation of Roads and Drainage, Southville 4, Barangay Pooc to Barangay Caingin, City of Santa Rosa, Laguna | Added by the House | — | ₱50,000,000 | HB p. 538 |
| Construction of Multi-Purpose Building, Roseville Subd., Barangay Dita, City of Santa Rosa, Laguna, 14.274889, 121.113209 | Added by the House | — | ₱45,000,000 | HB p. 763 |
| Construction of Road and Drainage Canal Along Biñan River, Barangay Malaban, Biñan City, Laguna | Added by the House | — | ₱40,000,000 | HB p. 538 |
| Construction of Multi-purpose Building, Barangay La Mesa, Calamba Cty, Laguna | Added by the House | — | ₱37,000,000 | HB p. 764 |
| Construction of Road and Drainage at Barangay Makiling, Calamba City, Laguna, 14.15027306, 121.14606389 | Added by the House | — | ₱36,000,000 | HB p. 538 |
| Rehabilitation of Bridge, Barangay Malitlit, City of Santa Rosa, Laguna, 14.26841389, 121.11262528 | Added by the House | — | ₱35,000,000 | HB p. 538 |
| Construction of 2 Units of Solar Water System, Barangay Dila, Santa Rosa City, Laguna | Added by the House | — | ₱30,000,000 | HB p. 377 |
| Construction of Multi-Purpose Building, Barangay Dela Paz, Binan City, Laguna | Added by the House | — | ₱30,000,000 | HB p. 765 |
| Construction of Drainage System leading to Tram Plaza, Barangay Balibago, City of Santa Rosa, Laguna | Added by the House | — | ₱25,000,000 | HB p. 340 |
| Construction of Drainage at Barangay Siranglupa, Calamba City, Laguna | Added by the House | — | ₱25,000,000 | HB p. 340 |
| Construction of Solar Water System, Barangay Putinglupa, Calamba City, Laguna | Added by the House | — | ₱20,000,000 | HB p. 377 |
| Construction of Multi-Purpose Building, Garden Villas Subd., Barangay Malusak, City of Santa Rosa, Laguna, 14.309198, 121.120605 | Added by the House | — | ₱20,000,000 | HB p. 763 |
| Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, LagunaA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱20,000,000 | HB p. 765 |
| Construction of Multi - Purpose Building, Elvinda, Barangay Fatima, San Pedro City Laguna | Added by the House | — | ₱16,500,000 | HB p. 765 |
| Construction of Drainage Along Dela Rosa St. to J. Felipe, Barangay Chrysanthemum, San Pedro City, Laguna | Added by the House | — | ₱15,000,000 | HB p. 340 |
| Construction of Multi- Purpose Building, Barangay Caingin, City of Santa Rosa, Laguna, 14.298737, 121.128369 | Added by the House | — | ₱15,000,000 | HB p. 763 |
| Construction of Multi-Purpose Building (Covered Court), Barangay Pansol, Calamba City, Laguna, 14.180673, 121.178882 | Added by the House | — | ₱15,000,000 | HB p. 764 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay San Antonio, San Pedro City, Laguna, 14.333425, 121.008741 | Added by the House | — | ₱15,000,000 | HB p. 764 |
| Construction of Multi-Purpose Building (Covered Court), at Barangay Sampaguita, San Pedro City, LagunaA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱15,000,000 | HB p. 764 |
| Construction of Multi-Purpose Building, Barangay Canlalay, Binan City, Laguna | Added by the House | — | ₱15,000,000 | HB p. 765 |
| Construction of Multi-Purpose Building, Barangay Malaban Central, Binan City, Laguna | Added by the House | — | ₱15,000,000 | HB p. 766 |
| Construction of Multi-Purpose Building, Barangay Sto. Tomas, Binan City, Laguna | Added by the House | — | ₱15,000,000 | HB p. 766 |
| Construction of Multi-Purpose Building (Covered Court), Barangay Rosario, San Pedro City, Laguna, 14.340879, 121.049999 | Added by the House | — | ₱13,000,000 | HB p. 764 |
| Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna, 14.209031, 121.162689 | Added by the House | — | ₱12,000,000 | HB p. 764 |
| Construction of Multi-Purpose Building (Barangay Hall) at Barangay Bagong Silang, San Pedro City, Laguna, 14.335649, 121.026669 | Added by the House | — | ₱12,000,000 | HB p. 764 |
| Construction of Multi-Purpose Building, Barangay San Jose, Binan City, Laguna | Added by the House | — | ₱12,000,000 | HB p. 765 |
| Construction of Multi - Purpose Building at Barangay Chrysanthemum, (CVHAI) San Pedro City, LagunaMatched to the NEP by a close title, not an exact one. | Reduced | ₱20,000,000 | ₱8,500,000 | HB p. 763 NEP PDF p. 617 |
| Construction of Roads and Drainage at Barangay Banlic, Calamba City, Laguna, 14.2291144, 121.14758035 | Added by the House | — | ₱10,000,000 | HB p. 538 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Chrysanthemum, San Pedro City, Laguna, 14.341434, 121.043836 | Added by the House | — | ₱10,000,000 | HB p. 764 |
| Construction of Multi-Purpose Building (Senior Citizen's Hall) at Barangay Chrysanthemum, San Pedro City, Laguna | Added by the House | — | ₱8,000,000 | HB p. 763 |
| Construction/Completion of Multi-Purpose Building (LRCS) at Barangay United Bayanihan, San Pedro City, Laguna | Added by the House | — | ₱7,000,000 | HB p. 763 |
| Construction of Multi-Purpose Building, Barangay Zapote, Binan City, Laguna | Added by the House | — | ₱7,000,000 | HB p. 765 |
| Construction of Drainage at Barangay Camaligan, Calamba City, Laguna | Added by the House | — | ₱5,000,000 | HB p. 340 |
| Construction of Road and Drainage at Barangay Milagrosa, Calamba City, Laguna | Added by the House | — | ₱5,000,000 | HB p. 538 |
| Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Banlic, Calamba City, Laguna, 14.23182381, 121.15080943 | Added by the House | — | ₱5,000,000 | HB p. 764 |
| Construction (Completion) of Multi-Purpose Building, Barangay Canlubang, Calamba City, Laguna, 14.20684902, 121.09893786 | Added by the House | — | ₱5,000,000 | HB p. 764 |
| Construction (Completion) of Multi-Purpose Building, Barangay Kay-anlog, Calamba City, Laguna, 14.15910319, 121.10739441 | Added by the House | — | ₱5,000,000 | HB p. 764 |
| Construction of Multi-purpose Building, Barangay Lingga, Calamba City, Laguna, 14.21427, 121.184283 | Added by the House | — | ₱5,000,000 | HB p. 764 |
| Construction of Multi-Purpose Building, Barangay Mayapa, Calamba City, Laguna, 14.20897413, 121.12555252 | Added by the House | — | ₱5,000,000 | HB p. 764 |
| Completion of Multi - Purpose Building (PEA 2B Covered Court) at Barangay Langgam, San Pedro City, Laguna | Added by the House | — | ₱5,000,000 | HB p. 766 |
NEP lines with no match in the House version (12)
- Construction of Drainage at Barangay Timugan, Baybayin and Bambang, Los Ba ñ os, Laguna · ₱50,000,000 · NEP PDF p. 382
- Construction of River Protection Structure along Maitim Waterways (near Bridge ), Bay, Laguna · ₱50,000,000 · NEP PDF p. 382
- Construction of Road and Drainage System at Barangay Canlalay, Binan City, Laguna · ₱30,000,000 · NEP PDF p. 510
- Construction of Road and Drainage System at Barangay San Antonio, Binan City, Laguna · ₱30,000,000 · NEP PDF p. 510
- Construction of Drainage at Barangay Soro-soro, Bi ñ an City, Laguna · ₱25,000,000 · NEP PDF p. 382
- Construction of Drainage at Barangay Malinta, Los Ba ñ os, Laguna · ₱20,000,000 · NEP PDF p. 382
- Construction of Riverbank Protection Structure at Barangay Santo Nino, San Pedro, Laguna · ₱16,500,000 · NEP PDF p. 618
- Construction of Drainage Structure, Barangay San Antonio, Los Ba ñ os, Laguna · ₱15,000,000 · NEP PDF p. 382
- Construction of River Protection (near bay) at San Pedro City, Laguna · ₱15,000,000 · NEP PDF p. 382
- Construction of Covered Court at Barangay Narra, San Pedro City, Laguna · ₱15,000,000 · NEP PDF p. 617
- Turbina, Calamba, Laguna · ₱6,333,000 · NEP PDF p. 135
- Rehabilitation of Multi-Purpose Building (PEA 2B Covered Court ), Barangay Langgam, San Pedro City, Laguna · ₱5,000,000 · NEP PDF p. 618
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,479 contracts from 2016 to 2025 in public DPWH records (₱36.67B): 1,106 recorded as completed, 329 as ongoing. 1,353 have a satellite image check on file. Browse them.
10 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Structure for River Protection Along Malitlit Waterways, (Near Eton Road), Sta. Rosa City, Laguna Phase II 23DI0117 · Completed · ₱96.4MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Revetment/Riverwall at Binan River (Phase 2) (staggered) near Barangay San Vicente, Binan City, Laguna 22DI0107 · Completed · ₱49.5MPattern Consistent with Contract Splitting
- Construction of Riverwall, Biñan River near Barangay San Vicente (Staggered), Biñan City, Laguna 22DI0106 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of River Protection of Biñan River along Barangay Casile and Barangay Malaban, Phase II, Biñan City, Laguna 22DI0127 · Completed · ₱48.9MPattern Consistent with Contract Splitting
- Construction of Drainage, Barangay Bayog, Los Baños, Laguna 23DI0041 · Completed · ₱6.9MDuplicate or Near-Duplicate Projects
- Construction of Drainage in Barangay Bayog, Los Baños, Laguna 22DI0063 · Completed · ₱5.9MDuplicate or Near-Duplicate Projects
- Construction of Structure for Riverbank Protection along Sta. Rosa River, (near CALAX), Sta. Rosa City, Laguna 23DI0053 · Completed · ₱96.5MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Structure for River Protection Along Malitlit Waterways, (Near Eton Road), Sta. Rosa City, Laguna 23DI0116 · Completed · ₱96.4MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Revetment at Barangay Maahas, Los Baños, Laguna 23DI0017 · Completed · ₱72.4MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection along Sto. Domingo River, Barangay Sto. Domingo, Santa Rosa City, Laguna 23DI0144 · Completed · ₱9.9MSchedule / Date Inconsistencies
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
