Representative: Bienvenido Jr. M. Abante · bills and roles · official House profile

Served by: North Manila DEO; South Manila DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 41 lines selected.

Hon. Bienvenido Jr. M. Abante
Representative, Manila City (Sixth District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Manila City (Sixth District)

Dear Representative Bienvenido Jr. M. Abante:

Good day. I live in Manila City (Sixth District), and I would like to ask about some DPWH lines for the North Manila DEO and South Manila DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Rehabilitation of Drainage System along Makiling St. Chainage 000 to Chainage 338, Manila City (North Manila DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
2. Construction (Completion) of Catch Basin at Rajah Sulayman Plaza, Barangay 700, Zone 77, Malate, Manila, 14.569025, 120.984068 (South Manila DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 320; no matching NEP line for this office]
3. Rehabilitation of Drainage System along M. Roxas Service Road (S02328LZ) Chainage 264.00 to Chainage 471.00, Manila City, Metro Manila (North Manila DEO): not in the NEP; ₱39,700,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
4. Rehabilitation of Drainage System along Corregidor St., Manila City (North Manila DEO): not in the NEP; ₱38,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
5. Construction (Completion) of the DPWH North Manila District Engineering Office (New Building) including Support Facilities, Manila City, 14.59787372, 121.00369026 (North Manila DEO): not in the NEP; ₱35,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 924; no matching NEP line for this office]
6. Rehabilitation of Drainage System along Galicia Street Chainage 163.20 to Chainage 337.80, Manila City (North Manila DEO): not in the NEP; ₱28,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
7. Rehabilitation of Drainage System along Bagac Street, Tondo, Manila City, Metro Manila (North Manila DEO): not in the NEP; ₱27,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
8. Construction (Completion) of Multi-Purpose Building, Barangay 740, Zone 80, Malate, Manila 14.57335, 120.99595 (South Manila DEO): not in the NEP; ₱27,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 654; no matching NEP line for this office]
9. Improvement of Road along Pedro Gil St. from Taft Ave to P. Quirino Ave. Manila City (South Manila DEO): not in the NEP; ₱21,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 451; no matching NEP line for this office]
10. Rehabilitation of Multi Purpose Building located inside of Patricia Paraiso Sports Complex, Manila City, 14.6341862, 120.9740897 (North Manila DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 652; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- North Manila DEO: 1,766 contracts (2016–2025) in public DPWH records; 1,578 recorded as completed and 135 as ongoing.
- South Manila DEO: 1,355 contracts (2016–2025) in public DPWH records; 1,142 recorded as completed and 142 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Rehabilitation of Drainage System, Zone 1-12, Tondo, Manila City (24OE0180): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/494c331d-9557-4da3-9c05-fddddf5ca09b
- Installation of Booster Pump including Accessories at Estero de Vitas, Barangay 151, Manila City (22OE0007): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/8a5b7cb1-6ca9-48a3-967f-8c7fbf429347
- Rehabilitation of Drainage System at Zone 41-57 (Phase 2), Manila City (23OE0089): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/a6f1e215-d33f-4056-905e-fe9fd963ad64
- Construction of Pumping Station at Estero dela Reina, Barangay 55 (Phase II), Tondo, Manila City (24OE0002): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/b3284acb-a20b-4997-9887-f6fe7317b66e
- Rehabilitation of Drainage System at Zone 41-57, Manila City (22OE0030): Duplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/91a245c3-c5d5-498d-8e09-c25c82fca047
- Construction of Booster Pumping Station Along Estero de Tripa de Gallina Along Pedro Gil Street Barangay 869, Manila City, Phase II (25OH0006): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/2f9b6b50-f829-4886-8073-305f676fca6d
- Construction of Slope Protection of Libertad Retarding Pond, Pasay City (23OH0010): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/a3194b77-f017-4015-a8ab-cdb6b5582c1d
- Construction of Drainage System, Revillen St. and Vicinity (J. Syquia St. to Tejeron St.), Manila (24OH0058): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/67e01c0a-425d-4850-8d48-40eb2ead3a05
- Construction of Drainage System, Zone 91, Pandacan, Manila (24OH0043): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/cc3eee20-c184-402b-a44c-6403f842ec13
- Rehabilitation of Drainage Structure, Barangay 648, San Miguel, Manila Phase II (22OH0108): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/5a9f0e09-5d85-4a0a-a56a-cb916cfd672c

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/manila-6th

North Manila DEO

This district engineering office also serves Manila City (First District); Manila City (Second District); Manila City (Third District); Manila City (Fourth District). The budget lines below belong to the office, not to one district.

House version (HB 10858)
₱1.37B
89 lines
President’s NEP
₱1.00B
66 lines
Added by the House
25
₱378.4M
Changed / removed
0 / 2
64 lines unchanged
Lines that differ from the NEP (25)
LineChangeNEPHouseSources
Rehabilitation of Drainage System along Makiling St. Chainage 000 to Chainage 338, Manila CityAdded by the House—₱50,000,000HB p. 317
Rehabilitation of Drainage System along M. Roxas Service Road (S02328LZ) Chainage 264.00 to Chainage 471.00, Manila City, Metro ManilaAdded by the House—₱39,700,000HB p. 317
Rehabilitation of Drainage System along Corregidor St., Manila CityAdded by the House—₱38,000,000HB p. 317
Construction (Completion) of the DPWH North Manila District Engineering Office (New Building) including Support Facilities, Manila City, 14.59787372, 121.00369026Added by the House—₱35,000,000HB p. 924
Rehabilitation of Drainage System along Galicia Street Chainage 163.20 to Chainage 337.80, Manila CityAdded by the House—₱28,000,000HB p. 317
Rehabilitation of Drainage System along Bagac Street, Tondo, Manila City, Metro ManilaAdded by the House—₱27,000,000HB p. 317
Rehabilitation of Multi Purpose Building located inside of Patricia Paraiso Sports Complex, Manila City, 14.6341862, 120.9740897Added by the House—₱20,000,000HB p. 652
Rehabiltiation and Improvement of DPWH North Manila District Engineering Office (Existing Building), Manila CityAdded by the House—₱15,000,000HB p. 924
A Maceda St - K0005 + 304 - K0006 + 000Added by the House—₱13,700,000HB p. 134
Ma. Clara St. (S02454LZ) K0008 + 421 - K0008 + 749Added by the House—₱12,000,000HB p. 134
Rehabilitation of Drainage System at Barangay 158 Zone 14, Manila City, Metro ManilaAdded by the House—₱10,000,000HB p. 317
Construction of Multi-Purpose Building, Dolmar Golden Hills, Barangay 167, Caloocan CityAdded by the House—₱10,000,000HB p. 652
Repair/Improvement of Multi-Purpose Building, Rene Cayetano, Barangay 176-D, Caloocan CityAdded by the House—₱10,000,000HB p. 652
Rehabilitation of Roads along Dagupan St., (Bulacan St., to Dead End), Manila CityAdded by the House—₱7,500,000HB p. 449
Rehabilitation of Drainage System along Moret Street Chainage 193 to Chainage 238.20, Manila CityAdded by the House—₱7,000,000HB p. 317
Construction of Drainage along Yuseco St. (PNR Crossing), C885.70 to C900.30, Manila City, Metri ManilaAdded by the House—₱7,000,000HB p. 317
VG Cruz St. (S02472LZ) K0005 + 520 - K0005 + 662Added by the House—₱6,500,000HB p. 134
Blumentritt St (LZ) - K0006 + (-1186) - K0006 + (-784)Added by the House—₱6,000,000HB p. 121
Rehabilitation of Drainage System along Loreto Ext. (M. Francisco to A.H. Lacson) Chainage 0 to Chainage 98, Manila CityAdded by the House—₱6,000,000HB p. 317
Rehabilitation of Drainage System at Barangay 154 Zone 14, Manila City, Metro ManilaAdded by the House—₱5,000,000HB p. 317
Rehabilitation of Drainage System at Barangay 179 Zone 16, Manila City, Metro ManilaAdded by the House—₱5,000,000HB p. 317
Rehabilitation of Roads along Yuseco St., (Yuseco Br. - PNR), Manila CityAdded by the House—₱5,000,000HB p. 449
Improvement of of Multi-Purpose Building, Natividad Subdivision Phase 1, Barangay 168, Caloocan CityAdded by the House—₱5,000,000HB p. 652
Improvement of of Multi-Purpose Building, Natividad Subdivision Phase 3, Barangay 168, Caloocan CityAdded by the House—₱5,000,000HB p. 652
Rehabilitation of Multi-Purpose Building at Barangay 186, Manila City, Metro Manila, 14.63081252, 120.97503361Added by the House—₱5,000,000HB p. 652
NEP lines with no match in the House version (2)
  • Pacheco Street · ₱6,189,000 · NEP PDF p. 133
  • A. H. Lacson Avenue · ₱6,059,000 · NEP PDF p. 133

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

1,766 contracts from 2016 to 2025 in public DPWH records (₱57.53B): 1,578 recorded as completed, 135 as ongoing. 1,700 have a satellite image check on file. Browse them.

40 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

South Manila DEO

This district engineering office also serves Manila City (Fifth District); Pasay City (Lone District). The budget lines below belong to the office, not to one district.

House version (HB 10858)
₱798.0M
39 lines
President’s NEP
₱606.9M
29 lines
Added by the House
11
₱153.0M
Changed / removed
1 / 2
27 lines unchanged
Lines that differ from the NEP (12)
LineChangeNEPHouseSources
Upgrading of Balete Pumping Station, Manila City (14.587813, 120.987103)Matched to the NEP by a close title, not an exact one.Reduced₱150,000,000₱50,000,000HB p. 320
NEP PDF p. 350
Construction (Completion) of Catch Basin at Rajah Sulayman Plaza, Barangay 700, Zone 77, Malate, Manila, 14.569025, 120.984068Added by the House—₱50,000,000HB p. 320
Construction (Completion) of Multi-Purpose Building, Barangay 740, Zone 80, Malate, Manila 14.57335, 120.99595Added by the House—₱27,000,000HB p. 654
Improvement of Road along Pedro Gil St. from Taft Ave to P. Quirino Ave. Manila CityAdded by the House—₱21,000,000HB p. 451
Construction (Completion) of Multi-Purpose Building, Barangay 775, Zone 84 MPB (Sagrada Familia cor. Onyx St.) 14.571645, 121.006484Added by the House—₱15,000,000HB p. 655
Rehabilitation of Multi-Purpose Building at Philippine School for the Blind, Barangay 73 Zone 10 and its vicinity, Pasay City, 14.542464, 120.996305Added by the House—₱10,000,000HB p. 654
Improvement of Drainage System at Barangay 744, Zone 80, Manila CityAdded by the House—₱5,000,000HB p. 451
Rehabilitation of Multi-Purpose Building, Barangay 77 Zone 10 and its vicinity, Pasay City, 14.535558, 120.998649Added by the House—₱5,000,000HB p. 654
Rehabilitation of Multi-Purpose Building, Barangay 184 Zone 19 and its vicinity, Pasay City, 14.528556, 121.006309Added by the House—₱5,000,000HB p. 654
Rehabilitation of Multi-Purpose Building, Barangay 132 Zone 13 and its vicinity, Pasay City, 14.546231, 121.007711Added by the House—₱5,000,000HB p. 654
Rehabilitation of Multi-Purpose Building, Barangay 97 Zone 14 and its vicinity, Pasay City, 14.539816, 121.002382Added by the House—₱5,000,000HB p. 654
Rehabilitation of Multi-Purpose Building, Barangay 128 Zone 13 and its vicinity, Pasay City, 14.552133, 121.001321Added by the House—₱5,000,000HB p. 654
NEP lines with no match in the House version (2)
  • P. Quirino Avenue Extension · ₱5,954,000 · NEP PDF p. 133
  • MSDR West Service Road · ₱5,954,000 · NEP PDF p. 133

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

1,355 contracts from 2016 to 2025 in public DPWH records (₱29.19B): 1,142 recorded as completed, 142 as ongoing. 1,092 have a satellite image check on file. Browse them.

5 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.