Construction of Flood Mitigation Structure24OH0058

Construction of Drainage System, Revillen St. and Vicinity (J. Syquia St. to Tejeron St.), Manila

Construction of Drainage System, Revillen St. and Vicinity (J. Syquia St. to Tejeron St.), Manila is a DPWH-tracked public work in CITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital Region. Reported contract value: ₱28,936,681.15. Status: Reported complete (DPWH). Contractor on record: SLHAV CONST. Figures trace to sumbong.

CITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital Region
Region: National Capital Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱12,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-24-0008753 · ₱1,875,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24OH0058 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-07-06 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · NCR, City of Manila, First District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Drainage System, Revillen St. and Vicinity (J. Syquia St. to Tejeron St.), Manila

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱12,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Estero de Binondo, Barangay 281, Manila City
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-24-0008753

₱1,875,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-NCR-24-0008767

₱173,000.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

24 projects · ₱202.5M total · 1 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NAT'L. ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF BRIDGE OVER PASIG RIVER AT STA.ANA MAR

South Manila DEO, National Capital Region

2023₱28.8M
Reported complete (DPWH)
No sat.

CONST. OF HOSPITAL BUILDING (PHASE 2), SAMAR PROVINCIAL HOSPITAL, CATBALOGAN CITY, SAMAR

Samar 2nd DEO, Region VIII

2022₱19.6M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONSTRUCTON/REHABILITATION OF VARIOUS MULTI-PURPOSE BUILDINGS, BARANGAY 649, BASECO, PORT AREA, MANILA

South Manila DEO, National Capital Region

2021₱14.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-IMPROVEMENT OF VARIOUS ROADS/ALLEYS, ZONE 81/82, SINGALONG,MANILA

South Manila DEO, National Capital Region

2021₱14.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM -NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONSTRUCTION OF DPWH BOE EMPLOYEE'S QUARTERS, BONIFACIO DRIVE, PORT AREA, MANILA

South Manila DEO, National Capital Region

2023₱9.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-LIWASANG BONIFACIO EAST OVERPASS (FLYOVER) (BO3377LZ)ALONG LIWASANG BONIFACIO EAST OVERPASS, MANILA CITY

South Manila DEO, National Capital Region

2022₱6.7M
Reported complete (DPWH)
View all 24 projects →

4. Implementation

Contract Amount

₱28,936,681.15

Progress

Reported complete (DPWH)

Start Date

March 19, 2024

Target End

March 13, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaSanta AnaBarangay 873
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.