Hon. Yevgeny Vincente B. Emano Representative, Misamis Oriental (Second District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Misamis Oriental (Second District) Dear Representative Yevgeny Vincente B. Emano: Good day. I live in Misamis Oriental (Second District), and I would like to ask about some DPWH lines for the Misamis Oriental 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Water Supply System, El Salvador City, Misamis Oriental (Misamis Oriental 2nd DEO): not in the NEP; ₱40,925,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 386; no matching NEP line for this office] 2. Construction of Road Connecting National Road Junction to Misamis Oriental West Diversion Road, Sta.2+750 - Sta.3+750, Lugait To Manticao, Misamis Oriental (Misamis Oriental 2nd DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 608; no matching NEP line for this office] 3. Construction of Flood Control Structure along Lugait River, Sta.0+000 - Sta.0+130, Barangay Poblacion, Lugait, Misamis Oriental (Misamis Oriental 2nd DEO): not in the NEP; ₱39,910,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 354; no matching NEP line for this office] 4. Construction of Multi-Purpose Building, Sitio Mingcariis, Poblacion, Claveria, Misamis Oriental (Misamis Oriental 2nd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 877; no matching NEP line for this office] 5. Butuan City-Cagayan de Oro City-Iligan City Rd., K1460 + 000 - K1461 + 885l (Road Safety: Roadway Lighting) (Misamis Oriental 2nd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 238; no matching NEP line for this office] 6. Butuan City - Cagayan de Oro City - Iligan City Rd., K1401 + 060 (Road Safety: Pedestrian Overpass) (Misamis Oriental 2nd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 238; no matching NEP line for this office] 7. Completion of Multi-Purpose Building, Tagoloan, Misamis Oriental (Misamis Oriental 2nd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 878; no matching NEP line for this office] 8. Manticao Br. (B01336MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Misamis Oriental 2nd DEO): not in the NEP; ₱16,724,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 256; no matching NEP line for this office] 9. Butuan City-Cagayan de Oro City-Iligan City Rd., K1476 + 880 - K1478 + 068 (Road Safety: Roadway Lighting) (Misamis Oriental 2nd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 238; no matching NEP line for this office] 10. Construction of Multi-Purpose, Sitio Malaiba, Barangay Natumulan, Tagoloan, Misamis Oriental (Misamis Oriental 2nd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 877; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Misamis Oriental 2nd DEO: 1,140 contracts (2016–2025) in public DPWH records; 996 recorded as completed and 119 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Phase 2, Tagoloan, Misamis Oriental (24KL0065): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/9327b492-4fac-44c3-8fac-69203cecc839 - Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge (Package 2), Tagoloan, Misamis Oriental (24KL0012): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/3f61e2e8-5fd4-4157-928c-040c0a8f1032 - Construction of Flood Control Structure along Solana River (Upstream of Solana Bridge), Phase 2, Jasaan, Misamis Oriental (24KL0070): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/deb9181d-f414-405b-9618-c96d85de5364 - Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge, Tagoloan, Misamis Oriental (24KL0011): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/423507e7-677b-46ff-84d3-37b83e72709c - Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Phase 3, Tagoloan, Misamis Oriental (24KL0066): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/15783f7a-77a4-41ef-b639-e3d9b64dce09 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/misamis-oriental-2nd
Write your representative · FY2027 budget
Misamis Oriental (Second District)
Representative: Yevgeny Vincente B. Emano · bills and roles · official House profile
Served by: Misamis Oriental 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 35 lines selected.
Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.
Misamis Oriental 2nd DEO
- House version (HB 10858)
- ₱880.5M
- 67 lines
- President’s NEP
- ₱484.2M
- 34 lines
- Added by the House
- 33
- ₱404.6M
- Changed / removed
- 2 / 0
- 32 lines unchanged
Lines that differ from the NEP (35)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Water Supply System, El Salvador City, Misamis Oriental | Added by the House | — | ₱40,925,000 | HB p. 386 |
| Construction of Road Connecting National Road Junction to Misamis Oriental West Diversion Road, Sta.2+750 - Sta.3+750, Lugait To Manticao, Misamis Oriental | Added by the House | — | ₱40,000,000 | HB p. 608 |
| Construction of Flood Control Structure along Lugait River, Sta.0+000 - Sta.0+130, Barangay Poblacion, Lugait, Misamis Oriental | Added by the House | — | ₱39,910,000 | HB p. 354 |
| Construction of Multi-Purpose Building, Sitio Mingcariis, Poblacion, Claveria, Misamis Oriental | Added by the House | — | ₱30,000,000 | HB p. 877 |
| Butuan City-Cagayan de Oro City-Iligan City Rd., K1460 + 000 - K1461 + 885l (Road Safety: Roadway Lighting) | Added by the House | — | ₱25,000,000 | HB p. 238 |
| Butuan City - Cagayan de Oro City - Iligan City Rd., K1401 + 060 (Road Safety: Pedestrian Overpass) | Added by the House | — | ₱20,000,000 | HB p. 238 |
| Completion of Multi-Purpose Building, Tagoloan, Misamis Oriental | Added by the House | — | ₱20,000,000 | HB p. 878 |
| Manticao Br. (B01336MN) along Butuan City-Cagayan de Oro City-Iligan City Rd | Added by the House | — | ₱16,724,000 | HB p. 256 |
| Butuan City-Cagayan de Oro City-Iligan City Rd., K1476 + 880 - K1478 + 068 (Road Safety: Roadway Lighting) | Added by the House | — | ₱15,000,000 | HB p. 238 |
| Construction of Multi-Purpose, Sitio Malaiba, Barangay Natumulan, Tagoloan, Misamis Oriental | Added by the House | — | ₱15,000,000 | HB p. 877 |
| Construction of Multi-Purpose Building, Barangay Tabok, Opol, Misamis Oriental | Added by the House | — | ₱15,000,000 | HB p. 877 |
| Construction of Multi-Purpose Building, Barangay Poblacion, Naawan, Misamis OrientalMatched to the NEP by a close title, not an exact one. | Reduced | ₱20,000,000 | ₱6,000,000 | HB p. 878 NEP PDF p. 664 (scan reading; check the page) |
| Butuan City-Cagayan de Oro City-Iligan City Rd., K1455 + 417 - K1456 + 243 (Road Safety: Road Lighting) | Added by the House | — | ₱10,000,000 | HB p. 238 |
| Butuan City-Cagayan de Oro City-Iligan City Rd., K1454+984 - K1455+386, (Road Safety: Roadway Lighting) | Added by the House | — | ₱10,000,000 | HB p. 238 |
| Construction of Multi-Purpose Building, Barangay Mat-I, Naawan, Misamis Oriental | Added by the House | — | ₱6,000,000 | HB p. 877 |
| Construction of Multi-Purpose Building, Covered Court, Barangay Rizal, Claveria, Misamis Oriental | Added by the House | — | ₱6,000,000 | HB p. 878 |
| Construction of Multi-Purpose Building, Poblacion, El Salvador City, Misamis Oriental | Added by the House | — | ₱6,000,000 | HB p. 878 |
| Construction of Multi-Purpose Building, Purok 8, Barangay Poblacion, El Salvador City, Misamis Oriental | Added by the House | — | ₱6,000,000 | HB p. 878 |
| Gingoog-Claveria-Villanueva Rd., K1374+544 - K1376+000 | Increased | ₱34,155,000 | ₱39,954,000 | HB p. 202 NEP PDF p. 273 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Sungay, Alubijid, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Taparak, Alubijid, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building, Barangay Kalabaylabay, El Salvador City, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Sambulawan, El Salvador City, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Kanitoan, Initao, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Mat-I, Naawan, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Ane-I, Claveria, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court) at Centro, Barangay Bulahan, Claveria, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Pelaez, Claveria, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court) at Barangay Balacanas, Villanueva, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Multi-Purpose Building (Covered Court), Barangay Hinigdaan, El Salvador City, Misamis Oriental | Added by the House | — | ₱5,272,000 | HB p. 877 |
| Construction of Water System, Barangay, Upper Malubog, Manticao, Misamis Oriental | Added by the House | — | ₱5,000,000 | HB p. 386 |
| Construction of Road, Barangay San Pedro, Initao, Misamis Oriental | Added by the House | — | ₱5,000,000 | HB p. 608 |
| Construction of Road with Canal, Barangay Linangkayan, Naawan, Misamis Oriental | Added by the House | — | ₱5,000,000 | HB p. 608 |
| Construction of 3 Storey Multi-Purpose Buildingof MSU-IIT National Multi-Purpose Cooperative, Barangay Poblacion, Manticao, Misamis Oriental | Added by the House | — | ₱5,000,000 | HB p. 877 |
| Construction of Multi-Purpose Building, Aposkahoy, Claveria, Misamis Oriental | Added by the House | — | ₱5,000,000 | HB p. 878 |
Past DPWH contracts under this office
1,140 contracts from 2016 to 2025 in public DPWH records (₱19.68B): 996 recorded as completed, 119 as ongoing. 1,071 have a satellite image check on file. Browse them.
10 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Phase 2, Tagoloan, Misamis Oriental 24KL0065 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge (Package 2), Tagoloan, Misamis Oriental 24KL0012 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure along Solana River (Upstream of Solana Bridge), Phase 2, Jasaan, Misamis Oriental 24KL0070 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge, Tagoloan, Misamis Oriental 24KL0011 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Phase 3, Tagoloan, Misamis Oriental 24KL0066 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure along Solana River (Downstream of Solana Bridge), Phase 2, Jasaan, Misamis Oriental 24KL0069 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure along Solana River (Upstream of Solana Bridge), Jasaan, Misamis Oriental 23KL0067 · Completed · ₱77.2MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Tagoloan, Misamis Oriental 23KL0074 · Completed · ₱77.2MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure along Solana River (Downstream of Solana Bridge), Jasaan, Misamis Oriental 23KL0075 · Completed · ₱77.2MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Manticao River (Downstream of Manticao Bridge), Manticao, Misamis Oriental 23KL0072 · Completed · ₱5.0MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
