← All districts

Write your representative · FY2027 budget

Navotas City (Lone District)

Representative: Tobias "Toby" M. Tiangco · bills and roles · official House profile

Served by: Malabon-Navotas DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 19 lines selected.

Hon. Tobias "Toby" M. Tiangco
Representative, Navotas City (Lone District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Navotas City (Lone District)

Dear Representative Tobias "Toby" M. Tiangco:

Good day. I live in Navotas City (Lone District), and I would like to ask about some DPWH lines for the Malabon-Navotas DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Box Culvert, A. Leongson St. (C 0 + 000 - C 0 + 580), Barangay San Roque, Navotas City (Malabon-Navotas DEO): not in the NEP; ₱47,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 313; no matching NEP line for this office]
2. Construction of Maliputo Pumping Station, Navotas City (14.653007, 120.955256) (Malabon-Navotas DEO): not in the NEP; ₱42,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 312; no matching NEP line for this office]
3. Construction of Kanduli 2 Pumping Station, Navotas City (14.643839, 120.960634) (Malabon-Navotas DEO): not in the NEP; ₱42,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 312; no matching NEP line for this office]
4. Construction of Babanse 1 Pumping Station, Navotas City (14.646021, 120.957802) (Malabon-Navotas DEO): not in the NEP; ₱42,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 313; no matching NEP line for this office]
5. Construction of Babanse 2 Pumping Station, Navotas City (14.643354, 120.960208) (Malabon-Navotas DEO): not in the NEP; ₱42,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 313; no matching NEP line for this office]
6. Construction of C-4 Pumping Station, Navotas City (14.652362, 120.951739) (Malabon-Navotas DEO): not in the NEP; ₱42,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 313; no matching NEP line for this office]
7. Construction of Mamale 1 Pumping Station, Navotas City (14.650293, 120.954643) (Malabon-Navotas DEO): not in the NEP; ₱42,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 313; no matching NEP line for this office]
8. Construction of Badeo Dos Pumping Station, Navotas City (14.663345, 120.947718) (Malabon-Navotas DEO): not in the NEP; ₱42,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 313; no matching NEP line for this office]
9. Construction of Box Culvert along Tanza Pabahay (C 0 + 000 - C 0 + 334), Navotas City (Malabon-Navotas DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 312; no matching NEP line for this office]
10. Construction of Retaining Wall (C 0 + 000 - C 0 + 108), Barangay Tanza, Navotas City (Malabon-Navotas DEO): not in the NEP; ₱35,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 313; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Malabon-Navotas DEO: 975 contracts (2016–2025) in public DPWH records; 838 recorded as completed and 112 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Riverwall (Phase 2), Barangay Dampalit, Malabon City (22OA0047): Awards Very Close to the Budget Ceiling; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/42beb6bc-a8db-446e-b88f-1a90a60dadfb
- Construction of Riverwall along Tanza Dike (Phase 2), Barangay Tanza 1, Navotas City (22OA0051): Awards Very Close to the Budget Ceiling; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/f26f0cfb-5971-43f4-ba52-8c7b4857a229
- Construction of Floodwall along Chungkang River (Phase 2), Navotas City (22OA0069): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/9df6eb1f-0fe9-42a6-8921-e6e9d1e8a2f7
- Construction of Riverwall (Phase 1), Barangay Dampalit, Malabon City (22OA0042): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/d5d8ad0d-082b-4507-9719-580cb8a42a26
- Construction of Riverwall along Muzon River, Baranrangay Muzon, Malabon City (22OA0071): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/8740375e-bfb5-4fd7-9b41-48c85896538f

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/navotas-city-lone

Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.

Malabon-Navotas DEO

This district engineering office also serves Malabon City (Lone District). The budget lines below belong to the office, not to one district.

House version (HB 10858)
₱1.11B
34 lines
President’s NEP
₱778.7M
25 lines
Added by the House
14
₱497.0M
Changed / removed
0 / 5
20 lines unchanged
Lines that differ from the NEP (14)
LineChangeNEPHouseSources
Construction of Box Culvert, A. Leongson St. (C 0 + 000 - C 0 + 580), Barangay San Roque, Navotas CityAdded by the House—₱47,000,000HB p. 313
Construction of Maliputo Pumping Station, Navotas City (14.653007, 120.955256)Added by the House—₱42,000,000HB p. 312
Construction of Kanduli 2 Pumping Station, Navotas City (14.643839, 120.960634)Added by the House—₱42,000,000HB p. 312
Construction of Babanse 1 Pumping Station, Navotas City (14.646021, 120.957802)Added by the House—₱42,000,000HB p. 313
Construction of Babanse 2 Pumping Station, Navotas City (14.643354, 120.960208)Added by the House—₱42,000,000HB p. 313
Construction of C-4 Pumping Station, Navotas City (14.652362, 120.951739)Added by the House—₱42,000,000HB p. 313
Construction of Mamale 1 Pumping Station, Navotas City (14.650293, 120.954643)Added by the House—₱42,000,000HB p. 313
Construction of Badeo Dos Pumping Station, Navotas City (14.663345, 120.947718)Added by the House—₱42,000,000HB p. 313
Construction of Box Culvert along Tanza Pabahay (C 0 + 000 - C 0 + 334), Navotas CityAdded by the House—₱40,000,000HB p. 312
Construction of Retaining Wall (C 0 + 000 - C 0 + 108), Barangay Tanza, Navotas CityAdded by the House—₱35,000,000HB p. 313
Construction of Drainage System along Martiniko St. (C 0 + 000 - C 0 + 184), Barangay NBBS, Dagat-Dagatan, Navotas CityAdded by the House—₱30,000,000HB p. 313
Construction of 3-Storey Multi-Purpose Building, Pampano corner Maya-Maya Streets, Barangay Longos, Malabon, 14.65, 120.96Added by the House—₱25,000,000HB p. 648
Construction of Box Culvert, Los Martirez St. (C 0 + 000 - C 0 + 248), Barangay San Jose, Navotas CityAdded by the House—₱18,000,000HB p. 313
Construction of Box Culvert, Badeo 5 (C 0 + 000 - C 0 + 121), Barangay San Roque, Navotas CityAdded by the House—₱8,000,000HB p. 313
NEP lines with no match in the House version (5)
  • Construction of Drainage System along Tioco St . (C 0 + 000 - C 0 + 655 ), Barangay Bangkulasi, Navotas City · ₱50,000,000 · NEP PDF p. 365
  • Rehabilitation of Navotas Coastal Dike From Sta. 3 + 070.0 to Sta. 3 + 190.0, Barangay Tangos North, Navotas City · ₱46,980,000 · NEP PDF p. 365
  • Construction of Luna Pumping Station, Navotas City (14.650965, 120.953393) · ₱42,000,000 · NEP PDF p. 365
  • Construction of Box Culvert Lined Canal, C-3 Road (S02120LZ ) (R-10 Road to C-3 Bridge ), Navotas City · ₱20,000,000 · NEP PDF p. 365
  • C-3 Road · ₱5,589,000 · NEP PDF p. 134

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

975 contracts from 2016 to 2025 in public DPWH records (₱23.59B): 838 recorded as completed, 112 as ongoing. 932 have a satellite image check on file. Browse them.

30 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.