Hon. Emerson D. Pascual Representative, Nueva Ecija (Fourth District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Nueva Ecija (Fourth District) Dear Representative Emerson D. Pascual: Good day. I live in Nueva Ecija (Fourth District), and I would like to ask about some DPWH lines for the Nueva Ecija 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Drainage Structure, Barangay San Vicente, Gapan City, Nueva Ecija (Nueva Ecija 2nd DEO): not in the NEP; ₱14,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 333; no matching NEP line for this office] 2. Construction of Drainage Structure, Barangay San Lorenzo, Gapan City, Nueva Ecija (Nueva Ecija 2nd DEO): not in the NEP; ₱12,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 364; no matching NEP line for this office] 3. Construction of Multi-Purpose Building, Barangay Balante, Gapan City, Nueva Ecija (Nueva Ecija 2nd DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 732; no matching NEP line for this office] 4. Construction of Multi-Purpose Building, Barangay Nieves, San Leonardo, Nueva Ecija (Nueva Ecija 2nd DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 732; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Nueva Ecija 2nd DEO: 1,607 contracts (2016–2025) in public DPWH records; 1,525 recorded as completed and 63 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Rehabilitation of Flood Control Structure along Pampanga River, Brgy. Santa Isabel, Cabiao, Nueva Ecija (23CF0044): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/42ad4e3f-a2cd-4f9f-8fe1-a762c5aa4be2 - Construction of Flood Mitigation Structure along Peñaranda River, Barangay San Vicente, Gapan City, Nueva Ecija (24CF0021): Schedule / Date Inconsistencies; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/e9b79be0-0117-4fc3-b865-1695d35bf6bf - Construction of Flood Mitigation Structure along Peñaranda River, Brgy. San Vicente, Gapan City, Nueva Ecija (23CF0065): Duplicate or Near-Duplicate Projects; Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/8f91a85b-d7c9-433c-814d-a25e42e42894 - Construction of Flood Mitigation Structure along Peñaranda River, Barangay Pambuan, Gapan City, Nueva Ecija (23CF0075): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/a457b648-f727-44fc-a878-22fb500362af - Construction of Flood Mitigation Structure along Peñaranda River, Barangay Sto. Niño, Gapan City, Nueva Ecija (23CF0059): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/137b5b3a-17ab-4b93-8a06-99ea144dba6a I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/nueva-ecija-4th
Write your representative · FY2027 budget
Nueva Ecija (Fourth District)
Representative: Emerson D. Pascual · bills and roles · official House profile
Served by: Nueva Ecija 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
4 of 11 lines selected.
Nueva Ecija 2nd DEO
This district engineering office also serves Nueva Ecija (Third District). The budget lines below belong to the office, not to one district.
- House version (HB 10858)
- ₱253.8M
- 14 lines
- President’s NEP
- ₱320.0M
- 17 lines
- Added by the House
- 4
- ₱46.0M
- Changed / removed
- 0 / 7
- 10 lines unchanged
Lines that differ from the NEP (4)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Drainage Structure, Barangay San Vicente, Gapan City, Nueva Ecija | Added by the House | — | ₱14,000,000 | HB p. 333 |
| Construction of Drainage Structure, Barangay San Lorenzo, Gapan City, Nueva Ecija | Added by the House | — | ₱12,000,000 | HB p. 364 |
| Construction of Multi-Purpose Building, Barangay Balante, Gapan City, Nueva Ecija | Added by the House | — | ₱10,000,000 | HB p. 732 |
| Construction of Multi-Purpose Building, Barangay Nieves, San Leonardo, Nueva Ecija | Added by the House | — | ₱10,000,000 | HB p. 732 |
NEP lines with no match in the House version (7)
- Construction of Multi-Purpose Building (Gym) at DPWH Nueva Ecija 2nd District Engineering Office, Barangay San Isidro, Cabanatuan City, Nueva Ecija · ₱50,000,000 · NEP PDF p. 684
- Rehabilitation of Barangay Road, Barangay San Mariano, Sta. 0 + 000 - Sta. 0 + 800, San Antonio, Nueva Ecija · ₱14,000,000 · NEP PDF p. 498
- Construction of Drainage, Barangay Maugat, Sta. 0 + 000 - Sta. 0 + 800, San Antonio, Nueva Ecija · ₱12,000,000 · NEP PDF p. 402
- Gapan City, Nueva Ecija · ₱10,410,000 · NEP PDF p. 134
- Rehabilitation of Barangay Road, Barangay Maugat, Sta. 0 + 000 - Sta. 0 + 800, San Antonio, Nueva Ecija · ₱10,000,000 · NEP PDF p. 498
- Construction of Multi-Purpose Building, Barangay San Bartolome, San Leonardo, Nueva Ecija · ₱10,000,000 · NEP PDF p. 603
- Cabanatuan City · ₱5,801,000 · NEP PDF p. 134
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,607 contracts from 2016 to 2025 in public DPWH records (₱31.41B): 1,525 recorded as completed, 63 as ongoing. 1,468 have a satellite image check on file. Browse them.
27 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Rehabilitation of Flood Control Structure along Pampanga River, Brgy. Santa Isabel, Cabiao, Nueva Ecija 23CF0044 · Completed · ₱65.3MAwards Very Close to the Budget Ceiling
- Construction of Flood Mitigation Structure along Peñaranda River, Barangay San Vicente, Gapan City, Nueva Ecija 24CF0021 · Completed · ₱144.7MSchedule / Date Inconsistencies; Duplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Mitigation Structure along Peñaranda River, Brgy. San Vicente, Gapan City, Nueva Ecija 23CF0065 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects; Schedule / Date Inconsistencies · satellite before / after
- Construction of Flood Mitigation Structure along Peñaranda River, Barangay Pambuan, Gapan City, Nueva Ecija 23CF0075 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Mitigation Structure along Peñaranda River, Barangay Sto. Niño, Gapan City, Nueva Ecija 23CF0059 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure along Peñaranda River, Barangay Santo Niño, Gapan City, Nueva Ecija 24CF0025 · Completed · ₱96.5MSchedule / Date Inconsistencies; Duplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure along Peñaranda River, Barangay San Nicolas, Gapan City, Nueva Ecija 23CF0091 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Mitigation Structure along Pampanga River, Barangay Pagas, Cabanatuan City, Nueva Ecija 25CF0012 · Completed · ₱95.1MDuplicate or Near-Duplicate Projects; Schedule / Date Inconsistencies · satellite before / after
- Construction of Flood Control Structure along Peñaranda River, Barangay San Nicolas, Gapan City, Nueva Ecija 24CF0026 · Completed · ₱94.6MSchedule / Date Inconsistencies; Duplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Mitigation Structure along Peñaranda River, Barangay Pambuan, Gapan City, Nueva Ecija 24CF0011 · Completed · ₱94.6MSchedule / Date Inconsistencies; Duplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control Structure (Gabion) at Pampanga River, Barangay Bugnan, Gabaldon, Nueva Ecija 23CF0042 · Completed · ₱88.4MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Mitigation Structure along Pampanga River, Barangay Pagas, Cabanatuan City, Nueva Ecija 24CF0002 · Completed · ₱86.8MDuplicate or Near-Duplicate Projects · satellite before / after
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.