Hon. Stephen James T. Tan Representative, Samar (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Samar (First District) Dear Representative Stephen James T. Tan: Good day. I live in Samar (First District), and I would like to ask about some DPWH lines for the Samar 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Access Road leading to Buray Bagsakan and Buray Terminal, Buray, Paranas, Samar, 11.770044, 125.039969 (Samar 1st DEO): not in the NEP; ₱22,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 590; no matching NEP line for this office] 2. Construction of Road, Barangay Cag-anibong, Sta. 0+000 - Sta. 0+350.69, Calbayog City, Samar (Samar 1st DEO): not in the NEP; ₱7,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 590; no matching NEP line for this office] 3. Construction of Drainage System, Barangay de Victoria, Calbayog City (Samar 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 350; no matching NEP line for this office] 4. Construction of Drainage System, Barangay Amampacang, Sta. 0+000 - Sta. 0+222.56, Calbayog City, Samar (Samar 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 350; no matching NEP line for this office] 5. Construction of Road, Barangay Lonoy, Sta. 0+000 - Sta. 0+220.69, Calbayog City, Samar (Samar 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 590; no matching NEP line for this office] 6. Construction of Road in Barangay Catabunan, Calbayog City (Samar 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 591; no matching NEP line for this office] 7. Construction of Road in Barangay Mabini 2, Calbayog City (Samar 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 591; no matching NEP line for this office] 8. Construction of Road in Barangay Rizal 2, Calbayog City (Samar 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 591; no matching NEP line for this office] 9. Construction of Road in Barangay Cangomaod, Calbayog City (Samar 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 591; no matching NEP line for this office] 10. Construction of Road in Barangay San Rufino, Calbayog City (Samar 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 591; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Samar 1st DEO: 1,168 contracts (2016–2025) in public DPWH records; 1,039 recorded as completed and 85 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Structure along Barruz River, Brgy. Barruz, Matuguinao, Samar (22IJ0051): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/7990ea2c-564d-45f5-8bcf-373798377550 - Construction of Flood Control Structure along Kinawan River (Upstream), Brgy. San Joaquin, Calbayog City, Samar (22IJ0031): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/5470586d-930a-42c2-8162-c85c9de30c5c - Construction of Flood Control Structures along Tabawan Creek (Phase II), Brgy. Tabawan, Calbayog City, Samar (22IJ0043): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/473d873f-07e2-492c-8ac8-ee2d2fa61f04 - Construction of Flood Control Structure, Brgy. Macatingog, Calbayog City, Samar (22IJ0047): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/5a4eb5b6-c764-437b-846c-aefc5aca6ebe - Construction of Flood Control Structure along Jibatang River, Brgy. Nabang, Calbayog City, Samar (22IJ0030): Pattern Consistent with Contract Splitting; Cross-Source Mismatch (PhilGEPS vs DPWH). https://lovethephilippines.com/projects/0ec526c3-32f4-41f4-a47e-ff5d16ef797c I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/samar-1st
Write your representative · FY2027 budget
Samar (First District)
Representative: Stephen James T. Tan · bills and roles · official House profile
Served by: Samar 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 19 lines selected.
Samar 1st DEO
- House version (HB 10858)
- ₱669.8M
- 81 lines
- President’s NEP
- ₱605.8M
- 64 lines
- Added by the House
- 18
- ₱109.0M
- Changed / removed
- 0 / 1
- 63 lines unchanged
Lines that differ from the NEP (18)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Access Road leading to Buray Bagsakan and Buray Terminal, Buray, Paranas, Samar, 11.770044, 125.039969 | Added by the House | — | ₱22,000,000 | HB p. 590 |
| Construction of Road, Barangay Cag-anibong, Sta. 0+000 - Sta. 0+350.69, Calbayog City, Samar | Added by the House | — | ₱7,000,000 | HB p. 590 |
| Construction of Drainage System, Barangay de Victoria, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 350 |
| Construction of Drainage System, Barangay Amampacang, Sta. 0+000 - Sta. 0+222.56, Calbayog City, Samar | Added by the House | — | ₱5,000,000 | HB p. 350 |
| Construction of Road, Barangay Lonoy, Sta. 0+000 - Sta. 0+220.69, Calbayog City, Samar | Added by the House | — | ₱5,000,000 | HB p. 590 |
| Construction of Road in Barangay Catabunan, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 591 |
| Construction of Road in Barangay Mabini 2, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 591 |
| Construction of Road in Barangay Rizal 2, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 591 |
| Construction of Road in Barangay Cangomaod, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 591 |
| Construction of Road in Barangay San Rufino, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 591 |
| Construction of Multi-Purpose Building in Barangay Obrero, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 854 |
| Construction of Multi-Purpose Building, Barangay Matobato, Calbayog City, Samar (124.577359, 12.070494) | Added by the House | — | ₱5,000,000 | HB p. 854 |
| Construction of Multi-Purpose Building, Barangay Mag-ubay, Calbayog City, Samar (124.567599, 12.159034) | Added by the House | — | ₱5,000,000 | HB p. 854 |
| Construction of Multi-Purpose Building, Barangay Roxas 1, Calbayog City, Samar (124.597820, 12.134851) | Added by the House | — | ₱5,000,000 | HB p. 854 |
| Construction of Multi-Purpose Building in Barangay Awang East, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 854 |
| Construction of Multi-Purpose Building in Barangay Quezon, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 854 |
| Construction of Multi-Purpose Building in Barangay San Isidro, Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 854 |
| Construction of Multi-Purpose Building in Barangay Roxas 2 Calbayog City | Added by the House | — | ₱5,000,000 | HB p. 854 |
NEP lines with no match in the House version (1)
- Replacement of Palambrag Bridge, Sta. 777 + 356 - Sta. 777 + 392, Barangay Hampton, Gandara, Samar · ₱45,000,000 · NEP PDF p. 544
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,168 contracts from 2016 to 2025 in public DPWH records (₱29.00B): 1,039 recorded as completed, 85 as ongoing. 1,076 have a satellite image check on file. Browse them.
8 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Structure along Barruz River, Brgy. Barruz, Matuguinao, Samar 22IJ0051 · Completed · ₱48.9MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure along Kinawan River (Upstream), Brgy. San Joaquin, Calbayog City, Samar 22IJ0031 · Completed · ₱48.7MPattern Consistent with Contract Splitting
- Construction of Flood Control Structures along Tabawan Creek (Phase II), Brgy. Tabawan, Calbayog City, Samar 22IJ0043 · Completed · ₱48.6MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Brgy. Macatingog, Calbayog City, Samar 22IJ0047 · Completed · ₱48.1MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure along Jibatang River, Brgy. Nabang, Calbayog City, Samar 22IJ0030 · Completed · ₱43.6MPattern Consistent with Contract Splitting; Cross-Source Mismatch (PhilGEPS vs DPWH)
- Construction of Flood Control Structure along Gandara River, Barangay Mabuligon, Matuguinao, Samar 24IJ0011 · Completed · ₱49.0MSchedule / Date Inconsistencies
- Rehabilitation of Flood Control Structure along Gandara River, Brgy. Burabod II and Brgy. Dumaloong, Gandara, Samar 22IJ0084 · Completed · ₱38.9MDuplicate or Near-Duplicate Projects
- Rehabilitation of Flood Control Structure along Gandara River, Brgy. Burabod II, Gandara, Samar 22IJ0090 · Completed · ₱28.7MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.