Barangay
Banoen
Banoen, Quirino, Ilocos Sur, Region I (Ilocos Region). Rural. Population 644 (2024 POPCEN).
PSGC 0102915001 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Banoen
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
Not yet linked to Banoen itself. This shows the municipality figure for Quirino.
62 records · ₱2,791,912,972.15
1 placed at Quirino level itself; the rest in LGUs under it.
- Construction/Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers, Construction of Flood Control Structure Along Abra River, Upstream and Downstream of Quirino Bridge, Quirino, Ilocos Sur (Phase 2)₱157,294,846.25 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure Along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1)₱157,294,568.60 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Missing Links/ New Roads, Cervantes (Ilocos Sur) - Besao-Sagada Via Laylaya Road, Ilocos Sur (Package 4)₱154,399,997.02 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Missing Links/New Roads, Cervantes-Quirino (Ilocos Sur)-Abra Road, Ilocos Sur (Package 4)₱154,399,979.08 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction/Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers - Construction of Flood Control Structure Along Abra River, Downstream of Quirino Bridge, Quirino, Ilocos Sur₱145,124,993.87 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction/Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers - Construction of Flood Control Structure Along Abra River, Upstream of Quirino Bridge, Quirino, Ilocos Sur₱145,121,723.34 · 2025 · medium confidence (project coordinates inside the barangay boundary)
How linked: 61 by project coordinates inside the barangay boundary; 1 by project title names the place.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Banoen itself. This shows the municipality figure for Quirino.
1 record · ₱1,119,123,063.38
- Municipality of Quirino, Ilocos Sur₱1,119,123,063.38 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Banoen itself. This shows the province figure for Ilocos Sur.
69,049 records · ₱162,446,126,088.41
68,983 placed at Ilocos Sur level itself; the rest in LGUs under it.
- Ilocos Sur₱162,446,126,088.41 · 68,983 awards · high confidence (area of delivery is this province only)
- Ilocos Norte, Ilocos Sur, La Union, Pangasinan₱32,735,719.44 · 12 awards · low confidence (area of delivery lists several provinces)
- Ilocos Sur, Iloilo₱12,748,302.60 · 11 awards · low confidence (area of delivery lists several provinces)
- Benguet, Ilocos Norte, Ilocos Sur, La Union, Pangasinan₱10,270,956.00 · 6 awards · low confidence (area of delivery lists several provinces)
- Ilocos Sur, Lanao del Sur₱9,404,796.83 · 1 awards · low confidence (area of delivery lists several provinces)
- Benguet, Ilocos Norte, Ilocos Sur, La Union, Mountain Province, Pangasinan₱9,311,352.00 · 6 awards · low confidence (area of delivery lists several provinces)
How linked: 68,983 by area of delivery is this province only; 66 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Banoen itself. This shows the municipality figure for Quirino.
17 records · ₱62,500,646.48
5 placed at Quirino level itself; the rest in LGUs under it.
- Improvement of Eco-Tourism Park (Quirino Skyline) at Barangay Cayus₱10,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Construction of Level Iii Potable Water System at Barangay Patungcaleo₱6,606,882.16 · 2023 · high confidence (location columns in the DBM release)
- Opening With Concreting of Road₱6,500,000.00 · 2026 · high confidence (location columns in the DBM release)
- Construction of One-Storey School Building₱6,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Rehabilitation of Farm-to-Market Road₱4,000,000.00 · 2026 · high confidence (location columns in the DBM release)
How linked: 17 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
Not yet linked to Banoen itself. This shows the municipality figure for Quirino.
24 records · ₱713,786,000.00
23 placed at Quirino level itself; the rest in LGUs under it.
- Construction of Flood Control Structure Along Abra River, Downstream of Quirino Bridge, Quirino, Ilocos Sur₱155,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Construction of Flood Control Structure Along Abra River, Upstream of Quirino Bridge, Quirino, Ilocos Sur₱155,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Cervantes (Ilocos Sur) - Besao-Sagada Via Laylaya Road, Barangay. Patiacan Section, Sta. 9 + 900 - Sta. 14 + 760, Quirino, Ilocos Sur₱72,505,000.00 · 2026 · high confidence (GAA line text names the place)
- Tagongtungaw-Bab-Asig-Poblacion Road Connecting Cervantes-Tubo, Abra National Road in Support to the Fruit and Vegetable Processing and Quirino Coffee Processing Industry, Quirino, Ilocos Sur₱57,700,000.00 · 2020 · high confidence (GAA line text names the place)
- Construction of Barangay Road Poblacion Spillway, Quirino, Ilocos Sur₱40,000,000.00 · 2018 · high confidence (GAA line text names the place)
- Construction of Flood Control Structures Along Abra River (Quirino Section), Quirino, Ilocos Sur₱25,000,000.00 · 2018 · high confidence (GAA line text names the place)
How linked: 24 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Banoen itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Quirino.
- Duplicate or Near-Duplicate ProjectsConstruction of Quirino Flood Control, Quirino, Ilocos SurContractor: Nabanew Const and Supply
- Duplicate or Near-Duplicate ProjectsConstruction of Quirino Flood Control, Quirino, Ilocos SurContractor: Nabanew Const and Supply
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- High Concurrent Workload for One ContractorMg Samidan ConstContractor: Mg Samidan Const
- High Concurrent Workload for One ContractorSt Timothy Const CorpContractor: St Timothy Const Corp
Contractors on linked DPWH projects
None linked to Banoen itself; showing Quirino.
- A I P CONST30 projects · ₱2,279,620,411.70
- ST TIMOTHY CONST CORP1 project · ₱99,000,000.00
- EJIEV CONST SERVICES10 projects · ₱93,932,192.41
- MG SAMIDAN CONST1 project · ₱91,670,204.43
- FIRST NORTHWAY DEVELOPMENT3 projects · ₱73,423,927.94
- NABANEW CONST AND SUPPLY4 projects · ₱50,577,225.91
- ARTHIT CORP2 projects · ₱37,253,596.26
- 739 BUILDERS2 projects · ₱25,785,434.79
- NORIQUI CONST3 projects · ₱14,901,491.73
- TANDAGAN CONST2 projects · ₱10,540,997.21

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Banoen
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.