Municipality
Kabasalan
Kabasalan, Zamboanga Sibugay, Region IX (Zamboanga Peninsula). 1st income class. Population 48,366 (2024 POPCEN).
Data-quality note: 4 DPWH projects linked to Kabasalan have no coordinates published by DPWH, so they are not on the map and cannot be checked with satellite images.
PSGC 0908306000 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Kabasalan
Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
126 records · ₱3,857,332,895.03
4 placed at Kabasalan level itself; the rest in LGUs under it.
- Sipag - Access Roads and/Or Bridges From the National Road/S Leading to Major/Strategic Public Buildings/Facilities - Construction of Road, Salug - Godod - Kabasalan Road, Zamboanga Sibugay₱159,083,879.21 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Sipag - Access Roads and/Or Bridges From the National Road/S Leading to Major/Strategic Public Buildings/Facilities - Construction of Road, Kabasalan (Buayan-Lacnapan), Godod Road, Zamboanga Sibugay₱154,215,799.17 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction / Rehabilitation of Floodmitigation Facilities Within Major River Basinsand Principal Rivers - Construction of Floodcontrol Structure Along Kabasalan River,Phase V, Package 3, Barangay F.L. Pena,Kabasalan, Zamboanga Sibugay₱141,608,151.40 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction / Rehabilitation of Floodmitigation Facilities Within Major River Basinsand Principal Rivers - Construction of Floodcontrol Structure Along Kabasalan River,Phase V, Package 4, Barangay F.L. Pena,Kabasalan, Zamboanga Sibugay₱141,503,652.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction / Rehabilitation of Floodmitigation Facilities Within Major River Basinsand Principal Rivers - Construction of Floodcontrol Structure Along Kabasalan River,Phase V, Package 2, Barangay F.L. Pena,Kabasalan, Zamboanga Sibugay₱140,712,719.80 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction / Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers - Construction of Flood Control Structure Along Kabasalan River (Upstream), Barangay Banker, Kabasalan, Zamboanga Sibugay₱114,992,361.95 · 2023 · medium confidence (project coordinates inside the barangay boundary)
How linked: 122 by project coordinates inside the barangay boundary; 4 by project title names the place.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
2 records · ₱750,968,800.15
1 placed at Kabasalan level itself; the rest in LGUs under it.
- Municipality of Kabasalan, Zamboanga Sibugay₱750,746,438.25 · high confidence (the LGU itself is the buyer)
- Barangay Poblacion, Kabasalan, Zamboanga Sibugay₱222,361.90 · high confidence (the LGU itself is the buyer)
How linked: 2 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Kabasalan itself. This shows the province figure for Zamboanga Sibugay.
23,420 records · ₱52,342,997,195.22
23,407 placed at Zamboanga Sibugay level itself; the rest in LGUs under it.
- Zamboanga Sibugay₱52,342,997,195.22 · 23,407 awards · high confidence (area of delivery is this province only)
- Basilan, Isabela, Sulu, Tawi-Tawi, Zamboanga del Norte, Zamboanga del Sur, Zamboanga Sibugay₱38,348,411.40 · 1 awards · low confidence (area of delivery lists several provinces)
- Zamboanga del Sur, Zamboanga Sibugay₱30,455,583.00 · 3 awards · low confidence (area of delivery lists several provinces)
- Basilan, Sulu, Zamboanga del Norte, Zamboanga del Sur, Zamboanga Sibugay₱8,051,535.72 · 1 awards · low confidence (area of delivery lists several provinces)
- Zamboanga del Norte, Zamboanga del Sur, Zamboanga Sibugay₱1,107,095.00 · 3 awards · low confidence (area of delivery lists several provinces)
- Zamboanga del Norte, Zamboanga Sibugay₱77,000.00 · 1 awards · low confidence (area of delivery lists several provinces)
How linked: 23,407 by area of delivery is this province only; 13 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
32 records · ₱38,021,882.16
2 placed at Kabasalan level itself; the rest in LGUs under it.
- Construction of School Building₱6,606,882.16 · 2023 · high confidence (location columns in the DBM release)
- Provision of Agricultural Support Services, Including Planting Materials Distribution System and Operation of Farm Produce Collection and Buying Stations₱5,000,000.00 · 2025 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Barangay Sayao Road Section₱3,500,000.00 · 2022 · high confidence (location columns in the DBM release)
- Construction of School Building₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
- Construction of Health Station₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
How linked: 32 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
77 records · ₱2,089,899,000.00
45 placed at Kabasalan level itself; the rest in LGUs under it.
- Construction of Flood Control Structure Along Kabasalan River, Phase V, Package 3, Barangay F.L. Pena, Kabasalan, Zamboanga Sibugay₱152,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Construction of Flood Control Structure Along Kabasalan River, Phase V, Package 4, Barangay F.L. Pena, Kabasalan, Zamboanga Sibugay₱152,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Construction of Flood Control Structure Along Kabasalan River, Phase V, Package 2, Barangay F.L. Pena, Kabasalan, Zamboanga Sibugay₱151,130,000.00 · 2025 · high confidence (GAA line text names the place)
- Construction of Flood Conctrol Structure Along Kabasalan River (Downstream), Barangay Banker, Kabasalan, Zamboanga Sibugay₱120,000,000.00 · 2023 · medium confidence (GAA line text names the place)
- Construction of Flood Control Along Kabasalan River (Phase Ii), Fl Pena, Kabasalan, Zamboanga Sibugay₱120,000,000.00 · 2021 · high confidence (GAA line text names the place)
- Construction of Flood Control Structure Along Kabasalan River (Upstream), Barangay Banker, Kabasalan, Zamboanga Sibugay₱120,000,000.00 · 2023 · medium confidence (GAA line text names the place)
How linked: 77 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Badsbro Const and Gen MerchandiseContractor: Badsbro Const and Gen Merchandise
- Contractor Concentration (Flood Control)Alpha & Omega Gen Contractor & Development CorpContractor: Alpha & Omega Gen Contractor & Development Corp
- Contractor Concentration (Flood Control)Alpha & Omega Gen Contractor & Development CorpContractor: Alpha & Omega Gen Contractor & Development Corp
- Contractor Concentration (Flood Control)Legacy Const Corp Formerly: Legacy ConstContractor: Legacy Const Corp Formerly: Legacy Const
- High Concurrent Workload for One ContractorAlpha & Omega Gen Contractor & Development CorpContractor: Alpha & Omega Gen Contractor & Development Corp
- High Concurrent Workload for One ContractorLegacy Const Corp Formerly: Legacy ConstContractor: Legacy Const Corp Formerly: Legacy Const
Contractors on linked DPWH projects
All 29 contractors on DPWH projects linked to Kabasalan and the LGUs under it. Click a column to sort.
| Barillo Const And Ent | 28 | ₱953,727,366.72 | 0 |
| 2m Const | 11 | ₱852,040,792.40 | 0 |
| Esr Const And Development CORP Formerly: Esr Const | 7 | ₱828,704,627.33 | 0 |
| Rudhil Const | 10 | ₱302,040,193.23 | 0 |
| Rcdg Const CORP | 3 | ₱178,248,482.29 | 0 |
| Alpha & Omega Gen Contractor & Development CORP | 1 | ₱114,564,540.70 | 3 |
| Badsbro Const And Gen Merchandise | 1 | ₱107,231,489.00 | 1 |
| Alpha | 1 | ₱104,983,539.67 | 0 |
| Legacy Const CORP Formerly: Legacy Const | 1 | ₱86,793,300.50 | 2 |
| Lakewood Const CO | 7 | ₱53,944,512.34 | 0 |
| Belvic Ent & Const / Ffjj Const | 1 | ₱38,178,711.63 | 0 |
| A C O Const | 1 | ₱31,936,000.00 | 0 |
| Debris Ent And Const | 4 | ₱29,696,230.49 | 0 |
| M S D L R Const | 4 | ₱23,189,173.97 | 0 |
| Stone Throw Const | 6 | ₱23,099,732.32 | 0 |
| St Joseph Const And Trading | 7 | ₱22,416,199.25 | 0 |
| Gjd Const | 10 | ₱21,645,842.00 | 0 |
| Albe Const & Ent | 1 | ₱14,816,160.07 | 0 |
| Jgc Construction | 5 | ₱14,345,395.77 | 0 |
| Morte Const | 3 | ₱13,249,243.04 | 0 |
| Ec Structural Composites INC | 1 | ₱9,746,100.00 | 0 |
| Eg-Vryle Const | 3 | ₱8,877,307.03 | 0 |
| Nrmm Const And Dev'T CORP | 1 | ₱4,935,400.00 | 0 |
| Long Island Builders | 2 | ₱4,586,513.94 | 0 |
| Cpan Engineering | 2 | ₱3,927,328.21 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
Barangays in Kabasalan (29)
- Banker · 5 DPWH projects
- Bolo Batallion · 15 DPWH projects
- Buayan · 9 DPWH projects
- Cainglet · 3 DPWH projects
- Calapan · 1 DPWH projects
- Calubihan · 15 DPWH projects
- Concepcion · 12 DPWH projects
- Diampak · 4 DPWH projects
- Dipala · 3 DPWH projects
- Gacbusan · 1 DPWH projects
- Goodyear · 5 DPWH projects
- Lacnapan · 1 DPWH projects
- Little Baguio · 3 DPWH projects
- Lumbayao
- Nazareth · 2 DPWH projects
- Palinta · 4 DPWH projects
- Peñaranda · 2 DPWH projects
- Poblacion · 4 DPWH projects
- Riverside · 2 DPWH projects
- Sanghanan · 5 DPWH projects
- Santa Cruz · 1 DPWH projects
- Sayao · 2 DPWH projects
- Shiolan · 1 DPWH projects
- Simbol · 3 DPWH projects
- Sininan · 7 DPWH projects
- Tamin · 1 DPWH projects
- Tampilisan · 2 DPWH projects
- Tigbangagan · 4 DPWH projects
- Timuay Danda · 5 DPWH projects
QR codes for Kabasalan
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
