BARILLO CONST AND ENT is listed as a company organization in Philippine public procurement records on this site, with 140 linked DPWH project(s) totaling about ₱2,455,078,849.48. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
BARILLO CONST AND ENT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 140
- Total value
- ₱2,455,078,849.48
- Published flags
- 0
- Region
- Zamboanga Sibugay 2nd DEO · Region IX
Online presence
Google Maps: Barillo Construction & Enterprises★ 5 (1 reviews)Google Maps, 2026-10-22
QHQV+9G3, 1, Ipil, Zamboanga Sibugay
Public Record Grade
A transparent, data-derived summary of reported public records for BARILLO CONST AND ENT — not an accusation or finding of wrongdoing.
Score: 87.50 / 100 · Projects in sample: 140 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 78.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 78.9
- lateCompletedProjects
- 56
- onTimeCompletedProjects
- 77
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 133
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 7
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 140
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 140
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 140
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 140
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 130 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION/IMPROVEMENT OF FLOOD CONTROL FOR PREVENTION AND MITIGATION ALONG BRGY. SAN JOSE-POBLACION IMELDA, PART OF SIBUGUEY RIVER, IMELDA, Z19J00068 · ₱112,061,781.62 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG KABASALAN RIVER (PHASE III), FL PENA, KABASALAN, ZAMBOANGA SIBUGAY21J00016 · ₱105,140,291.50 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (PHASE IV), FL PENA, KABASALAN, ZAMBOANGA SIBUGAY22J00058 · ₱104,942,275.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVERS BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (PHASE V), DOWNSTREAM, CANACAN, KABASALAN, ZAMBOANGA SIBUGAY, PACKAGE 123J00042 · ₱104,780,089.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVERS BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (PHASE V), DOWNSTREAM, CANACAN, KABASALAN, ZAMBOANGA SIBUGAY, PACKAGE 223J00043 · ₱100,040,481.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVERS BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (PHASE V), FL PENA, KABASALAN, ZAMBOANGA SIBUGAY, PACKAGE 123J00044 · ₱100,025,496.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (PHASE II), CANACAN, KABASALAN, ZAMBOANGA SIBUGAY (PACKAGE 2)22J00060 · ₱99,992,665.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (PHASE II), CANACAN, KABASALAN, ZAMBOANGA SIBUGAY (PACKAGE 1)22J00059 · ₱99,976,365.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABASALAN RIVER (PHASE II) CANACAN, KABASALAN, ZAMBOANGA SIBUGAY20J00034 · ₱96,590,880.00 · mapped
- Construction of Flood Control Structure at Magsaysay River Phase I RT Lim, Zamboanga Sibugay24J00233 · ₱95,529,501.40 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TAWAY, IPIL, ZAMBOANGA SIBUGAY22JF0056 · ₱84,766,234.35 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROAD LEADING TO IPIL, AIRPORT, BRGY. SANITO, IPIL, ZAMBOANGA SIBUGAY20JF0092 · ₱49,048,855.00 · mapped
- CONSTRUCTION OF ACCESS ROAD LEADING TO VETERANS-LUMBIA-TIMALANG, IPIL, ZAMBOANGA SIBUGAY (PHASE II)24J00232 · ₱49,000,104.80 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT PHASE II IN METRO BRGY. OF IPIL, ZAMBOANGA SIBUGAY20JF0016 · ₱48,948,092.00 · mapped
- CONCRETING OF ACCESS ROAD OF IPIL, AIRPORT, IPIL, ZAMBOANGA SIBUGAY20JF0091 · ₱48,516,521.00 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY,(SO113MN) LANAO-PAGADIAN-ZAMBOANGA CITY ROAD16JF0046 · ₱48,234,109.28 · mapped
- CONSTRUCTION OF ACCESS ROAD LEADING TO VETERANS-LUMBIA-TIMALANG, IPIL, ZAMBOANGA SIBUGAY18JF0089 · ₱47,978,885.75 · mapped
- IMPROVEMENT/CONCRETING OF RD. FROM JCT NATIONAL HIGHWAY LEADING TO CAPITOL HEIGHTS(PHASE I-V), IPIL, Z.S.15JF0075 · ₱47,688,756.69 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG KABASALAN RIVER (PHASE III), CANACAN, KABASALAN, ZAMBOANGA SIBUGAY21J00017 · ₱47,503,527.56 · mapped
- CONSTRUCTION / IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM CONSTRUCTION OF CONCRETE ROAD - NRJ LEADING TO ZAPANTA - GOMEZ CAVE, BRGY. LIPAKAN, PRES. MANUEL A. ROXAS, ZAMBOANGA DEL NORTE20JB0011 · ₱47,249,975.24 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANITO RIVER (PHASE V), IPIL, ZAMBOANGA SIBUGAY24JF0005 · ₱45,130,886.30 · mapped
- CONST. OF RD. SLOPE PROTECTION ALONG CROSSING STA. CLARA-SANDAYONG RD. - K1806+360 - K1806+440, K1809+520 - K1809+555, K1809+580 - K1809+635, K1810+045 - K1810+080, K1810+150 - K1810+278, 1810+290 - K1810+320 ZAMBO. SIBUGAY18JF0003 · ₱40,855,096.60 · mapped
- CONSTRUCTION OF 2 UNITS 2 STOREY 10 CL SCHOOL BUILDING AT IPIL HEIGHTS ES, IPIL HEIGHTS, IPIL, ZAMBOANGA SIBUGAY18JF0115 · ₱39,744,584.10 · mapped
- Construction of Flood Control Structure along Sanito River (Phase IV), Ipil, Zamboanga Sibugay24JF0004 · ₱38,685,192.00 · mapped
- Construction of Flood Control Structure along Sanito River (Phase VI), Ipil, Zamboanga Sibugay24JF0006 · ₱38,685,192.00 · mapped
- CONCRETING OF ROADS TO IPIL AIRPORT, IPIL, ZAMBOANGA SIBUGAY21JF0029 · ₱36,893,013.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL FOR PREVENTION AND MITIGATION ALONG SIBUGUEY RIVER, BRGY. BALUGO-BRGY. POBLACION, IMELDA, ZAMBOANGA SIBUGAY, STA. 0+000.00 - STA. 0+304.5019JI0060 · ₱33,380,220.00 · mapped
- CONSTRUCTION OF 4 STOREY 20CL AT FRANCISCO RAMOS NHS (FORMERLY BUAYAN NHS), KABASALAN, ZAMBOANGA SIBUGAY16JF0027 · ₱29,748,787.17 · mapped
- CONSTRUCTION OF ACCESS ROAD LEADING TO IPIL AIRPORT, IPIL, Z.S.15JF0073 · ₱28,610,861.23 · mapped
- UPGRADING/ CONCRETE PAVING OF ACCESS ROAD TO IBT CIRCUMFERENTIAL ROAD GOING TO TAWAY, IPIL, ZAMBOANGA SIBUGAY (PHASE II)21JF0031 · ₱28,155,993.00 · mapped
- ROAD WIDENING - PRIMARY ROADS - IPIL - LILOY - SINDANGAN ROAD K1996+(-863) - K1996+(656), K2002+680 - K2003+000, K2011+837.84 - K2012+09720JF0007 · ₱26,584,492.00 · mapped
- FARM TO MARKET ROAD (FMR) PROJECTS (CLUSTERED)A. CONCRETING OF SANITO FMR, BRGY. SANITO, IPIL, ZAMBOANGA SIBUGAYB. CONCRETING OF PUROK 1 PUROK 3 PISAAN FMR, BRGY. MARISOLO, NAGA, ZAMBOANGA SIBUGAYC. CONCRETING OF BRGY. STO. ROSARIO BRGY. TARUC F17JF0015 · ₱24,129,702.71 · mapped
- COMPREHENSIVE DRAINAGE SYSTEM WITHIN METRO IPIL AREA, IPIL ZAMBOANGA SIBUGAY18JF0021 · ₱23,230,592.40 · mapped
- CONSTRUCTION OF FLOOD CONTROL PROJECT FROM VETERANS VILLAGE TO DON ANDRES, IPIL, Z.S18JF0009 · ₱22,404,091.05 · mapped
- BRGY. TAMBANAN RD. CONNECTING BRGY. TAMBANAN JUNCTION NATIONAL HIGHWAY IN SUPPORT OF RUBBER INDUSTRY, NAGA, ZAMBOANGA SIBUGAY19JF0022 · ₱17,056,188.00 · mapped
- CONSTRUCTION OF 2 STOREY 8CL SCHOOL BUILDING AT MONCHING NHS, SIAY, Z.S17JF0114 · ₱16,932,885.20 · mapped
- CONSTRUCTION OF 2 STOREY 8CL SCHOOL BUILDING AT PALOMOC NHS, TITAY, Z.S17JF0113 · ₱16,932,885.20 · mapped
- CONSTRUCTION OF 2 STOREY 4 CL SCHOOL BUILDING AT ZAMBOANGA SIBUGAY NATIONAL HIGH SCHOOL, PANGI IPIL, ZAMBOANGA SIBUGAY19JF0149 · ₱13,499,406.90 · mapped
- CONSTRUCTION OF 2 STOREY 6 CLASSROOM AT IPIL SPECIAL EDUCATION CENTER, IPIL, ZAMBOANGA SIBUGAY18JF0129 · ₱12,278,924.00 · mapped
- CONSTRUCTION OF 1 UNIT 2 STOREY 6 CL SCHOOL BUILDING AT DOÑA JOSEFA ES, DOÑA JOSEFA, IPIL, ZAMBOANGA SIBUGAY18JF0111 · ₱11,947,909.57 · mapped
- CONSTRUCTION OF TWO-STOREY 10 CLASSROOM BUILDING AT ESU SIAY, ZAMBOANGA SIBUGAY18JF0121 · ₱11,913,714.60 · mapped
- CONSTRUCTION OF 1 UNIT 2 STOREY 6 CL SCHOOL BUILDING AT BUAYAN ES, BUAYAN, KABASALAN, ZAMBOANGA SIBUGAY18JF0112 · ₱11,811,534.22 · mapped
- CONCRETING OF PUROK NUEVO - PUROK GREENFIELD, BRGY. SANITO FARM TO MARKET ROAD (FMR), IPIL ZAMBOANGA SIBUGAY18JF0099 · ₱9,889,137.54 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BRGY. TAMBANAN ROAD CONNECTING BRGY. TAMBANAN AND JUNCTION NATIONAL HIGHWAY IN SUPPORT OF RUBBER INDUSTRY, NAGA, ZAMBOANGA SIBUGAY20JF0033 · ₱9,701,373.00 · mapped
- REPAI/ REHABILITATION OF ROTUNDA, BRGY. POBLACION, IPIL, ZAMBOANGA SIBUGAY20JF0087 · ₱9,698,205.00 · mapped
- CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER, TUNGAWAN, ZAMBOANGA SIBUGAY18JF0012 · ₱9,615,455.00 · mapped
- CONCRETING OF THE ACCESS ROAD OF IPIL, AIRPORT, IPIL, ZAMBOANGA SIBUGAY20JF0093 · ₱9,612,276.10 · mapped
- ASSET PRESERVATION OF NAT'L RD. - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NAT'L RD. - PRIMARY, (S01139MN) IPIL-LILOY-SINDANGAN RD. (K1996+260 - K1996+500) (K1997+100 - K1999+049) Z.C16JF0071 · ₱9,515,634.42 · mapped
- PROPOSED REPAIR/ REHAB UPGRADING OF RURAL HEALTH UNIT AT POBLACION IPIL, IPIL ZAMBOANGA SIBUGAY17JF0098 · ₱9,358,512.14 · mapped
- CONSTRUCTION OF 1 UNIT 2 STOREY 4 CL SCHOOL BUILDING AT PEÑARANDA ES, PEÑARANDA, KABASALAN, ZAMBOANGA SIBUGAY18JF0113 · ₱9,330,226.39 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
