Barangay
Luhong
Luhong, Tinoc, Ifugao, Cordillera Administrative Region (CAR). Rural. Population 1,411 (2024 POPCEN).
PSGC 1402710008 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Luhong
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
12 records · ₱510,601,365.65
- Construction of Concrete Road Ballay - Tabio - Tonoman - Bulalacao - Tawangan - Lusod Road Leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet₱149,490,000.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Manaan Flood Control (Phase Ii), Luhong, Tinoc, Ifugao₱96,500,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction/Improvement of Access Roads Leading to Airports, Seaports, and Declared Tourism Destinations Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road Leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet₱96,500,000.00 · 2017 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Concrete Road - Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road Leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet₱55,831,097.33 · 2018 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure Along Tinoc River, Sta. 98+350 - Sta. 98+940 (Manaan Section), Tinoc, Ifugao₱38,845,135.10 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Along Tinoc River, Sta. 98 + 960 - Sta. 99 + 440 (Manaan Section), Tinoc, Ifugao₱32,009,050.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
How linked: 12 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Luhong itself. This shows the municipality figure for Tinoc.
1 record · ₱708,434,747.91
- Municipality of Tinoc, Ifugao₱708,434,747.91 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Luhong itself. This shows the province figure for Ifugao.
12,121 records · ₱38,706,319,114.56
12,118 placed at Ifugao level itself; the rest in LGUs under it.
- Ifugao₱38,706,319,114.56 · 12,118 awards · high confidence (area of delivery is this province only)
- Apayao, Aurora, Bataan, Cagayan, Ifugao, Ilocos Norte, Isabela, Nueva Vizcaya, Pangasinan, Quirino₱928,000.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Ifugao, Iloilo₱133,240.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Ifugao, Isabela, Nueva Vizcaya₱76,000.00 · 1 awards · low confidence (area of delivery lists several provinces)
How linked: 12,118 by area of delivery is this province only; 3 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
1 record · ₱4,000,000.00
- Concreting of Manaan to Lab-Ong Fmr₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)
How linked: 1 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
1 record · ₱5,000,000.00
- Construction of Multi-Purpose Building, Barangay Luhong, Tinoc, Ifugao₱5,000,000.00 · 2025 · medium confidence (GAA line text names the place)
How linked: 1 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- Contractor Concentration (Flood Control)Djy ConstContractor: Djy Const
- Contractor Concentration (Flood Control)Djy ConstContractor: Djy Const
- Contractor Concentration (Flood Control)Djy ConstContractor: Djy Const
- High Concurrent Workload for One ContractorMg Samidan ConstContractor: Mg Samidan Const
Contractors on linked DPWH projects
All 9 contractors on DPWH projects linked to Luhong and the LGUs under it. Click a column to sort.
| F B Bantales Engineering Const | 2 | ₱152,331,097.33 | 0 |
| Mg Samidan Const | 1 | ₱149,490,000.00 | 3 |
| Djy Const | 2 | ₱135,345,135.10 | 3 |
| Djy Const / Begal Design & Const | 1 | ₱32,009,050.00 | 0 |
| Balintugan Const | 2 | ₱19,438,613.58 | 0 |
| Agi CO Const Services | 1 | ₱14,224,510.25 | 0 |
| Chrishua Const Services | 1 | ₱2,962,262.98 | 0 |
| Aroboan Const And Supply | 1 | ₱2,938,696.41 | 0 |
| Jrd Const And Supply | 1 | ₱1,862,000.00 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Luhong
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
