Barangay
Armado
Armado, Abra De Ilog, Occidental Mindoro, MIMAROPA Region. Rural. Population 2,062 (2024 POPCEN).
PSGC 1705101009 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Armado
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
11 records · ₱963,913,625.44
- Basic Infrastructure Program (Bip)- Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities- Const. of Flood Control Structure Along Abra de Ilog River, Sitio Kuli-Kuli Section (Rs), Armado, Sta. 000+234-Sta. 000+900, Abra de Il₱284,285,825.17 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure Along Abra de Ilog River, Sitio Kuli-Kuli Section, Armado, Abra de Ilog, Occidental Mindoro₱241,246,624.50 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Asset Preservation Program- Preventive Maintenance- Secondary Roads- Mindoro West Coastal Road, K0417+000 - K0445+498 (Intermittent Sections), Abra de Ilog, Occ. Mindoro₱202,142,719.69 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Asset Preservation Program- Preventive Maintenance- Secondary Roads- Mindoro West Coastal Road, Occidental Mindoro₱155,172,251.73 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction/Installation of Roadway Lighting Along Mindoro West Coastal Road, Mamburao, Ocidental Mindoro₱17,694,945.22 · 2021 · medium confidence (project coordinates inside the barangay boundary)
- Replacement of Pavement Weak Bridge-Balibago Br. (B00120mr) Along Mindoro West Coastal Rd₱17,226,449.94 · 2021 · medium confidence (project coordinates inside the barangay boundary)
How linked: 11 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱924,963.25
- Barangay Armado, Abra de Ilog, Occidental Mindoro₱924,963.25 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Armado itself. This shows the province figure for Occidental Mindoro.
27,956 records · ₱55,997,838,230.02
27,854 placed at Occidental Mindoro level itself; the rest in LGUs under it.
- Occidental Mindoro₱55,997,838,230.02 · 27,854 awards · high confidence (area of delivery is this province only)
- Marinduque, Occidental Mindoro, Oriental Mindoro, Palawan, Romblon₱151,598,207.10 · 42 awards · low confidence (area of delivery lists several provinces)
- Occidental Mindoro, Oriental Mindoro, Palawan₱26,703,956.20 · 15 awards · low confidence (area of delivery lists several provinces)
- Aurora, Bulacan, Ilocos Sur, Marinduque, Nueva Vizcaya, Occidental Mindoro, Oriental Mindoro, Palawan, Pangasinan, Romblon₱7,941,750.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Batangas, Marinduque, Occidental Mindoro, Oriental Mindoro, Palawan, Romblon₱7,788,373.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Occidental Mindoro, Oriental Mindoro, Romblon₱6,660,521.60 · 8 awards · low confidence (area of delivery lists several provinces)
How linked: 27,854 by area of delivery is this province only; 102 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Armado itself. This shows the municipality figure for Abra De Ilog.
6 records · ₱23,000,000.00
2 placed at Abra De Ilog level itself; the rest in LGUs under it.
- Improvement of Water Supply System in Barangay San Vicente, Abra de Ilog₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road to Sitio Alipan₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Installation of Solar Panel (Solar Farm) in So. Amatang and Sto. Tomas₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Provision of Renewable Energy-Based Electrification₱2,500,000.00 · 2025 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱2,500,000.00 · 2025 · high confidence (location columns in the DBM release)
How linked: 6 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
1 record · ₱5,000,000.00
- Construction of Multi - Purpose Building, Barangay Armado, Abra de Ilog, Occidental Mindoro₱5,000,000.00 · 2024 · medium confidence (GAA line text names the place)
How linked: 1 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- High Concurrent Workload for One ContractorEgb Const Corp Formerly: Egb ConstContractor: Egb Const Corp Formerly: Egb Const
Contractors on linked DPWH projects
All 9 contractors on DPWH projects linked to Armado and the LGUs under it. Click a column to sort.
| D T Recio INC | 2 | ₱439,458,076.90 | 0 |
| Golden J'S Const Services | 1 | ₱241,246,624.50 | 0 |
| Egb Const CORP Formerly: Egb Const | 1 | ₱202,142,719.69 | 1 |
| New Mindorenos Lumber Hardware And Gen Merchandise | 2 | ₱27,150,206.24 | 0 |
| Three W Builders INC | 1 | ₱17,226,449.94 | 0 |
| Stx Ent | 1 | ₱14,869,986.76 | 0 |
| Wtl Const | 1 | ₱11,416,680.19 | 0 |
| Kgb Engineering And Const | 1 | ₱5,552,095.94 | 0 |
| Way Maker Gen Contractor Opc | 1 | ₱4,850,785.28 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Armado
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
