1129 BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 27 linked DPWH project(s) totaling about ₱772,813,213.33. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
1129 BUILDERS
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 27
- Total value
- ₱772,813,213.33
- Published flags
- 0
- Region
- Mindoro Occidental DEO · Region IV-B
Licensed officers (PCAB)
- Christian Dalme Saga Tagala · Authorized Managing Officer (PCAB license 38839) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for 1129 BUILDERS — not an accusation or finding of wrongdoing.
Score: 65.60 / 100 · Projects in sample: 27 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 31.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 31.9
- lateCompletedProjects
- 13
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 27
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 27
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 27
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
27 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SAN MANUEL (PANGASINAN) - ITOGON (BENGUET) ROAD, PANGASINAN (PACKAGE 5)24A00305 · ₱144,352,380.85 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG PARPAGOHA (MARIGONDON)-BINOOG RD, K0020+900.00 - K0020+985.60, TABLAS ISLAND, ROMBLON24EH0131 · ₱82,025,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - ABRA DE ILOG BYPASS ROAD, OCCIENTAL MINDORO22EB0011 · ₱65,325,170.79 · mapped
- WIDENING OF PERMANENT BRIDGE - SUGSUGIN BR. (B00112MR) ALONG MINDORO WEST COASTAL RD24EB0029 · ₱64,344,884.84 · mapped
- PREVENTIVE MAINTENANCE-SECONDARY ROADS QUEZON-PUNTA BAJA RD-K0152+889-K0154+691, QUEZON, PALAWAN24EF0015 · ₱51,383,582.29 · mapped
- CONSTRUCTION OF NEW BRIDGES DARUNDONG BR. ALONG SABLAYAN-PENAL COLONY ROAD23EB0019 · ₱48,999,981.96 · mapped
- REHABILITATION OF ROAD, BARANGAY KAMUNING (PHASE 2), QUEZON CITY25OG0019 · ₱38,213,620.68 · mapped
- CONSTRUCTION OF NEW BRIDGES CALLAGON BR. ALONG ARAMAYWAN-BERONG-PUERTO PRINCESA ROAD (PHASE I), QUEZON, PALAWAN23EF0063 · ₱31,837,883.36 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- P. FAURA ST.-K0002 + (-445) - K0002 + 61624OH0003 · ₱29,782,318.71 · mapped
- WIDENING OF BRIDGE - BUNGAHAN BR. (B00123MR) ALONG MINDORO WEST COASTAL RD20EB0042 · ₱29,399,998.03 · mapped
- CONSTRUCTION OF NEW BRIDGES COMAJOS BR. ALONG CULANDANUM-PANALINGAAN CROSS COUNTRY ROAD (PHASEI)23EF0047 · ₱29,399,390.00 · mapped
- Construction of Drainage System along Arellano St., Paco, Manila24OH0033 · ₱29,395,548.76 · mapped
- WIDENING OF BRIDGE - MAMARA BR. (B00126MR) ALONG MINDORO WEST COASTAL RD20EB0046 · ₱25,300,782.16 · mapped
- REHAB./MAJOR REPAIR OF PERMANENT BRIDGES PULOT BR. (B00064PW) ALONG PPSR, SOFRONIO ESPAÑOLA, PALAWAN25EF0006 · ₱15,677,536.90 · mapped
- REHAB./MAJOR REPAIR OF PERMANENT BRIDGES-MAASIN BR. (B00070PW) ALONG PPSR, BROOKE'S POINT, PALAWAN25EF0003 · ₱13,466,998.40 · mapped
- CONSTRUCTION OF NEW BRIDGES COMAJOS BR. ALONG CULANDANUM-PANALINGAAN CROSS COUNTRY RD RIZAL, PALAWAN24EF0019 · ₱9,797,989.05 · mapped
- CONSTRUCTION OF NEW BRIDGES CALLAGON BR. ALONG ARAMAYWAN-BERONG-PTO PRINCESA RD, QUEZON, PALAWAN24EF0007 · ₱9,797,409.26 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS PUERTO PRINCESA SOUTH RD - K0131+94023EF0011 · ₱9,701,998.18 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. CAWIT, BOAC, MARINDUQUE21EA0126 · ₱7,917,999.47 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG MINDORO WEST COASTAL RD - K00363+000 - K0363+42522EB0091 · ₱7,884,000.43 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - RAMAYAN BR. 2 (B00165MR) ALONG CROSSING MWCR (POLA)-CASAGUE-JCT ALACAAK RD22EB0023 · ₱7,752,142.89 · mapped
- CONCRETING OF ROAD FROM JUNCTION OF NATIONAL HIGHWAY, BRGY. STO. NINO TO SITIO KALIKASAN, STO. NINO, RIZAL, OCCIDENTAL MINDORO21EB0122 · ₱6,180,320.34 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY UDALO, ABRA DE ILOG, OCCIDENTAL MINDORO22EB0064 · ₱4,355,209.39 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE - RAMAYAN BR. 1 (B00164MR) ALONG CROSSING MWCR (POLA)-CASAGUE-JCT ALACAAK RD22EB0026 · ₱3,470,883.56 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE PALAWAN CIRCUM RD K0210+259 - K0210+28922EF0084 · ₱2,939,642.36 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE- SAN ISIDRO BR. 2 (B00150MR) ALONG JCT MWCR (SN ISIDRO)-PENAL COLONY-JCT YAPANG RD22EB0024 · ₱2,665,598.02 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE CULANDANUM-PANALINGAAN CROSS COUNTRY RD - (S00065PW) CHAINAGE 8927 - CHAINAGE 895722EF0085 · ₱1,444,942.65 · mapped
Equipment & capacity
PCAB license
- License no.
- 38839
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Mar 10, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 38839); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 2 GPPB CPES releases; average final rating 95.7% over 1 rated project; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Apr 29, 2025 | DPWH | ₱29,395,548.00 | Completed | 95.8% | 95.7% | 40th, p. 3 |
| Oct 17, 2024 | DPWH | ₱28,782,198.00 | On-going | 95.7% | — | 39th (rev), p. 1 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 26 awards · ₱506,419,975.16
- City of Tanjay Infrastructure: 13 awards · ₱41,352,900.90
- Province of Negros Oriental Infrastructure: 4 awards · ₱25,373,161.77
- Civil Aviation Authority of the Philippines Infrastructure: 1 award · ₱9,158,893.49
- Municipality of San Fernando, Bukidnon Infrastructure: 1 award · ₱878,742.21
- Construction Project
- Construction Project
- 25EF0003₱13,466,998.40· 2025-03-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - PALAWAN 2ND DEO
- 25EF0006₱15,629,997.47· 2025-02-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - PALAWAN 2ND DEO
- Construction Project
- Infrastructure Projects (B-355-2024)
- Construction Project
- Construction Project
- Construction Project
- Construction Project
- Construction Project
- Rehabilitation/Reconstruction of Roads with Slips,
- 24A00305
- Construction Project
- Construction Project
- Construction Project
- Infrastructure Projects (B-302-2023)
- Infrastructure Projects (B-272-2023)
- 24OH0003-Organizational Outcome 1 Ensure Safe and₱29,564,382.42· 2024-02-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH METRO MANILA
- 24OH0033-Organizational Outcome 2 Protect Lives a₱28,782,198.28· 2024-02-02· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTH METRO MANILA
- 24EF0019₱9,701,998.55· 2024-01-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - PALAWAN 2ND DEO
- 24EF0007₱9,505,998.27· 2024-01-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - PALAWAN 2ND DEO
- Construction Project
- Infrastructure Projects (B-206-2023)
- 23EF0047₱28,959,000.00· 2023-06-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - PALAWAN 2ND DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →