BATUA ENGINEERING SERVICES AND CONST SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 29 linked DPWH project(s) totaling about ₱213,253,306.29. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
BATUA ENGINEERING SERVICES AND CONST SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 29
- Total value
- ₱213,253,306.29
- Published flags
- 0
- Region
- Cotabato 3rd DEO · Region XII
Licensed officers (PCAB)
- Norodin Pangagilan Batua · Authorized Managing Officer (PCAB license 36945) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for BATUA ENGINEERING SERVICES AND CONST SUPPLY — not an accusation or finding of wrongdoing.
Score: 83.80 / 100 · Projects in sample: 29 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 78.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 78.3
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 19
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 29
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 29
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 29
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
29 geotagged projects — Open full map
- NRJ LEADING TO MLANG AIRPORT, BRGY. LANGKONG, MLANG, NORTH COTABATO23MI0100 · ₱28,408,600.20 · mapped
- CONCRETING OF ROAD, BRGY. ARAKAN, MATALAM, COTABATO23MI0042 · ₱23,739,943.69 · mapped
- BUKIDNON-COTABATO RD (KAYAGA COMMON JCT)-(S00808MN) CHAINAGE 000 - CHAINAGE 46524MI0060 · ₱22,100,595.62 · mapped
- CONCRETING OF PUROK SANTOL, BRGY. CENTRAL MALAMOTE FMR PHASE II, BRGY. CENTRAL MALAMOTE, MATALAM, NORTH COTABATO24MI0078 · ₱14,913,848.27 · mapped
- CONCRETING OF BRGY. DAIG FMR, BRGY. DAIG, TULUNAN, COTABATO24MI0080 · ₱9,939,206.34 · mapped
- CONSTRUCTION OF KABACAN RIS, DRAINAGE RESHAPING AT MALIGAYA, KABACAN, COTABATO25MI0019 · ₱9,786,553.57 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BALABAG-SITIO UMPANG ROAD LEADING TO PANIKI FALLS, BRGY. BALABAG, KIDAPAWAN CITY, NORTH COTABATO (RE-PUBLISHED)20MC0036 · ₱7,839,990.82 · mapped
- CONST. OF 2UNITS UNIQUE WORKSHOP BUILDING 1 & 2, MALINAO NHS, BANISILAN, COTABATO17MD0245 · ₱6,574,709.13 · mapped
- CLUSTER 2 : CONST. OF 2UNITS UNIQUE WORKSHOP BLDG 1 & 2, RANZO NHS, CARMEN, COTABATO17MD0238 · ₱6,321,383.71 · mapped
- CLUSTER 1 : CONST. OF 2UNITS UNIQUE WORKSHOP BLDG 1 & 2, RANZO NHS, CARMEN, COTABATO17MD0237 · ₱6,321,383.71 · mapped
- CLUSTER 1 - CONST. OF 2UNITS UNIQUE WORKSHOP BLDG 1 & 2 , MALAPAG NHS, CARMEN, COTABATO17MD0242 · ₱6,321,383.71 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY KANIBONG, TULUNAN, COTABATO24MI0054 · ₱4,946,294.34 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT PUROK MAGONCIA, BARANGAY KIBUDOC, MATALAM, COTABATO23MI0046 · ₱4,945,273.58 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH CENTER) BARANGAY KIBENES, CARMEN COTABATO24MI0056 · ₱4,945,031.06 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), SITION F. BALDEVIESO, BRGY. NEW BUGASONG, MATALAM, COTABATO23MI0018 · ₱4,944,677.76 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BARANGAY DALAPITAN, MATALAM, COTABATO24MI0027 · ₱4,944,110.94 · mapped
- CONSTRUCTION OF SOLAR-POWERED WATER SUPPLY SYSTEM, BRGY. KIDAMA, MATALAM, NORTH COTABATO25MI0026 · ₱4,943,004.12 · mapped
- CONSTRUCTION OF SOLAR-POWERED WATER SUPPLY SYSTEM, BITUAN ELEMENTARY SCHOOL, BARANGAY BITUAN, TULUNAN, NORTH COTABATO25MI0027 · ₱4,942,602.83 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY WEST PATADON, MATALAM, NORTH COTABATO25MI0083 · ₱4,695,693.53 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN MARBEL NATIONAL HIGH SCHOOL, BARANGAY MARBEL, MATALAM, COTABATO25MI0074 · ₱4,692,213.05 · mapped
- COMPLETION/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BRGY. KALUNASAN, MLANG, COTABATO25MI0082 · ₱4,692,188.97 · mapped
- CONSTRUCTION OF LOCAL ROAD AT POBLACION B, MLANG, COTABATO.20M00157 · ₱3,479,302.47 · mapped
- CONST. OF 1UNIT WORKSHOP BUILDING, MALAPAG NHS, CARMEN, COTABATO17MD0239 · ₱3,209,862.87 · mapped
- CONST. OF 1UNIT UNIQUE WORKSHOP BUILDING, RANZO NHS, CARMEN, COTABATO17MD0235 · ₱3,209,862.87 · mapped
- REHABILITATION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY LINAO, MATALAM, NORTH COTABATO25MI0009 · ₱2,966,860.56 · mapped
- RAINWATER COLLECTOR IN PUBLIC FACILITIES24MI0096 · ₱2,893,007.34 · mapped
- CONST. OF 1STY 2CL SB (TOILET ATTACHED), TAMPED ES, KABACAN, COTABATO17MD0110 · ₱2,678,190.78 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (OFFICE OF LIKA POTABLE WATER SYSTEM ASSOCIATION-LIPOWASA) IN BARANGAY LIKA, MLANG, COTABATO24MI0066 · ₱1,976,674.79 · mapped
- CONST. OF MULTI-PURPOSE BUILDING, PEDTAD KABACAN, COTABATO18MD0084 · ₱1,880,855.66 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
