JL22 CONST is listed as a company organization in Philippine public procurement records on this site, with 6 linked DPWH project(s) totaling about ₱58,958,340.57. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
JL22 CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 6
- Total value
- ₱58,958,340.57
- Published flags
- 0
- Region
- Apayao 1st DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- LOYAL MALAZZAB CARAG · Authorized Managing Officer (PCAB license 53456) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JL22 CONST — not an accusation or finding of wrongdoing.
Score: 75.00 / 100 · Projects in sample: 6 · As of Oct 22, 2026 UTC
Thin public record coverage: Fewer than half of linked projects have DPWH schedule/status fields used for on-time scoring; several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- graceDays
- 30
- componentScore
- —
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 2
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 2
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 50%
- totalProjects
- 6
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 50%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 6
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 6
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 6
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
6 geotagged projects — Open full map
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - REHABILITATION OF PAVED ROAD - CAGAYAN VALLEY RD - K0546+297.7 - K0547+855.5, GATTARAN, CAGAYAN23BB0060 · ₱16,660,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYTEM, BRIDGE PROGRAM- CONSTRUCTION OF NEW BRIDGES, MALABANIG BR.( B04237LZ) ALONG APAYAO-ILOCOS NORTE RD WHICH WE RECEIVED ON MAY 13, 202424PB0054 · ₱14,269,361.39 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF PUGO PADDAOAN CIS FLOOD CONTROL STRUCTURE, CONNER, APAYAO24PB0037 · ₱9,704,021.85 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM(BIP) BIP- MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, (EVACUATION CENTER), BARANGAY CALAFUG, CONNER, APAYAO WHICH WE RECIEVED24PB0055 · ₱9,609,775.10 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, CONNER-KABUGAO RD - K0602 + 423 - K0602 + 43824PB0057 · ₱5,804,627.28 · mapped
- CONVERGENCE AND SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG) SIPAG- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC24PB0035 · ₱2,910,554.95 · mapped
Across government
- DPWH Infrastructure: 6 awards · ₱58,791,742.09
- Province of Apayao Infrastructure: 8 awards · ₱32,824,028.23
- Apayao State College Infrastructure: 4 awards · ₱31,735,708.16
- Municipality of Gonzaga, Cagayan Infrastructure: 2 awards · ₱6,989,604.08
- Municipality of Conner Infrastructure: 2 awards · ₱4,059,020.40
- CONSTRUCTION OF DALUMPENAT-IPIL-KATUB FMR CONNER,
- CONSTRUCTION OF CRISPIN GALLEON FMR LUNA, APAYAO
- IMPROVEMENT OF ULIDAO-BANBANAN FMR CALANASAN, APA
- Construction Projects₱5,804,627.28· 2024-07-01· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- Construction Projects₱9,609,775.10· 2024-06-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- Construction Projects₱14,269,361.39· 2024-05-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- Construction/Improvement of Buluan-mawigue-Allangi
- Improvement of Multi-Purpose Building
- CONSTRUCTION OF MULTI-PURPOSE HALL AT PUROK 4 ALLA
- Construction Projects₱2,910,554.95· 2024-04-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- Construction Projects₱9,704,021.85· 2024-04-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- Expansion of Municipal Health Center, Phase II
- Construction of Building, San Gregorio Elementary
- Construction of Banco-Balite Farm to Market Road
- Improvement of Banban-Daga-Puguin-Mabiga Provinci
- Construction of Water Supply System Eva, Calanasan
- Expansion of Health Center
- 23BB0060 - OO1 Ensure Safe and Reliable National₱16,493,401.52· 2023-03-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CAGAYAN 1ST DEO
- civil works
- civil works
- civil works
- CIVIL WORKS
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
