JEDIDIAH CONST is listed as a company organization in Philippine public procurement records on this site, with 38 linked DPWH project(s) totaling about ₱413,091,533.35. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
JEDIDIAH CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 38
- Total value
- ₱413,091,533.35
- Published flags
- 4
- Region
- Marinduque DEO · Region IV-B
Licensed officers (PCAB)
- ROMEL LAQUE DY · Authorized Managing Officer (PCAB license 51133) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JEDIDIAH CONST — not an accusation or finding of wrongdoing.
Score: 92.30 / 100 · Projects in sample: 38 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 97.3/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 97.3
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 35
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 37
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 38
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 38
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 96.8/100 · Weight: 11%
- projects
- 38
- componentScore
- 96.8
- flagsPerProject
- 0.11
- publishedV2Flags
- 4
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 38
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
37 geotagged projects — Open full map · Download projects (CSV)
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MALIGAYA, BOAC, MARINDUQUE25EA0056 · ₱33,524,137.66 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - MARINDUQUE CIRCUMFERENTIAL RD - K0050+340 - K0051+32924EA0018 · ₱27,880,839.18 · mapped
- CONSTRUCTION OF LAPOTE-MANGYAN MABABAD ROAD, MOGPOG, MARINDUQUE22EA0220 · ₱27,139,204.98 · mapped
- CONCRETING OF SITIO ABACA, BRGY. NUG-AS FMR, BRGY. NUG-AS, ALCOY, CEBU25HE0129 · ₱25,068,180.44
- Construction of Sumangga Flood Control Structure, Mogpog, Marinduque22EA0243 · ₱24,729,962.75 · mapped
- REHABILITATION OF TARUG-SAN ISIDRO ROAD, STA. CRUZ, MARINDUQUE22EA0183 · ₱19,798,105.45 · mapped
- Construction of Damaged Flood Control Structure, Brgy. Maligaya, Boac, Marinduque23EA0063 · ₱18,550,221.21 · mapped
- Construction of Santol Flood Control, Boac, Marinduque24EA0027 · ₱18,214,714.08 · mapped
- CONSTRUCTION OF POCTOY-BAMBAN-CATUBUGA-BALAGASAN-MAINIT ROAD, BOAC, MARINDUQUE22EA0221 · ₱18,169,327.48 · mapped
- CONCRETING OF BRGY. BOGNUYAN FMR PHASE II, BRGY. BOGNUYAN, GASAN,MARINDUQUE24EA0063 · ₱14,920,815.79 · mapped
- CONCRETING OF BRGY. BINTAKAY FMR PHASE 2, BRGY. BINTAKAY, MOGPOG, MARINDUQUE22EA0253 · ₱11,118,090.49 · mapped
- CONCRETING OF BRGY. JANAGDONG FMR, BRGY. JANAGDONG, MOGPOG, MARINDUQUE22EA0264 · ₱10,791,211.63 · mapped
- Construction of Flood Control Structure, Brgy. Bintakay, Mogpog, Marinduque22EA0188 · ₱9,813,540.74 · mapped
- CONSTRUCTION OF ROAD, BARANGAY DAWIS, GASAN, MARINDUQUE22EA0226 · ₱9,783,076.46 · mapped
- Construction of Flood Control Structure at Brgy. Tapuyan, Gasan, Marinduque22EA0237 · ₱9,700,095.72 · mapped
- CONSTRUCTION OF ROAD, ILAYANG BOCBOC TO SITIO PAADYAO, BARANGAY BOCBOC, MOGPOG, MARINDUQUE23EA0046 · ₱9,109,075.72 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING BRGY, BINTAKAY, MOGPOG, MARINDUQUE24EA0049 · ₱6,927,858.21 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING BRGY. MATAAS NA BAYAN, MOGPOG, MARINDUQUE24EA0048 · ₱6,925,058.19 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY HINANGGAYON, MOGPOG, MARINDUQUE22EA0067 · ₱6,924,459.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DUYAY, BOAC, MARINDUQUE22EA0064 · ₱6,890,374.70 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BUTANSAPA, MOGPOG, MARINDUQUE22EA0166 · ₱6,832,138.75 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TABI, BOAC, MARINDUQUE22EA0172 · ₱6,783,531.08 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING BRGY. DULONG BAYAN, MOGPOG, MARINDUQUE24EA0047 · ₱6,756,250.28 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MENDEZ, MOGPOG, MARINDUQUE24EA0054 · ₱6,739,398.78 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LIPA, SANTA CRUZ, MARINDUQUE22EA0077 · ₱6,717,423.89 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUMANGGA, MOGPOG, MARINDUQUE22EA0107 · ₱6,717,143.88 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MOGPOG CENTRAL SCHOOL, MOGPOG, MARINDUQUE22EA0173 · ₱6,626,023.88 · mapped
- Construction of Flood Control Structure, Barangay Bachao Ilaya, Gasan, Marinduque23EA0040 · ₱4,948,142.90 · mapped
- Construction of Flood Control, Brgy. Bachao-Ibaba, Gasan, Marinduque24EA0052 · ₱4,948,075.66 · mapped
- Construction of Flood Control, Brgy. Ihatub, Boac, Marinduque24EA0053 · ₱4,947,817.66 · mapped
- CONSTRUCTION OF ROAD, BARANGAY MALBOG, BUENAVISTA, MARINDUQUE24EA0016 · ₱4,822,384.29 · mapped
- CONSTRUCTION OF ROAD, BRGY. SAN ANTONIO, SANTA CRUZ, MARINDUQUE23EA0116 · ₱4,804,702.28 · mapped
- CONSTRUCTION OF ROAD, BRGY. PANGI, GASAN, MARINDUQUE23EA0119 · ₱4,759,860.83 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GUISIAN, MOGPOG, MARINDUQUE22EA0167 · ₱4,716,604.37 · mapped
- CONSTRUCTION OF ROAD, BARANGAY DUYAY, BOAC, MARINDUQUE23EA0118 · ₱4,699,160.87 · mapped
- CONSTRUCTION OF ROAD, BARANGAY TAPUYAN, GASAN, MARINDUQUE24EA0017 · ₱4,598,004.28 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. HUPI, SANTA CRUZ, MARINDUQUE24EA0042 · ₱3,851,383.93 · mapped
- REHABILITATION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PORAS, BOAC, MARINDUQUE22EA0177 · ₱2,845,135.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 51133
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Sep 7, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 51133); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 5, 2025 | DPWH | ₱33,524,138.00 | On-going | 88.0% | — | 40th, p. 160 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →