MARCUS CONST & SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 36 linked DPWH project(s) totaling about ₱2,009,526,268.66. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
MARCUS CONST & SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 36
- Total value
- ₱2,009,526,268.66
- Published flags
- 3
- Region
- COTABATO (NORTH COTABATO) · Region XII
Online presence
Google Maps: MarCus Construction and SupplyGoogle Maps, 2026-10-22
Poblacion 7, Midsayap, Cotabato
Licensed officers (PCAB)
- MARLYN TAYAG CUSTODIO · Authorized Managing Officer (PCAB license 12601) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MARCUS CONST & SUPPLY — not an accusation or finding of wrongdoing.
Score: 87.70 / 100 · Projects in sample: 36 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 85.7/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 85.7
- lateCompletedProjects
- 6
- onTimeCompletedProjects
- 27
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 34
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 36
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 36
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 97.5/100 · Weight: 11%
- projects
- 36
- componentScore
- 97.5
- flagsPerProject
- 0.08
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
36 geotagged projects — Open full map · Download projects (CSV)
- Construction of Revetment along Marbol River (Phase II) Barangay New Cebu, Pres. Roxas, Cotabato24MC0026 · ₱96,493,871.31 · mapped
- Construction of Flood Mitigation Structure, Downstream of Tacupan Bridge, Tacupan, Carmen, Cotabato24MI0062 · ₱96,345,472.96 · mapped
- ROAD WIDENING BUKIDNON-COTABATO ROAD K1615+357-K1617+996, CARMEN, NORTH COTABATO22M00011 · ₱91,433,823.60 · mapped
- CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (CARABAO CENTER-RIGHT SIDE), STA. 0+000-STA0+662.11, USM, KABACAN, COTABATO23M00157 · ₱88,576,426.12 · mapped
- CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT (UGALINGAN SECTION-PHASE IV), UGALINGAN, CARMEN, COTABATO19MD0031 · ₱86,791,202.82 · mapped
- Construction of Flood Control Dike along Kabacan River L/S, Sta. 51 + 575 - Sta. 51 + 938.64, Barangay Doles, Magpet, North Cotabato23M00018 · ₱77,173,242.35 · mapped
- CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF UGALINGAN FLOOD CONTROL PROJECT II (RIVER BANK PROTECTION W/REVETMEN), UGALINGAN, CARMEN, COTABATO18MD0078 · ₱76,539,346.76 · mapped
- ROAD WIDENING ALONG BUKIDNON-COTABATO ROAD K1636 + 934 K1637 + 870, K1639 + 1000 K1642 +065, CARMEN, NORTH COTABATO20M00144 · ₱72,830,964.65 · mapped
- CONSTRUCTION OF KABACAN RIVER BANK PROTECTION (UPSTREAM OF LUMAYONG BRIDGE, LEFT SIDE), STA 0+000 - STA 0+540.71, PHASE I, KABACAN, NORTH COTABATO23M00155 · ₱72,183,912.46 · mapped
- Construction of Lumayong Flood Control Project (Downstream of Carmen Bridge, Kayaga to Sitio Punol, Phase III) along Pulangi River, Kabacan, Cotabato23M00158 · ₱72,167,177.40 · mapped
- Construction of Flood Control Dike along Kabacan River R/S, Brgy. Inac, Magpet, North Cotabato22MC0030 · ₱67,550,000.00 · mapped
- CONSTRUCTION OF BUAL RIVER BANK PROTECTION, PHASE I, STA. 0+000 - STA. 0+504.663, BARANGAY BUAL, TULUNAN, COTABATO23M00150 · ₱67,477,953.17 · mapped
- Construction of Kabacan River Flood Control Project (Carabao Center Phase III), USM, Kabacan, Cotabato24MI0055 · ₱65,592,867.27 · mapped
- CLUSTER VII-A.CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BRGY. PUTI, NORALA, SOUTH COTABATO B.CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BRGY. PUNONG GRANDE, BANGA, SOUTH COTABATO21MG0099 · ₱59,686,528.62 · mapped
- ROAD WIDENING ALONG BUKIDNON-COTABATO ROAD, BRGY. AROMAN, CARMEN, NORTH COTABATO19MD0040 · ₱58,794,555.00 · mapped
- Construction of Flood Control Dike along Kabacan River L/S, Sta. 50 + 860 - 51 + 240, Brgy. Doles, Magpet, North Cotabato22MC0050 · ₱50,254,305.00 · mapped
- CONCRETING OF ROADS, BARANGAY KIBUDTUNGAN (SITIO TAWAGON TO SITIO CUMANTI), CARMEN, NORTH COTABATO.20M00155 · ₱49,500,000.00 · mapped
- Construction of Kabacan River Flood Control, Barangay Doles, Magpet, Cotabato, Sta. 51 + 575 to Sta. 51 + 802.2722MC0061 · ₱49,000,000.00 · mapped
- Construction of Revetment, Kabacan River Bank Protection (Upstream of Lumayong Bridge), Kabacan, North Cotabato22MI0010 · ₱48,999,996.61 · mapped
- CONSTRUCTION OF ROAD, KATIDTUAN - DAGUPAN - ARINGAY ROAD, KABACAN, NORTH COTABATO22MI0014 · ₱48,999,994.17 · mapped
- Construction of Revetment, Lumayong Flood Control Project (Downstream of Carmen Bridge, Kayaga to Sitio Punol, Phase II) along Pulangi River, Kabacan, Cotabato22MI0023 · ₱48,999,638.16 · mapped
- CONST. OF USM KABACAN FLOOD CONTROL ALONG KABACAN RIVER, USM KABACAN, COTABATO15MD0280 · ₱48,488,191.38 · mapped
- ROAD WIDENING - BUKIDNON - COTABATO RD - K1631+411 - K1632+799, K1632+842 - K1632+992, K1642+065 - K1642+462, CARMEN, NORTH COTABATO21MI0041 · ₱48,249,933.96 · mapped
- CONST. OF LUMAYONG FC (RIVER BANK PROTECTION W/ REVETMENT) ALONG BUK-COT RD, LUMAYONG, CARMEN, COTAB15MD0288 · ₱47,425,485.84 · mapped
- CONST. OF LUMAYONG FLOOD CONTROL PROJECT, KABACAN, COTABATO15MD0281 · ₱47,387,311.92 · mapped
- CONST. OF KABACAN FLOOD CONTROL PROJECT II ALONG KABACAN RIVER, USM, KABACAN, COTABATO17MD0023 · ₱46,647,198.02 · mapped
- CONST. OF LUMAYONG FLOOD CONTROL PROJECT II, LUMAYONG, KABACAN, COTABATO17MD0024 · ₱46,646,735.16 · mapped
- CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT (UGALINGAN SECTION-PHASE III), UGALINGAN, CARMEN, COTABATO19MD0033 · ₱46,543,250.25 · mapped
- Kabacan Flood Control Dike Phase II along Brgy. Magatos, Kilagasan and Cuyapon, Kabacan, North Cotabato21MI0052 · ₱43,424,992.69 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR), CARMEN, NORTH COTABATO20M00145 · ₱38,598,739.73 · mapped
- ROAD WIDENING - BUKIDNON - COTABATO ROAD, KIBUDTUNGAN, CARMEN, NORTH COTABATO18MD0072 · ₱37,267,764.77 · mapped
- KIDAPAWAN-CALUNASAN-MLANG RD - K1634+775-K1634+90025MI0078 · ₱29,231,357.51 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, RUPARAN SECTION, DIGOS CITY, DAVAO DEL SUR18LD0032 · ₱28,502,952.31 · mapped
- CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF LUMAYONG FLOOD CONTROL (UPSTREAM OF CARMEN BRIDGE), LUMAYONG, CARMEN, COTABATO18MD0077 · ₱26,531,385.26 · mapped
- REHABILITATION OF SITIO SAN ROQUE, BANGKAL-GUMITUYOM-SITIO KILONG, MANGA FMR, MATANAO, DAVAO DEL SUR17LD0056 · ₱19,289,691.43 · mapped
- Construction of Flood Control Dike along Kabacan River at Poblacion, Magpet, Cotabato22MC0062 · ₱9,900,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 12601
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Nov 29, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 12601); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
10 evaluations listed across 5 GPPB CPES releases; average final rating 91.7% over 3 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 5, 2024 | DPWH | ₱96,493,871.00 | On-going | 93.4% | — | 39th (rev), p. 133 |
| Jul 24, 2024 | DPWH | ₱96,247,838.00 | On-going | 93.9% | — | 38th, p. 153 |
| Jul 22, 2024 | DPWH | ₱67,497,521.00 | On-going | 95.7% | — | 38th, p. 153 |
| Apr 20, 2024 | DPWH | ₱66,367,430.00 | On-going | 88.8% | — | 38th, p. 154 |
| Apr 19, 2024 | DPWH | ₱72,167,177.00 | Completed | 97.6% | 91.7% | 38th, p. 153 |
| Sep 5, 2023 | DPWH | ₱172,167,177.00 | On-going | 87.7% | — | 36th, p. 130 |
| Mar 17, 2023 | DPWH | ₱44,100,000.00 | Completed | 86.8% | 89.3% | 35th, p. 108 |
| Mar 16, 2023 | DPWH | ₱48,999,989.00 | Completed | 90.4% | 94.1% | 35th, p. 108 |
| Oct 5, 2022 | DPWH | ₱66,197,704.00 | On-going | 93.1% | — | 35th, p. 108 |
| Jul 8, 2022 | DPWH (JV) | ₱47,127,343.00 | On-going | 87.6% | — | 34th, p. 53 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →