SILVER DRAGON CONST & LUMBER & GLASS SUPPLY INC is listed as a company organization in Philippine public procurement records on this site, with 15 linked DPWH project(s) totaling about ₱1,136,855,588.89. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
SILVER DRAGON CONST & LUMBER & GLASS SUPPLY INC
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 15
- Total value
- ₱1,136,855,588.89
- Published flags
- 6
- Region
- NEGROS OCCIDENTAL · Region VI
Online presence
Google Maps: SILVER DRAGON CONSTRUCTION LUMBER & GLASS SUPPLY, INC.★ 4.5 (34 reviews)Google Maps, 2026-10-22
Bakyas, JJ Gonzaga Village, Don Emanuel St, Mansilingan, Bacolod, 6100 Negros Occidental
Licensed officers (PCAB)
- Jerry Lesaca Sy · Authorized Managing Officer (PCAB license 30835) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SILVER DRAGON CONST & LUMBER & GLASS SUPPLY INC — not an accusation or finding of wrongdoing.
Score: 81.70 / 100 · Projects in sample: 15 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 78.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 78.1
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 11
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 15
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 15
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 15
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98/100 · Weight: 11%
- projects
- 15
- componentScore
- 98
- flagsPerProject
- 0.07
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
15 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF BYPASS AND DIVERSION ROADS, GINGOOG BYPASS ROAD, MISAMIS ORIENTAL (PHASE III), GINGOOG CITY, MISAMIS ORIENTAL20KK0137 · ₱264,595,534.40 · mapped
- WIDENING OF BRIDGE - BAGO BR. (B00195NR) ALONG BACOLOD SOUTH BY-PASS RD INCL. ROW18G00041 · ₱136,562,500.00 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 3 (B00354NR) ALONG BACOLOD SOUTH RD, BINALBAGAN, NEGROS OCCIDENTAL20GL0058 · ₱96,499,847.59 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00427NR) K0053 + 000 - K0056 + 74223GQ0043 · ₱96,496,657.20 · mapped
- REPLACEMENT OF BRIDGE- TALAVE BR. (B00182NR) ALONG BACOLOD NORTH RD.23G00036 · ₱95,500,000.00 · mapped
- Construction of Revetment with Floodwall in Banago Creek, Phase 3, Bacolod City22GO0079 · ₱58,857,280.00 · mapped
- Construction of Bank Protection Structure along Calumangan River, Bago City, Negros Occidental22GN0066 · ₱48,794,199.32 · mapped
- Construction of Bank Protection Structure along Ayungon River, Valladolid, Negros Occidental22GN0064 · ₱48,784,339.51 · mapped
- Construction of Flood Control Structure at Sibud Creek, Brgy. Poblacion, Bago City, Negros Occidental22GN0035 · ₱48,656,985.15 · mapped
- Construction of Bank Protection Structure along Bagonawa River, San Enrique, Negros Occidental22GN0061 · ₱48,642,285.17 · mapped
- Construction of Flood Control Structure at Calumangan River, Brgy. Calumangan, Bago City, Negros Occidental22GN0034 · ₱48,568,433.55 · mapped
- Construction of Waterway Structure along Sibud Creek, Bago City, Negros Occidental22GN0058 · ₱48,563,891.77 · mapped
- WIDENING OF PERMANENT BRIDGES, MARAGANDANG BRIDGE (B00365NR) INCLUDING ROAD RIGHT-OF-WAY (RROW) ALONG BAGO-MAMBUCAL ROAD (S00166NR), K0038+008 TO K0038+053, BAGO CITY, NEGROS OCCIDENTAL18GN0012 · ₱37,886,436.63 · mapped
- Construction of Revetment with Floodwall along Banago Creek (Phase 2), Sta. 0+000 to Sta. 1+947, Bacolod City, Negros Occidental21GO0078 · ₱29,400,000.00 · mapped
- Construction of Flood Mitigation Structure along Tibsok River, Municipality of San Enrique, Negros Occidental23GN0059 · ₱29,047,198.60 · mapped
Equipment & capacity
PCAB license
- License no.
- 30835
- Category
- AAAA · Large B
- Minimum net worth for this category
- ₱1,000,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Feb 28, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 30835); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
9 evaluations listed across 4 GPPB CPES releases; average final rating 91.6% over 6 rated projects; 8 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | ₱96,484,667.00 | Completed | 99.2% | 90.7% | 40th, p. 283 |
| Jun 27, 2025 | DPWH | ₱96,500,000.00 | Completed | 89.1% | 86.3% | 40th, p. 283 |
| Jun 2, 2025 | DPWH | ₱8,075,614.00 | Completed | 91.9% | 91.9% | 40th, p. 284 |
| Jun 2, 2025 | DPWH | ₱24,480,271.00 | Completed | 92.1% | 92.1% | 40th, p. 283 |
| Nov 5, 2024 | DPWH | ₱96,500,000.00 | On-going | 72.6% | — | 40th, p. 283 |
| Jun 24, 2024 | PPA (JV) | ₱568,765,395.00 | On-going | 97.7% | — | 38th, p. 153 |
| Sep 7, 2023 | DPWH | ₱64,276,297.00 | Final | 99.3% | 93.6% | 36th, p. 189 |
| Jul 1, 2022 | DPWH | ₱72,376,437.00 | Completed | — | — | 34th, p. 80 |
| Aug 24, 2019 | DPWH | ₱46,549,990.00 | Completed | 95.2% | 95.2% | 40th, p. 284 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →